Six Sigma at Academic Medical Hospital

Slides:



Advertisements
Similar presentations
TRANSFORMING HEALTH CARE FOR THOSE WE SERVE Maintaining the Gain Process Ownership & Accountability Teresa Pinter, RN, Managing Master Black Belt Performance.
Advertisements

Lean Six Sigma Project Presentation Template
Acknowledgements RHH ED staff Safety and Quality Unit RHH for their participation and valuable contribution Next Steps It is envisaged over the next 12.
Participants Jean Bruggemeier, RN Jacqueline Ciombor Geoffrey Emerick, MD Dianna Greening, RN Marilyn Hauser, MBA Nancy Quandt, RN Peggy Squires, LPN Tammy.
Six Sigma Green Belt: Overview Robert Setaputra. What is Six Sigma? Six Sigma is the relentless and rigorous pursuit of the reduction of variation in.
Hospital Off-Load Process Improvement Team February 23, 2007.
Healthcare Operations Management © 2008 Health Administration Press. All rights reserved. 1.
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
The Role of Information Technology For A Private Medical Practice Noel Chua Rosalinda Raymundo.
Roberto lopez LSSMBB DMAIC project template.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
1. 2 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Advocate Good Samaritan Hospital DVT/PE Reduction Project Michael McKenna, MD VP, Medical Management.
Overview of Lean Six Sigma
Premium Reduction & Delivery Improvement
Charting a course PROCESS.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Development of Six Sigma
Managing Project Quality
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Process Improvement at Home Depot
TransforMED Lessons from the National Demonstration Project Lori Heim MD FAAFP.
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
DMAIC Process Storyboard
Morning Briefings and Huddles
Six Sigma Method for QI & PI MHS 665 William C. Brannan, MD.
Team Chartering Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training free six sigma site.
EmEx-Compare Emergency Department Benchmarking Improve ED Performance Benchmark your ED to similar EDs and best practices Measure your performance on.
Group 4 Problem Statement : The CEO asks us to set up an Office of Patient Experience. We are tasked to develop 2 projects focusing on superb customer.
Methods 1.ED Overcrowding at 60,000 annual encounters (50% above capacity) 2.Medical staff use of ED to evaluate and write holding orders for evening admissions.
Healthcare Performance and Measurement Tools Tom Knoebber Mission Hospitals Asheville, North Carolina.
Welcome to Lean Six Sigma Green Belt Training
OPERATING ROOM DASHBOARD Virginia Chard, RN, BSN, CNOR
By: Nick Blank March 1, Six Sigma Definitions Goals History Methods Roles Benefits Criticism Software Development.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
1 LSSG Green Belt Training Control: How do we make it happen at a controlled speed?
What did the team do? The project was What happened next? Temporarily Suspended.
Implementing QI Projects Title I HIV Quality Management Program Case Management Providers Meeting May 26, 2005 Presented by Lynda A. O’Hanlon Title I HIV.
Thibodaux Using Six Sigma to Reduce Pressure Ulcers Thibodaux Regional Medical Center Darcy Prejeant & Sheri Eschete August 20, 2007.
Nicole Sutherlin Brianna Mays Eliza Guthorn John McDonough.
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Project Storyboard (Page 1 of 2)
ED Stream Workshop Acute MOC
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Six Sigma at Academic Medical Hospital
© 2003 Six Sigma Academy0 The Roles of Six Sigma Champion Workshop.
IT Project Management, Third Edition Chapter 8 1 Chapter 5: Project Quality Management.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Cindy Tumbarello, RN, MSN, DHA September 22, 2011.
Context and Problem Effects of Changes Strategy for Change Aim: To reduce the length of handover by standardising the quality of information transmitted.
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
DRIVING IMPROVEMENTS Through Six MahindraSatyam
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Lean Six Sigma Black Belt Project Improving Throughput to Provider
Six Sigma Approach.
Six Sigma.
Description of Revision
OPS/571 Operations Management
LTC Trend Tracker Peggy Connorton, MS, LNFA
Quality Management Six Sigma
Title: Owner: Ver: Date:
Title: Owner: Ver: Date:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
The 7 Basic Quality Tools ~ The DMAIC Process
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

Six Sigma at Academic Medical Hospital The following presentation was developed by Jane McCrea, Black Belt of the ED Wait Time Project at Academic Medical Hospital. The presentation follows the DMAIC methodology.

