Ron Bumann Construction Practices Specialist State Aid for Local Transportation 1123 Mesaba Avenue Duluth, MN.. 55811 cell: 218/310-1644

Slides:



Advertisements
Similar presentations
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Assessing Quality of Asphalt Paving Jobs to Determine Contractor Pay Robin C. Wurl James R. Lundy 2003 Quality & Productivity Research Conference.
“Train the trainers” seminar
Presented By WVDE Federal Programs Staff July 15, 2009 Title III Monitoring and Fiscal Updates.
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
A Deluge of Data New Numbers Flow from Census 2000 James Hibbs Minnesota State Demographic Center.
Oklahoma DOT Changes in Superpave Specifications to Address Permeability.
Metro District State Aid Construction Training
Metro Muncipal Agreement Program
Specification Summary Where weve Been & Where we are Now (A Review of Past & Present Specifications) By: John Garrity Dave Holt, and Ron Bumann.
Mn/DOT AUDIT 2011 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE SINGLE AUDIT DISCUSSION.
Mn/DOT AUDIT 2010 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE SINGLE AUDIT DISCUSSION.
MnDOT 2007 Pilots n Mixture Sampling Modification –Increase randomness of sampling. »Sample is split in the field and stored in containers labeled with.
Primary* Refugee Arrivals MN by Region of World Primary* Refugee Arrivals to MN by Region of World Refugee Health Program, Minnesota.
Refugee Arrivals to MN by Region of World *
Primary* Refugee Arrivals MN by Region of World Primary* Refugee Arrivals to MN by Region of World Refugee Health Program, Minnesota.
Construction Materials
Miscellaneous Construction Topics -The 2013 Version.
The basics for simulations
2013 C&MS Pavements Specification Updates Craig Landefeld, P.E. Construction Pavements Engineer.
Connecticut Mastery Test (CMT) and the Connecticut Academic Achievement Test (CAPT) Spring 2013 Presented to the Guilford Board of Education September.
Introduction to Records Management Policy
S.P MnROAD Reconstruction Pre-Letting Conference April 8, 2011.
RMS R83 Edition 3 Rev 0 ASCP Forum 24 Feb 2014 TSM CIVIL.
Overview of Property Tax Valuation and Equalization
Joint Commission Management of Human Resources Leadership Meeting September 22, 2010.
OGISD Board of Trustees September 19, 2011 Orange Grove Elementary Accountability Report.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Static Equilibrium; Elasticity and Fracture
National Student Survey in the School of Earth and Ocean Sciences.
Chapter 8: Dialysis Providers 2014 ANNUAL DATA REPORT VOLUME 2: E ND -S TAGE R ENAL D ISEASE.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
2015 State Aid Conference Ramsey County Office Arden Hills, Mn February 19, 2015.
Joe White (608) Wayne Chase (608) WisDOT Materials Management Section 1.
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
Tolerances and Price Impacts Presented by:- Er. Bhagawan Shrestha.
Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013 Ohio’s Composting Program Barry Chapman and Jen Hagar.
Bituminous Street Recertification Initiatives. Initiative Items n Stone Matrix Asphalt (SMA) n Longitudinal Joint Spec and other methods for longitudinal.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
1 Quality Control Program. 2 Objectives To know: To know: –How the QC Program is Doing –Effect of Specification Changes on the QC Program –Contractor.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
1 Overview CQC Asphalt Specifications.  Payment based on Contractor’s Quality Control tests.  FDOT runs verification tests at a lesser frequency. 
Asphalt Quality Assurance Program
2002 FDOT/FTBA Construction Conference
Update on End Result Specifications Celik Ozyildirim, Ph.D., P.E.
Florida Department of Transportation 1 Overview of CQC Asphalt Specifications.
Overview of the New Hot Mix Specifications Dale A. Rand, P.E. TxDOT Construction Division Flexible Pavements Branch TRB AFK10 Committee Meeting April 20-21,
Developing a Mixture-Based Specification for Flexible Base.
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
Allen Hughes State Materials Office
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
MnDOT AUDIT COUNTY HIGHWAY ACCOUNTANTS
2017 D4 COUNTY/CITY TECHNICIAN MEETING
Office of Materials and Road Research
QC Document Update Todd Shields, INDOT.
Acceptance Process for Manufactured Products by Certification:
Chip Seal Quality Assurance Guide
Quality Assurance for Emulsified Asphalt Surface Treatments
Prime Factors for Successful Preservation Treatments
Presentation transcript:

Ron Bumann Construction Practices Specialist State Aid for Local Transportation 1123 Mesaba Avenue Duluth, MN cell: 218/ html

Mn/DOT AUDIT STATE AID FOR LOCAL TRANSPORTATION DIVISION FISCAL YEAR 2010 SINGLE AUDIT

11 City/County Projects Audited Fiscal Year 2010 St. Louis County $1,895,908 Cook County $3,159,060 Kittson County $809,842 Kittson County $774,234 City of St. Michael $2,153,763 City of Moorhead $17,720,630 Traverse County $1,441,828 Goodhue County $2,996,740 Steele County $3,875,394 Martin County $2,443,450 City of Richfield $25,224,918 City/County Project Total $62,495,767

FINDING 1 – ADDITIONAL PROJECT MANAGEMENT ATTENTION NEEDED TO ATTAIN COMPLIANCE WITH MATERIALS CONTROL REQUIREMENTS FOR BRIDGE CONCRETE AND STEEL Certified Mill Test Reports were not obtained for 18% of the bridge structural steel valued at $4.8 million. Monthly concrete aggregate quality testing not done. Material passing the #200 sieve for coarse aggregate testing, required as part of aggregate quality testing, was not done. Slump tests not taken after corrective action. Project personnel missed concrete admixture testing for the air entraining agent and water reducer.

