Preparing a Curb Ramp Project December 15, 2010. 3 Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.

Slides:



Advertisements
Similar presentations
Accessible Pedestrian Signals (APS)
Advertisements

Signing Plan Design - At Grade Intersections Sample Plan Set
Detectable Warnings X Correct Placement if X < 5 feet
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Guide Signing.
ADA Requirements Well-designed sidewalks meet ADA requirements:
Office of Traffic, Safety, and Operations Sample Plan Set Signing Plan Design (At-Grade) June 20, 2012.
Draft Temporary Pedestrian Access Route (TPAR) Guidance
ADA Driveways and Ramps Sheila Lyons, PE David Joe Polly, PE, PLS, WRE Rodger Gutierrez, EIT Roadway Conference 2010.
1 ODOTs Complete Streets Initiative. 2 Tipping Point for Complete Streets.
Presented by: Mike Sisson February 23, It is the Law The Americans with Disabilities Act of It is the Right Thing to do Provide Equal Access.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
7 | Means of Egress (Life Safety Code)
July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Regional Bike Parking Workshop Marcia Maffei | Lane Transit District | point2point Jessica Roberts and Scott Mizée| Alta Planning + Design.
AASHTO SCOTE June 19 th, 2007 Update: Public Rights-of-Way Rulemaking Scott Windley, PROW Team Leader Dennis Cannon, Transportation.
Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
EA204 Environmental Technology Pavement Drainage Stormwater Sewer Design.
2015 Traffic Signals 101 Topic 3 Field Components.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Maintenance of Traffic (MOT)
Dowling Associates, Inc. Combining Pedestrian Plans & ADA Transition Plans Combining Pedestrian Plans and ADA Transition Plans Gail Payne Dowling Associates,
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
INTRODUCTION This chapter presents guidance on the application of geometric design criteria to facilities functionally classified as collector roads and.
Florida Department of Transportation, November 2009
Things to look for and remember while preparing FD05 Estimates.
Profile Leveling.
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
Chapter 13 Site Plan Layout.
Proposed Guidelines for Pedestrian Facilities in the Public Right-of-Way Scott J. Windley Accessibility Specialist US Access Board.
Some important pedestrian considerations 4-1. Skew increases crosswalk length, decreases visibility 4-2.
1 Starting a Project – Looking for footpaths or pushed down ROW fences Plan for your pedestrians or they will be walking through your project on the edge.
Euclid Corridor Design TRB BRT Workshop July 21, 2008.
Hawthorne & 16th Brian Marcum Chloe Ritter Collin Roughton.
Wes Marshall, P.E. University of Connecticut February 2007 CE 276 Site Design Chapter 3 –Slope Formula Application.
Safety Audit Components Safety assessment for risk Management.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
MnDOT Sample Plan - Jerry Kotzenmacher MnDOT
ESTIMATES UPDATE TRAINING BULLETINS FOR 2013 Melissa Hollis, Basis of Estimates Coordinator August 1, 2013 webinar.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Roundabout Study and Design EDSM Revisions
Things to look for and remember while preparing FD05 Estimates.
Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
County of Fairfax, Virginia Department of Transportation 1 Requirements for Pedestrian Improvements on Road Projects in the Board’s Six Year Priority Plan.
Chapter 15 Site Plan Layout. Driveway style and Slope Design Considerations  Minimum lawn slope of 5% for first 10’ (5/8” per foot)  Minimum concrete.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
Walking is for Everyone Ensuring Access for All Walking Summit October 29, 2015.
Access for Individuals who are visually impaired or blind Janet M. Barlow Accessible Design for the Blind 2015 Walking Summit October 29, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Complete Streets Training Module 10 – Street Elements: Design & Safety Considerations for Context-Based Solutions.
May 2010 Photo provided by the Trust for the National Mall U.S. Commission of Fine Arts Concept Review.
December 9, )Business cards 2)Open Meeting Laws/Training 3)Q-Storming Questions 4)Other.
9.6 Turning Roadways and Channelization, Types of Turning Roadways p.9-55 ~ 9-92 Lean how to determine minimum edge-of-traveled- way radii for the.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347 (DB Phase 3) Terry Rd. to Gibbs Pond Rd. Design-Build Project PIN , Contract No. D
Agenda Updates to Driveway and Sidewalk specifications and permits
General Road Construction Information
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
District 3 Complete Streets Projects
Motor Row Streetscapes
Safety Audit Components
School of Civil Engineering
Walker Street Reconstruction Project 25% Design Public Hearing
Department of Public Works Presented by Mark Zwoyer, PE
Presentation transcript:

