Office of Traffic, Safety, and Operations June 20, 2012 Arden Hills Training Center Signing Plan Design At-Grade.

Slides:



Advertisements
Similar presentations
Learner-Centered Education Course Redesign Initiative Builds upon work of prior LCE grants Will award grants of $40,000 - $50,000, with the option.
Advertisements

DISTRICT AND SCHOOL ASSESSMENT & TECHNOLOGY COORDINATOR ONLINE TESTING WEBINAR FEBRUARY 7 AND 9, 2012 Washington Online Testi ng OSPI Office of Superintendent.
District 4 Sign Assessment and Replacement Design- Build Project Request for Qualifications Information Meeting April 17 th, 2007.
Accessible Pedestrian Signals (APS)
Signing Plan Design - At Grade Intersections TEM Chapter 6-4
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Regulatory Signs.
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Warning Signs.
Office of Traffic, Safety, and Operations Application Guidelines Regulatory Signs Signing Plan Design (At-Grade) June 20, 2012.
Office of Traffic, Security, and Technology Guide Sign Design June 18-19, 2013 Arden Hills, MN.
Signing Plan Design - At Grade Intersections Sample Plan Set
Office of Traffic, Safety, and Operations General Principles of Traffic Signing Signing Plan Design (At-Grade) June 20, 2012.
Signing Plan Design - At Grade Intersections Course Overview.
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Guide Signing.
Office of Traffic, Security, and Technology Guide Sign Design June 18-19, 2013 Arden Hills, MN.
Application Guidelines Guide Signs
* 07/16/96 Guide Sign Design June 18-19, 2013 Arden Hills, MN *
Office of Traffic, Safety, and Operations Sample Plan Set Signing Plan Design (At-Grade) June 20, 2012.
February 14, Help promote Plans for additional guidance materials Overview of new materials Provide feedback Agenda 2.
Access Management in Indiana Transportation Planning and Traffic Calming Part II June 21, 2007.
Course Registration Overrides SLCM_WP_220 1SLCM_WP_220 Overrides.
CMPT 275 Software Engineering
 Crashes at rural STOP controlled Intersections  Primary cause where drivers stopped before entering:
 Crashes at rural STOP controlled Intersections  Primary cause where drivers stopped before entering:
1 March 14, 2013YMPO RTP Technical Advisory Committee Meeting.
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD Revisions to Part 7 – Traffic Control for School Areas.
2008 Mid-States Highway–Rail Grade Crossing Safety Conference May 20, 2008 David Peterson.
FHWA Report on MUTCD Activities Chung Eng, FHWA Office of Transportation Operations NCUTCD Meeting – June 26, 2014.
Office of Traffic, Safety and Technology Chapter 3 Why Signs are Installed Traffic Signs 101 November 20, 2014.
Overview of 2009 MUTCD. Tom McDonald, PE Safety Circuit Rider Iowa LTAP.
Office of Traffic, Safety and Technology Chapter 1 Introduction Traffic Signs 101 November 20, 2014.
2008 Mid-States Highway Rail Grade Crossing Safety Conference.
Traffic Engineering Traffic Control Devices. Traffic Control Traffic engineers do not have any control over individual drivers need to develop devices.
Technical Report Writing and Presentation Skills Course Outline 1.
Office of Traffic, Safety and Technology Chapter 7 Signing Plan Sets Traffic Signs 101 November 20, 2014.
Office of Traffic, Safety and Technology Guide Sign Design June 17-18, 2015 Arden Hills, MN.
Office of Traffic, Safety and Technology Chapter 4 Types of Signs Traffic Signs 101 November 20, 2014.
2015 Traffic Signals 101 Topic 1 Why?. Office of Traffic, Safety, and Technology Why? Who initiates a signal? Developer City/County Politician Public.
Manual on Uniform Traffic Control Devices Aren Cambre
Office of Traffic, Safety, and Operations Application Guidelines Warning Signs Signing Plan Design (At-Grade) June 20, 2012.
Office of Traffic, Safety and Technology Chapter 2 Signing Overview Traffic Signs 101 November 20, 2014.
2-1 LOW COST SAFETY IMPROVEMENTS The Tools – Identification of High Crash Locations – Session #2.
BUSINESS SENSITIVE 1 Annual Meeting of the AASHTO Subcommittee on Design Human Factors Guidelines (HFG) for Road Systems (NCHRP 17-41) July 22, 2009 John.
Enhancing Highway Safety: Applications of the Human Factors Guidelines (HFG) for Road Systems Presentation to the 2015 Annual Meeting of the Western Association.
Office of Traffic, Security, and Technology Guide Sign Design June 18-19, 2013 Arden Hills, MN.
RAILROAD-HIGHWAY GRADE CROSSING HANDBOOK AUGUST 2007 REVISION PRESENTED BY KURT ANDERSON 2008 Mid-States Highway Rail Grade Crossing Safety Conference.
Heather Lott, PE State Signing Engineer Minnesota Department of Transportation Supplemental Signs & Costs.
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
T R A F F I C C O N T R O L P L A N S D E S I G N TRAFFIC CONTROL PLANS W H A T & W H Y Traffic Safety & Construction Staging Plan Traffic Safety & Construction.
Office of Traffic, Safety and Technology Guide Sign Design June 17-18, 2015 Arden Hills, MN.
Revisions to Chapter 2C – Warning Signs and Object Markers
ODOT Sign Design. Who Every Sign Designer Should Know TEOS Standards Engineer Operations Engineer –Region Traffic Engineers
Section 1: Introduction
MnDOT Intelligent Transportation Systems Project Management Design Course Section 6: Discussion.
Education Task Force Joe Jeffrey, Marty Weed, Mike Metzig, Rob Bushman Purpose: increase educational outreach for ITS Council Expo workshops / activities.
Temporary Pedestrian Accommodations in Utility Work Zones Rebecca Klein, PE Regional Work Zone Engineer ,
Indiana MUTCD: for Operations & Maintenance Issues/Solutions – Part II.
Chapter 3 Regulatory, Warning & Guide Signs Overview
Chapter 1 Introduction Sign Plan Design for At-Grade Intersections
Chapter 2 General Principals of Traffic Signing
Chapter 8 Specifications & Special Provisions
Signing Plan Design - At Grade Intersections TEM Chapter 6-8
Chapter 3 Regulatory, Warning & Guide Signs Overview
Chapter 8 Specifications & Special Provisions
Chapter 3 Regulatory, Warning & Guide Signs Overview
* 07/16/96 Chapter 1 Introduction Traffic Signs 101 April 24, 2018 *
Chapter 4 Types of Signs Traffic Signs 101 April 24, 2018.
Chapter 1 Introduction Sign Plan Design for At-Grade Intersections
Chapter 6 Sign Components
Chapter 5 Select Figures from MN MUTCD
Presentation transcript:

Office of Traffic, Safety, and Operations June 20, 2012 Arden Hills Training Center Signing Plan Design At-Grade

Office of Traffic, Safety, and Operations 2 Signing Plan Design (At-Grade) Class Kickoff Introductions –Facilitators John Albeck – Albeck + Associates –Technical Experts Heather Lott – MnDOT Rick Sunstrom – MnDOT –Attendees

Office of Traffic, Safety, and Operations 3 Signing Plan Design (At-Grade) Course Information Focus –Practical application of signing and plan design –At-grade intersections, conventional highways, and expressways Purpose –To enable traffic personnel to acquire basic design skills in assembling signing plans for at-grade intersections on conventional highways and expressways

Office of Traffic, Safety, and Operations 4 Signing Plan Design (At-Grade) Course Information Content –Primary Reference Documents Traffic Engineering Manual (TEM) Chapter 6 Review Sample Plan Set –Supplemental Documents Traffic Signs 101 TEM Chapter 7 - Delineators & Markers MN MUTCD MnDOT Standard Signs Summary MnDOT Standard Signs Manual

Office of Traffic, Safety, and Operations 5 Mn/DOT Training Program Mn/DOT Training Program Traffic Signals 101 Traffic Signal Design Traffic Signal Timing & Coord. At-Grade Signing Plan Design Freeway Signing Plan Design Guide Sign Design Roadway Lighting Design Intersection Control Eval. (ICE) Spring 2009 April 22-24, 2008 Spring 2009 Today! April 29, 2008 Fall 2008 ??

Office of Traffic, Safety, and Operations 6 Signing Plan Design (At-Grade) Course Information Agenda –TEM General Principles of Traffic Signing –TEM App. Guidelines – Regulatory Signs –TEM App. Guidelines – Warning Signs –TEM App. Guidelines – Guide Signing –TEM App. Guidelines – Misc. Signing –Sample Plan Set –FINAL EXAM

Office of Traffic, Safety, and Operations 7 Signing Plan Design (At-Grade) Course Information Manual –Tab 1: Introduction –Tab 2: TEM Chap. 6 –Tab 3: Plan Set –Tab 4: Appendix A: ITE Signing Priorities B: Sign Symbols Overview C: Type C & D Sign Post Length Determination D: 2011 MN MUTCD Table 4C E: Mast Arm Bracketing Memo F: 2011 MN MUTCD Additional Sections

Office of Traffic, Safety, and Operations 8 Signing Plan Design (At-Grade) Course Information Manual –Text Covered in Course

Office of Traffic, Safety, and Operations 9 Signing Plan Design (At-Grade) Course Information Manual –Handouts

Office of Traffic, Safety, and Operations 10 Signing Plan Design (At-Grade) Course Information Contact Information

Office of Traffic, Safety, and Operations 11 Signing Plan Design (At-Grade) Course Information MnDOT OTST Website