Six Sigma--DMAIC Define: Define and scope problem. Identify potential benefits and critical to quality (“CTQ”) factors. Measure: Identify the key internal process that influences CTQ characteristics and measure the defects generated relative to the identified CTQs. Confirm measurement system reliability. Know voice of customer. End result: team can successfully measure the defects generated for a key process affecting the CTQ. Analyze: Identify root causes of defects. Use statistical data tools to identify key process inputs that affect process outputs. End result: explain variables that are likely to drive process variation the most. Improve: Determine and confirm optimal solution (statistically re-analysis). Identify the maximum acceptable ranges of key variables. End result: modify the process to stay within the acceptable ranges. Control: Ensure that modified process now enables the key variables to stay within the maximum acceptable ranges using tools such as metric dashboards and accountability reporting.

ED Wait Time Define Project Description six sigma The Way We Work Champion Dr. Gerry Elbridge Sponsor Dr. Terry Hamilton Black Belt Jane McCrea Green Belt Dr. James Wilson Foundations Team Nancy Jenkins, Bill Barber, Georgia Williams, Steve Small Project Description Reduce and consistently maintain patient wait times from triage start to first physician interaction at established thresholds. EXPECTED BENEFITS Customer: Critical to Quality (CTQ) Reduce Wait Time Internal: Critical to Quality (CTQ) Improve Patient/Staff Satisfaction Enhance Patient Outcomes Increase ED capacity and operational efficiency Arrival Triage Register Lobby Tx Room Nurse MD

What was the Voice of the Customer? Measure What was the Voice of the Customer? Patient Survey N = 30; Priority II Patients Random: all days, all shifts Patient Survey Results Wait Time Expectations: 10-20 minutes: 43% 20-30 minutes: 23% Patient Survey Results Wait Time Satisfaction Very Satisfied: 37% Very Dissatisfied: 37%

Baseline Measurements An observational prospective manual time study yielded baseline measurements for the total wait time Triage Start to MD Start Mean: 62.5 min. Std. Dev: 39.66 Z-Score: 1.79 Defect Rate: 38.6% USL: 37.1 min. The Upper Specification of 37.1 is shown as a yellow vertical line.The z Score is the number of Sigma above mean.The rectangle at the bottom of the graph is the 95% Confidence Level for mean 20 60 100 140 180

Key Takeaway: 40% Wait Reduction & Operating Margin Gains Measure What did we measure? Y: # of Minutes, from Triage Start to First Physician Interaction Specification Limit: 37 minutes Specification Validation: Internal experts & data, External benchmarks Defect: Wait time > 37 minutes Unit: One priority II patient visit with one defect opportunity each Measurement System: Patient Survey, Manual Data Collection, Chart Review, Quality Reports, Registration & Staffing Reports Impact on Business: 25 min. Line of Sight Reduction Per Patient Resulting = Capacity Opportunity Improved Patient Satisfaction, Reduced Complaints, Enhanced Outcomes Improved Staff Satisfaction & Reduced Turnover Improved Daily ED Operational Efficiency Key Takeaway: 40% Wait Reduction & Operating Margin Gains

What critical X’s were tested as being root causes of the problem? Environment People Materials Analyze ED patient volume ED patient acuity Influx of squad patients Referral volume Clinics schedules OR volume Hospital patient volume ED tx room limits/facility constraints Staffing levels Experience & skill level Resident specialty Volunteer/greeter utilization Family needs Role clarification Match of skill sets and assignments Variation of practice Availability of supplies Triage process Registration/Chart prep process Charting procedures  Communication Availability of diagnostic equipment Availability of trams, pumps, etc. Non-optimization of Tracking system Inadequate IS system for tracking/trending No Physician Prescription Writing system No integrated, on-line charting system Quality of measurement Are we measuring the right things? What do we do with what we measure? Need to do more than “track” Feedback systems to quality auditing Need for Improved flow sheet format Lack of on-line charting system for automated monitoring   Utilization of minor emergency unit Ancillary services levels Specialty testing delays  ED used as admission unit ED discharge practice Hospital discharge process/timing Consult responsiveness/practices Use of ED for boarding Measure Machines 23 variables & 18 time stamps Analyzed via 2nd. wave of data collection Patient Volume-Related: 10 Staffing Volume-Related: 5 Staffing Mix-Related: 5 Misc: 3 Segmentation/delineation Sequential care vs. parallel processes Methods Improvement implementation/maintenance ownership