After receiving written instruction to ensure that the concrete was properly mixed, the Contractor continued to place concrete into the roadway that was not properly mixed. All 4 Quality Assurance (QA) tests for material passing the #200 sieve for coarse aggregate did not meet requirements, with results ranging from 1.08 to 2.39 percent compared to the standard of 1.0 percent. All 4 Contractor Quality Control (QC) tests met requirements. Acceptance is based on QA results. Project personnel did not perform additional Quality Assurance (QA) testing required to verify corrective action taken. Project management was unaware of the tests not meeting requirements of which was identified by the audit. Cores for thickness not taken FINDING II – NEED TO IMPROVE COMPLIANCE WITH MATERIALS CONTROL REQUIREMENTS FOR PAVING CONCRETE

Questioned costs totaled $1.3 million, a significant improvement over the Fiscal Year 2009 Grading and Base Materials Control questioned costs total of $9.9 million. However, the Audit Report recommends taking appropriate action as necessary to hold responsible personnel accountable. Bitumen Content – Sample and test prior to placement. Quality Assurance Gradations – Review the Random Sampling Gradation Acceptance Method. Moisture Content – Requirement of Quality Compaction, unless modified in the special provisions. Grading & Base Reports are required to be submitted to the Grading and Base Office. Review specifications for crushing requirements. FINDING III – IMPROVEMENTS NOTED FOR GRADING AND BASE MATERIALS CONTROL COMPLIANCE

Review the special provisions and Schedule of Materials Control for testing requirements. Review the special provisions and specifications placement requirements. FINDING IV – NEED TO COMPLY WITH MATERIALS CONTROL REQUIREMENTS FOR STABILIZED FULL DEPTH BITUMINOUS PAVEMENT RECLAMATION

Project personnel did not ensure that the Notification of Intent to Perform a Bridge Demolition was submitted to Minnesota Pollution Control Agency 10 days prior to the start of demolition as required. Project personnel used a Local Bridge Replacement Program Asbestos Screening Tool to assess asbestos for a bridge removal. The screening tool did not address other regulated materials, such as lead. The bridge materials included lead paint. 40 Code of Federal Regulations requires an inspection prior to demolition. Minnesota Rules Chapter requires the inspection to be performed by a person certified by the Minnesota Department of Health. These processes are required regardless of funding types. Proper documentation of disposition of materials is crucial to the requirements. FINDING V – BRIDGE AND BUILDING REQUIREMENTS WERE NOT MET

/index.html

construction.html

bituminous.asp

% Density (2) SP Wear, and SP Shoulder (4% Void) % Density (2) SP Non-Wear, SP Shoulder (3% Void) Mat Density Pay Factor A Traffic Level 2 & 3 Traffic Level 4 & and above94.6 and above1.03 (3) 1.05 (3) 93.1 – – (3) 1.04 (3) Less than 89.0Less than 90.0 (4) DRAFT / NEW Table B4 Payment Schedule for Maximum Mat Density

% Density (2) Long. Joint (Confined Edge) LJ Pay Factor B (Confined Edge) % Density (2) Long. Joint (Unsupported Edge) LJ Pay Factor C (Unsupported Edge) Traffic Level 2 & 3 Traffic Level 4 & 5 Traffic Level 2 & 3 Traffic Level 4 & and above1.02 (3) 1.03 (3) 91.0 and above 1.02 (3) 1.03 (3) (3) 1.02 (3) (3) 1.02 (3) Less than Less than DRAFT / NEW Table B4a LJ (5) Payment Schedule for Longitudinal Joint Density (SP Wear and SP Shoulder (4% Void)

% Density (2) Long. Joint (Confined Edge) LJ Pay Factor A (Confined Edge) % Density (2) Long. Joint (Unsupported Edge) LJ Pay Factor B (Unsupported Edge) Traffic Level 2 & 3 Traffic Level 4 & 5 Traffic Level 2 & 3 Traffic Level 4 & and above1.02 (3) 1.03 (3) 92.0 and above 1.02 (3) 1.03 (3) (3) 1.02 (3) (3) 1.02 (3) Less than Less than DRAFT / NEW Table B4b LJ (5) Payment Schedule for Longitudinal Joint Density (SP Non-Wear and SP Shoulder (3% Void))

Crow Wing County

Pine County

Hubbard County - Benedict

St Louis County - Ely

St Louis - Ely

Park Rapids

Norman County

CSI – Patcher

Douglas County

City of Duluth

Clay County

Park Rapids

Pine County

Crow Wing

City of Grand Rapids

Aitkin County

City of Brainerd

Deck Failure

Becker County – Detroit Lakes

City of East Grand Forks

Aitkin County – Hill City

City of Moorhead

Blue Earth - Mankato

Polk County – Red River

St Louis County – Giants Ridge

Todd County - Staples