August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.

Slides:



Advertisements
Similar presentations
ILC Damping Ring R&D Using CESR Mark Palmer Cornell Laboratory for Accelerator-Based Science and Education.
Advertisements

ILCDR/CesrTA meeting Low Emittance Tuning 報告 K.Kubo.
Global design effort 2008 DOE/NSF review June 30, 2008 Global design effort Americas Slide 1 CesrTA Status and Planning for FY08-09 David Rubin Mark Palmer.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
ElectronsdFud Simulation Work at Cornell Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA Electron Cloud R&D Overview Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
ICFA Beam Dynamics Panel Update and ABDW #49  ECLOUD`10 Mark Palmer Cornell University Laboratory for Elementary-Particle Physics.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
C esr TA Future Plans David Rubin September 11, 2012.
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Emittance Measurement Needs for CesrTF M. Palmer Cornell University Laboratory for Elementary-Particle Physics.
Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 1 * Mitigation techniques planning still underway with ILC DR group Answer to Questions 1 and.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
02/04/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
GDE, 26 Oct 2007, FNAL Global Design Effort 1 Damping Rings Area System Summary Andy Wolski.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
Highlights from the ILCDR08 Workshop (Cornell, 8-11 July 2008) report by S. Calatroni and G. Rumolo, in CLIC Meeting Goals of the workshop:
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
01/08/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Summary David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
ILC Damping Ring Test Facilities Status Report Mark Palmer Cornell University May 9, 2009 ILC PAC Review, Vancouver.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
CesrTA Status and Plans Joe Calvey 10/15/08. CesrTA Status and Plans- CLIC08 Introduction CesrTA is a program to reconfigure the CESR storage ring at.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
Low-Emittance Tuning at CesrTA Jim Shanks Cornell Laboratory for Accelerator-Based Sciences and Education.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
CESR-c Plans for CESR (or Life Without CLEO) Mark A. Palmer David L. Rubin Second ILC Accelerator Workshop August 18, 2005.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
CESR-c and ILC Damping Ring Instrumentation
Mark Palmer for the CESRTA Collaboration
Electron Cloud and Ion Experimental Program
Electron Cloud R&D at Cornell ILCDR08--7/8/08
CesrTA Status Report Mark Palmer July 8, 2009.
Oversea collaborators
CesrTA Status and Planning
Recent Electron Cloud Studies at CESR and Future Plans
E-cloud instability at CESR TA
M. Tigner, R. Helms, M. Palmer, D. Rubin, D. Sagan Cornell University
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
CesrTA Experimental Schedule and Priorities
Electron cloud studies at CESR
CLIC damping rings working plan towards the CDR
CTA 09 - Introduction David Rubin Cornell Laboratory for
Session Introduction & Damping Rings Baseline Lattice Decision
DR Session Introduction
Proposal for a CESR Damping Ring Test Facility
Presentation transcript:

August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan

August 9, 2007M. Palmer2 Overview Projects –Will present the list –Soliciting comments from primary investigators about details and time estimates Optimization Issues –CLEO-c production running –ILC Meetings (and status reports) –Collaborator Involvement Outline of Proposed Schedule and Time Requirements Discussions

August 9, 2007M. Palmer3 Projects Electron Cloud Studies –Detailed studies with RFAs –Bunch spacing/charge studies (multipacting resonant behavior) –Develop additional measurement techniques (eg, KEK techniques) –Witness bunch studies at 5.3 GeV –Collaborator Visit Ion Studies –Synthesized mode spectra measurements –Controlled pressure bumps with different species –Other measurement techniques Low Emittance Lattice –Initial loading and correction –Beam-based alignment –Instrumentation Tests Vertical beamsize interferometer X-ray beamsize monitor Machine Correction –Algorithms for low emittance correction –Fast dispersion measurements 4 ns Feedback Studies –Ongoing checkout –Characterize longitudinal instability Threshold Mode –Initial beam dynamics experiments –Support hardware upgrades Instrumentation Upgrades –BPMs 4 ns operation –Front end BW –4 ns digitization Lower noise BPM front ends –Streak Camera 125 MHz Synchroscan Unit for 4 ns operation New timing module –Vertical beamsize interferometer For low emittance measurements –XBSM Studies CHESS run Potential for use during final CLEO-c run Other???

August 9, 2007M. Palmer4 Other Milestones and Dates Schedule another Collaborator Visit for EC Studies –During CHESS to CESR transition during first full week of December? –Aim for 3 shifts of tests? –Would be timely in advance of the Damping Rings R&D Meeting at KEK One of the primary discussions scheduled will be EC R&D ILC GDE Meetings (status reports) –Oct GDE meeting at FNAL –Nov. 5-7 Damping Rings EDR Meeting at Daresbury –Dec Damping Rings R&D Meeting and ATF Technical Board Meeting at KEK

August 9, 2007M. Palmer5 Machine Studies Schedule Machine Studies Shifts –CLEO-c Remaining in present run: ~12 Scheduled in final run: ~45 –CHESS Scheduled: ~25 –CesrTA Request: 3.5 during present CLEO-c run 4 during CHESS run 7.5 during final CLEO-c run Week 1: 8/13/2007 XBSM Testing Proposed ECloud Collaborator Visit

August 9, 2007M. Palmer6 Possible Alternate Machine Studies Schedule Machine Studies Shifts –CLEO-c Remaining in present run: ~12 (unchanged) Scheduled in final run: ~24 (vs 45 previously) –Allow intensive tuning and “emergency” machine studies during remainder of final run –Is there an energy change mid-way through final run??? –CHESS Scheduled: ~25 –CesrTA Request: 3.5 during present CLEO-c run 4 during CHESS run 7.5 during final CLEO-c run Week 1: 8/13/2007 Schedule MS if needed for energy change

August 9, 2007M. Palmer7 CesrTA Machine Studies Plan (Draft) WeekShiftsCTATasksComments 8/1340.5EC RFA and beam measurements 8/2721EC Measurements & Fast Dispersion Measurement Tests 9/1021Low Emittance Lattice (loading/corr) 9/24214ns Fdbk: Checkout, Streak Camera, Long. Instability, EC Measurements New timing unit hopefully available 10/8111Ion Studies with controlled bump (H 2 &N 2 )Valve location available 10/1521EC RFA and beam measurements (high energy characterization) GDE Mtg (10/22-26) 10/2921Instr & Methods Checkout/DevelopmentDR Review (11/5-7) 11/1221Instr & Methods Checkout/Development 11/192?XBSM Tests Starting at CHESS 12/3123EC RFA and beam measurementsProposed Collaborator Visit 12/104 (3)1Contingency 12/175 (3)0.5ContingencyDR Workshop (12/18-20) 1/74 (2)1Low Emittance Lattice 1/214 (2)1Low Emittance Lattice 2/44 (2)1Instr & Methods at Low Emittance