Bridge Standards & Practices Bridge Design & Drafting Manual (BDDM) Bridge Drawings Upcoming Bridge Training.

Slides:



Advertisements
Similar presentations
BDDM Updates November 2011 ODOT Bridge Design Exchange Nov. 10, 2011.
Advertisements

Structural Design Program Review Massachusetts Department of Transportation September 20-23, 2011.
Bridge Design Manual Whats New?. Waters of the United States Placement of fill material below Ordinary High Water Mark (OHWM) requires 401/404 permit.
Software for Engineers EG1003: Introduction to Engineering and Design.
FP6/FP-7 IT System 1 FORCE: WEB BASED EDITOR OF FORMS C FOR FP-6 AND FP-7.
EG1003: Introduction to Engineering and Design Software for Engineers.
Journal Vouchers H’s and I’s and J’s OH MY!. Journal Vouchers H’s and I’s and J’s OH MY! H type JV’s are used to... Reallocate transactions within an.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
ETravel Authorization / Reimbursement Overview SOLAR Financials x 6685 July 8, 2014.
SE Document Document Control Software. SE Document SE Document is a Document Management Software System to help you meet all document control requirements.
Engineering Document Repository & Electronic Signature (E-Sign) Tutorial 1 DCG- Revision C 7/25/2014.
Geo-Environmental Standard Drawing Process Standard drawing owners Standard drawing requests Document Requirements Team coordination Document submittals.
EIRB Training IRB Committee Member A Paperless IRB System.
ProjectWise (PW) Digital Contract Plans, Specifications, & Supplemental Documents.
Proceedings and Report of the Expert Meeting: Arrangements Proceedings and Report of the Expert Meeting: Arrangements.
Home screen of your online tracker system Updates or notes for your attention are placed at the top in red. This will also inform you of the document turnaround.
Compliance Monitoring Audit Tutorial Version 1.0 April 2013.
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
Ohio DOT’s Online CE System Presented by Kevin E. Davis Environmental Supervisor Office of Environmental Services.
Second organisational meeting Committee of the Regions 8 th June 2005.
Remarks will print on the completed form Generate Quantity Book Entry Generate Pay Quantity.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
LRFD Now! Andy Zickler VDOT Structure and Bridge Division Central Office April 10, 2006
Delta State University College of Education Annual Student Update Part II Dissertation January16, 2010.
Revised 10/20/04Version 2.4Page 1 of 22 People First Manual Timesheet Training Guide Section 2 -- Training Scenarios.
June 2004 IAMSLIC Resource Sharing Committee, Requesting Copies and Interlibrary Loans in the IAMSLIC Z Catalogue.
Michael Cagle and Holly Langer-Evans | Nov U.S. Department of Education 2012 Fall Conference FSA Assessments: Find It, Fix It, and Enhance Compliance.
Extended School Year 2015 Teacher Professional Development June 29, :00pm – 3:30 pm.
Thesis Format and Submission
April 2008 BAS Forum Payments to Non-Resident Aliens Reference the March 20th to the BAS Communications group. Departments planning events for summer.
T R A F F I C C O N T R O L P L A N S D E S I G N TRAFFIC CONTROL PLANS W H A T & W H Y Traffic Safety & Construction Staging Plan Traffic Safety & Construction.
ODOT Traffic Standards Engineer
ODOT Sign Design. Who Every Sign Designer Should Know TEOS Standards Engineer Operations Engineer –Region Traffic Engineers
EG1003: Introduction to Engineering and Design Software for Engineers.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Presented by Cathy Lonaberger Office of the Administrator to the NACOP Training Workshop August 18-19, 2010.
Course Pack Production at HKIEd HKIEd Library 20 Jun 2013.
CTE Transitions CATEMA Teacher Tutorial Part Three: Class Grading Procedures.
2. Submit laboratory booking form Requestor (external/internal) Manager/ Lab Engineer/ Technical Assistant/ Technician 5. Requestor to Propose a new date.
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
Test Administrator Training EOC & Off-Grade Spring Created by Everett Public Schools 1.
Rotary Club Grants Module ClubRunner Rotary District 5520 Dominic J. Bernardi Jr. Grants Committee Chair Rotary Club Grants Module.
EIFL Licensing Training 2: EIFL LICENCE AGREEMENTS
SCC P2P – Collaboration Made Easy Contract Management training
DOCUMENT AND DATA CONTROL
eIRB Training IRB Committee Members
Contractor Evaluations
Laboratory 1: Software for Engineers
Club Administration PP Dave Taylor.
Geo-Environmental Standard Drawing Process
“Failure is Always an Option”
“Failure is Always an Option”
To the ETS – PNG Continuation: Online Training Course
Ariba Contracts: Initiate eSignature
AARP Foundation Tax-aide
Extended School Year 2017 Teacher Professional Development
Nutrition Education Program
PROJECT CHANGES IN EMS Implementation Seminar.
“Failure is Always an Option”
Software for Engineers
Software for Engineers
Flowchart Improvement Process
FACULTIES LAB BOOKING AND KEY MANAGEMENT
Software for Engineers
Department of Environmental Quality
To the ETS – PNG Continuation: Online Training Course
Course Preparation Check List
Final Design Authorization
“Failure is Always an Option”
Calendar Overview – Phase I – REVISED April 2019
Presentation transcript:

