District 4 Sign Assessment and Replacement Design- Build Project Request for Qualifications Information Meeting April 17 th, 2007
Project Goals Safety Safety 1. Project design consistent with MnDOT standards 2. Traffic Control according to Field Manual 3. Permanent signs meet current standards Quality and Budget Quality and Budget 1. High quality project minimizing future maintenance 2. Meet or exceed the requirements of the project 3. Accurate and complete transfer of sign inventory data
Project Goals Schedule Schedule Permanent signs installed by November 30, 2007 Mobility Mobility 1. Maintain traffic during installation of new signs 2. Permanent signs to maintain the mobility of the traveling public
Scope of Work Assess existing signs and identify adjustments, relocations, additions, deletions to meet current MN MUTCD, Mn/DOT Standard Signs and Traffic Engineering Manual Standards and Project requirements. Assess existing signs and identify adjustments, relocations, additions, deletions to meet current MN MUTCD, Mn/DOT Standard Signs and Traffic Engineering Manual Standards and Project requirements. Design of guide sign panels using SignCAD Software Design of guide sign panels using SignCAD Software Installation, adjustments, relocations, additions, and deletions according to engineering assessment. Installation, adjustments, relocations, additions, and deletions according to engineering assessment. Development of an accurate database Development of an accurate database
Notifications Single Point of Contact – Dan Kuhn Single Point of Contact – Dan Kuhn Design-Build Website Design-Build Website ( ( notifications notifications
Questions ? ? ? ? ? ? ?