Preparing a Curb Ramp Project December 15, 2010

3 Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans and identifying ramp types at each quadrant Signalized Curb Ramp Reconstruction with upgrades to APS or APS ready - Custom Design - Identifying Crosswalk Locations - Grades determined in the field New Construction/Reconstruction - Layout proposed curb ramps with X,Y,Z coordinates at curb lines, grade breaks, and push button stations

Non-Signalized Intersections Use curb ramp inventory and perform field walk to determine which ramps are non-compliant and need to be reconstructed with the project Determine whether surveying is needed or if a site visit is adequate to determine necessary pay items and choose appropriate ramp types Talk to local agencies/bike ped/ADA unit to determine: - If pedestrian crossings should be added, removed, or kept in place - If any future pedestrian facilities are planned or if the local government has a pedestrian master plan

Non-Signalized Intersections Select appropriate ramp types that are constructible at the chosen quadrant If standard ramp types will not work at a particular quadrant, then a custom ramp must be designed All pay items should be tabulated independently for each quadrant If radial truncated domes are needed the proposed radius and quantity must be provided for each quadrant

Signalized Intersections All signalized intersections in the project will be upgraded to APS or APS ready Surveys should locate: - All utilities including handholes, manholes, hydrants, gate valves, drainage structures, signal poles/cabinets, light poles, loop detectors, telephone/cable boxes, fiber optic vaults, and irrigation/sprinkler heads or services - Buildings and doorways, other permanent features in sidewalk areas such as landscaping, retaining walls, benches, sign posts, etc., - Crosswalk striping, curb and gutter, sidewalk edges 30 in both directions(mainline and side street), Median locations - ROW in areas where the construction limits may fall close to or outside existing ROW

Signalized Intersections All Signalized Intersections should have a separate 20 scale intersection detail sheet that shows: - All signal system components: poles, cabinets, handholes, and pedestrian push button stations - Proposed curb ramp construction including truncated domes, ramps, landings, grade breaks, flares, and curb and gutter - Proposed crosswalk locations, provide X,Y coordinates of the points where the outside edge of the proposed crosswalk intersects the curb line at the curb face - Contractor will use the Crosswalk Control Points to layout push buttons and ramps Two primary designs for APS curb ramps - 1) Two separate perpendicular ramps - 2) Depressed Corner

Locating APS Push Buttons It is important to note that APS Push Buttons and curb ramp designs are integral to each and are difficult to design and construct apart from one another Buttons should be located between 1.5 feet and 10 feet from the back of curb, shoulder, or pavement edge Buttons should be located at the projected outside edge of the crosswalk and no more than a 5 foot offset from the outside crosswalk edge Buttons should have a minimum 10 feet of separation between them Buttons should be placed adjacent to a landing Buttons should be mounted at a height of 42 and no more than 48

Best Practices in Locating APS Maintain a 6 foot MAR (Maintenance Access Route) around ped stations Locate ped stations at least 4 feet back from the back of curb and ideally 6 feet from back of curb Keep button outside truck turning radius Dont obstruct walk/trail Center the push button on the landing Mount push button on signal pole when it is in an appropriate location

New/Reconstruction Provide an Intersection Detail sheet for each intersection Provide curb ramp designs showing ramps, landings, truncated domes, grade breaks, and APS Provide X,Y,Z coordinates of all grade breaks on all pedestrian access routes until they reach the Typical Section Provide X,Y,Z coordinates of APS push button stations Design tolerances – 0.25% to 0.50% less than maximum allowable grades

Shared-Use Trails Mn/DOT Bike Manual states that grades in excess of 8.3% (1/12) exceed ADA Accessibility Guidelines - This is true, however when constructing a pedestrian facility at an 8.3% grade, a landing must be provided for every 30 inches of vertical rise (30 feet at 8.3%) - To avoid having to construct landings, design trails with a maximum running slope of 5 percent (4.5% -4.75% for construction tolerance) - Cross slope is still 2.0% maximum Truncated Domes should be full width of the trail - It is unlikely domes will be directional due to 5 foot maximum setback When providing APS, realign trails to come in behind the push button stations and encroach upon clear space requirements if necessary