1. 2 Business Process Reengineering (BPR) “the fundamental rethinking and redesign of processes to achieve dramatic improvements in critical, contemporary.

Slides:



Advertisements
Similar presentations
Selecting a Methodology for BPR
Advertisements

Program Management Office (PMO) Design
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
E.g Act as a positive role model for innovation Question the status quo Keep the focus of contribution on delivering and improving.
Twelve Cs for Team Building
12 August 2004 Strategic Alignment By Maria Rojas.
Organizational Innovation
TOSS-BFK Administrators’ Evaluation Crosswalk to School-wide Changes
Business Process Reengineering Raymond Yap Principal Consultant Hutex Management Consulting
© 2010 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
When Change Runneth Over: Lessons Learned From Implementing Multiple Change Projects Simultaneously PDN Presentation July 2013.
Take Flight September EXECUTING STRATEGY : THE BASICS THE ROLE OF STRATEGY What is Strategy? Why is Strategy Important? How is Strategy Formulated?
1 Chapter 12 Strategic Entrepreneurship PART IV MONITORING AND CREATING ENTREPRENEURIAL OPPORTUNITIES.
Change Acceptance Process
CISB444 - Strategic Information Systems Planning
Chapter 14 Contemporary cost management. Cost management §Improvement of an organisation’s cost effectiveness through understanding and managing the real.
IT Strategic Planning Project – Hamilton Campus FY2005.
Elements of Planning and Decision-Making
Ohio Improvement Process (OIP) Facilitating District-wide Improvement in Instructional Practices and Student Performance.
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
BPR. Business processes are simply a set of activities that transform a set of inputs into a set of outputs. For example suppose you are waiting in line.
Developing the Marketing Plan
Learning and Development Developing leaders and managers
Business Process Reengineering
Enterprise Architecture
Charting a course PROCESS.
Innovation & Change. Innovation Why should companies innovate? Why should companies innovate?
QS 702 Phase II: Encouraging the Integration of Technology Into Higher Education.
THE REGIONAL MUNICIPALITY OF YORK Information Technology Strategy & 5 Year Plan.
Developing a result-oriented Operational Plan Training
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
The Challenge of IT-Business Alignment
Logistics and supply chain strategy planning
Competing For Advantage Part IV – Monitoring and Creating Entrepreneurial Opportunities Chapter 12 – Strategic Entrepreneurship.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
BUSINESS PROCESS REENGINEERING & ERP
Managing Organisational Change Getting started: preparing your journey to implement transformational change.
Applying Business Process Re-engineering
People and Organisational Change
A Review of SANParks Change Process Discussion Background for the Change with a Purpose Project Team.
Delos Approach to Strategic Change Management © The Delos Partnership 2004.
Cultures & Commitment Imran Hussain. TQM Core Customer/Supplier Chain Inputs Process Outputs.
Quality Management.
Getting There from Here: Creating an Evidence- Based Culture Within Special Education Ronnie Detrich Randy Keyworth Jack States.
Business Process Redesign Reinventing Continually?
Chapter 9 Management Innovation for Modern Businesses:
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Chapter 10 Innovation and Change. Purpose of the Chapter Discuss how organizations change How managers can direct the innovation and change process Discuss.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Implementing Strategy Chapter 7. Objectives Upon completion of this chapter, you should be able to:  Translate strategic thought to organisational action.
Inputs Processes Outputs Information Systems Planning Process
GROUP 2 HARDIK SEMLANI (08FT-79) HIMANSHU GOYAL (08FT-81) KANIKA NAGPAL (08FT-082) MANASI GUPTA (08FT-085) RUBIN JAMES (08FT -099) Business Process Reengineering.
Chapter 16 Managing costs and quality
Unpacking the Australian Professional Standard for Principals and the Leadership Profiles “If you don’t have a powerful point of view about what high quality.
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
11 Setting Direction Broad Scanning Intellectual Flexibility Seizing the Future Political Astuteness Drive for Results Self Belief Self Awareness Self.
Chapter 5 Creating Business Value © John Wiley & Sons Canada, Ltd.5-1.
P3 Business Analysis. 2 Section D: Business Process Change D1. The role of process and process change initiatives D2. Improving the process of the organisation.
Organization Theory and Design
1 Chapter 9 Implementing Six Sigma. Top 8 Reasons for Six Sigma Project Failure 8. The training was not practical. 7. The project was too small for DMAIC.
Information Technology Planning
BUSINESS PROCESS RE-ENGINEERING Presentation
Faisal Ba Sharahil S 09/24/2016 HRD 520 Leading Change.
HPI Leadership and Challenges
Chapter 11 Innovation and Change
ATTORNEYS AND SOLICITORS
Cultures & Commitment Imran Hussain.
Portfolio, Programme and Project
ERP and Related Technologies
Presentation transcript:

1

2 Business Process Reengineering (BPR) “the fundamental rethinking and redesign of processes to achieve dramatic improvements in critical, contemporary measures of performance such as cost, quality service and speed” Michael Hammer and James Champy Reengineering the Corporation

3 BPR involves rethinking and restructuring the way an organisation conducts its activities and leveraging the power of ICT to improve operational processes The reinvention, reengineering or transformation of E- Government implementation is holistic and requires a systematic approach The basic BPR methodology consists of taking the four elements of People, Process, Organisation and Technology simultaneously through the various stages of transformation, namely Planning, Review, Design and Implementation

4 Reengineering exercise fails not because of funding or technology, but because of people-related factors o Not establishing a great enough sense of urgency o Lack of vision o Under-communicating the vision o Failure to involve enough people in the effort o Not anchoring changes in the organisation’s culture

5 The BPR methodology adopted for E-Government consists of reengineering the four components of People, Process, Organisation and Technology through a guided transformation occurring in four distinct stages o Planning the reengineering effort o Reviewing the as-is processes o Designing the to-be processes o Implementing the to-be processes

6 Technology Process People Organisation Planning As-Is Review Improvement Opportunities To-Be Process Design Gap Analysis Impact Analysis Implementation Confirm Strategic Direction Analyse Current Processes Design To-Be Processes Implement To-Be Processes

7 The speed and complexity of each of the phases differ from project to project Due to the nature of the projects, the scope or emphasis for each component also differs o Some projects required radical organisational restructuring o Some focused on improving and streamlining processes

8 The Planning phase involves o Defining the scope of work o Mobilising resources o Defining the detailed approach o Identifying key stakeholders

9 Mapping the targeted processes against the computer systems, tools and technologies that currently support them Review is a critical step as it evaluates the current performance, its relevance to the overall strategy and its potential for change Two key lessons o The effort required to review and analyse the as-is processes is significant because of the complexity inherent in the as-is processes o It is important to ascertain the level of detail for the review because its output must contain information useful for designing the to-be process activity

10 The teams have to rigorously examine, revise, improve and even eliminate non-value-adding steps in the process and identify the required changes to the inputs and outputs of those activities impacted by BPR To produce a comprehensive to-be design, the BPR teams hold discussions and workshops with process owners to obtain initial feedback and validate the design o User involvement is crucial to promote early buy-in and ownership of the new processes

11 When the to-be design is completed, a Gap and Impact Analysis is conducted to o Identify any significant discrepancies that existed for any of the validated to-be processes that could not be reconciled o Recommend a walk-through for the identified discrepancies as appropriate o Identify any non-technology changes that are recommended by the BPR Team o Include steps that are reengineered but are subsequently rejected by the Government team

12 The need for the BPR team to collaborate and coordinate with other teams is more apparent in the Implementation Phase Contingency planning has to be put in place for any issues or problems arose during implementation With implementation completed, some immediate improvements can be felt

13 Know the organisation Communicate early Obtain commitment Active versus commitment Overestimating organisational flexibility Let a pilot point the way Maintaining strategic focus Employ structured innovation Technology

14 Committed and strong leadership is a key success factor in BPR projects Leadership from senior management has to be effective, strong, visible and creative in thinking and understanding in order to anchor a vision in the minds of the people for their involvement, support and motivation

15 Having executive champions for BPR change is necessary to overcome barriers such as organisational resistance, fear and doubts They secure top management support, resolve conflict and provide the leadership and guidance to the personnel involved in the change journey

16 Effective communication lowers the resistance to change at all levels, particularly to those not involved directly with the BPR effort It is essential to ensure that information is disseminated frequently both horizontally and vertically and be open, clear and honest especially when discussing sensitive issues such as o Task boundaries o New roles and responsibilities o Personnel reduction

17 The BPR team made a concerted effort to ensure that middle management, process owners, those involved in information technology and human resource felt involved and consulted in ten process redesign Fostering a sense of ownership and collaboration helps the organisation endure any inconvenience and shortcomings while reengineering is carried out

18 In preparation for their new roles, ICT personnel must be educated on ICT innovations and the potential for realising competitive advantage through reshaping the business processes of their organisations Communicating, educating and keeping in touch with all levels of the organisation help create an effective culture for organisational change o Allows people to understand, conform to and remain positive about the new values, management processes and communication styles that are created by the newly redesigned processes

19 ICT can only enhance an organisation’s position by supporting its business strategy Frequent meetings were held between the developers, network providers and the Government to discuss and strategise on the enhancement of existing ICT infrastructure o Roles and responsibilities of each party were determined o Capabilities of existing ICT infrastructure evaluated and if required, improved upon o Integration with legacy systems