Bridge Standards & Practices Bridge Design & Drafting Manual (BDDM) Bridge Drawings Upcoming Bridge Training

Overview: Links to ODOT Bridge Information BDDM – Recent Key Updates Proposing Changes to the Manual Deviations from BDDM Bridge Drawings – Start to Finish Bridge Section Training Updates

ODOT Bridge On-Line Links Bridge Engineering Home Page Bridge Design & Drafting Manual (BDDM) Bridge Standard Drawings Use “Br. Standards & Manuals” Link Standard Drawings also via Roadway Engineering Home Page

Bridge Engineering Home Page

Br. Standards & Manuals Page

ODOT Bridge Example Drawings ftp://ftp.odot.state.or.us/Bridge/BDDM In the Example_Drawings folder Also: Cell_Library Bridge_Example_Designs BDDM_Figures

BDDM Nov Selected Updates Scour Analysis (2) Pedestrian Structures – Live Load LRFD Ductility, Redundancy and Operational Importance Factors Sidewalk Loading – New section End Bents – Concrete facing on MSE walls (1) Stay-in-Place Forms 1.2 Steel – Various updates Deck Pouring Sequence

To Propose Changes to BDDM: Go to Introduction, “Revising The Manual”, page INTRO-5 Follow Step-by-Step procedure Not needed for bringing routine errors to our attention (typographical, etc.)

BDDM “Deviation” Process When you want to do something differently than BDDM policy specifies Send request to Bridge Standards & Practices Committee stating “what” and “why” Committee will review and respond

“Deviation” vs. “Exception” Roadway Engineering Design “Exception” process is a more formal request to use geometry, etc. that doesn’t meet operational standards

Bridge Standards & Practices Committee Bruce Johnson, State Bridge Engineer Kevin Davidson, Br. Standards & Practices Engr. Gary Bowling, Br. Operations Managing Engineer Craig Shike, Concrete Hormoz Seradj, Steel Holly Winston, Seismic & Bridge Rails Jan Six, Foundations

Create CAD Files & Drawings Three Types of CAD Files Layout File Sub-structure File Super-structure File Layout FileSub-structure FileSuper-structure File

Drawings are Reviewed Engineer of record reviews drawings Final Corrections have been made to CAD Files.

Mylars are Created “D” size mylars are printed All parties have signed mylars. 11” x 17” paper prints are made of signed mylars.

Plans are sent in “D” size mylars and 11” x 17” paper copies of signed mylars are sent to office of Pre-Letting in Salem Headquarters. Office of pre-Letting sends mylars to ODOT Reprographics for printing and scanning.

Contract Documents Created ODOT Reprographics sends requested material back to Office of Pre-Letting and sends Bridge mylars and scans to Bridge Engineering Section Headquarters, front office. Bridge front office returns signed mylars to original design office. Loads scans into the Bridge Data System (BDS).

Project is Constructed

As-Constructed Drawings Project Manager submits as-constructed comments to design office. Engineer of record reviews comments Drafter places as-constructed comments on mylar by hand.

Distribution of As-Constructed Drawings A set of drawings with as-constructed comments are created and distributed to: Bridge Operations Engineer Region Bridge Inspector Original red line as-constructed drawings are sent back to Project Managers office.

At Completion of Project At completion of a project, what information is needed by Bridge Engineering Section Headquarters in Salem. Electronic CAD files in Microstation Version 8 format. “D” size signed mylars Calculation books Project Files Load Rating of as-constructed bridge per Load Rating Guidelines Cost Data

Bridge Mylar Flowchart

Upcoming ODOT Bridge Section Training Beginning Seismic Design: March, April, June & July, One day a month for 8 hours each month, total of 32 hrs. High Performance Steel and Accelerated Bridge Construction: March 15 & 16 What’s New in Bridge Design: May 17 & 18th LRFD Foundation design: Tentative April or May 2006

Questions?