Improve What critical X’s were tested as being root causes of the problem? 23 variables selected & analyzed through second wave of data collection Census-Related: 10 Staffing Related: 5 Coded: 5 Miscellaneous: 3   What root causes were confirmed and tested in the pilot? Patient Flow Direct-to-bed flow & bedside registration Patient relocation to semi-private space when appropriate Flow Facilitator Care Team Communication Modified Zoning Communication Board Clinical Protocols Streamlined Order Entry & Results Retrieval Process

Pilot Design Fishbone diagramming, data collection and statistical analysis determined the Critical X’s (contributing factors) as key components for the randomized pilot. Patient Flow Direct-to-bed flow; Relocation to semi-private space Care Team Communication Zoning; Communication board; Clinical protocols Streamlined Order Entry & Results Retrieval Uses central clerk Important link here: Larry Bossidy, former GE exec and CEO at Allied and Jack Welch

What were the pilot factors and results? Improve What were the pilot factors and results? Patient Flow Direct-to-bed flow & bedside registration Patient relocation to semi-private space when appropriate Flow Facilitator Care Team Communication Modified Zoning Communication Board Clinical Protocols Streamlined Order Entry & Results Retrieval Process Lobby Target 15 min. Study 2 N = 129 Pilot N = 172 Wait Time 34.5 min. 12.6 min. % Defect 51.2% 22.8% MD Target 8 min. Study 2 N = 129 Pilot N = 172 Wait Time 11.2 min. 8.9 min. % Defect 42% 34.9%

PILOT RESULTS Lobby WT Study 1 N =30 Study 2 N = 129 Pilot N = 158 MD WT N = 30 N = 127 N = 172 Mean WT (minutes) 31.2 34.5 12.6 16.1 11.2 8.9 Standard Deviation 26.65 16.02 11.69 18.70 46.76 16.68 % Defect 56.7% 51.2% 22.8% 55% 42% 34.9% Z-Score (Attribute) 1.33 1.47 2.25 1.37 1.71 1.89 Important link here: Larry Bossidy, former GE exec and CEO at Allied and Jack Welch

PILOT CONCLUSIONS 0.001 2.7 to 31.8 0.000 4.8 to 13.2 0.016 Mood’s Median Test Pilot lobby wait times were better than the established 15 min. target, the defect rate tumbled, and the C.I. validated statistical significance. Results for MD wait times were statistically significant in one of two Mood’s median tests. Positive trending was demonstrated in the comparison of Study 2 to the Pilot. Stakeholders supported department-wide, multi-patient population implementation. P-value 95% C.I. Lobby WT Study 1 to Pilot 0.001 2.7 to 31.8 Study 2 to Pilot 0.000 4.8 to 13.2 MD WT 0.016 1.0 to 16.0 0.772 -2.00 to 3.00 Important link here: Larry Bossidy, former GE exec and CEO at Allied and Jack Welch Lobby WT N MD WT N Study 1 30 Study 2 129 127 Pilot 158 172

Improve

What are the building blocks of Control? Guidelines & Assigned Responsibility New Standard Operating Procedure Detailed Who, What and When plan Data Review, Reporting & Accountability Quarterly manual/automated data analysis Monthly reports and control charts Use of Corrective Action Log per guidelines Monthly reports Scheduled reporting to executive leadership Quarterly review to owner peers & executives Communication & Recognition Monthly updates to dept. communication center & newsletter Monthly updates at staff, faculty & resident meetings Incorporation of staff recognition for ongoing positive results