Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper 1100 1 PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.

Slides:



Advertisements
Similar presentations
Load Management System with Intermittent Power on the Grid Ruth Kemsley CEng MIMechE MIEE Econnect Ventures Ltd.
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Electricity distribution and embedded renewable energy generators Martin Scheepers ECN Policy Studies Florence School of Regulation, Workshop,
Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
Sistan & Balouchestan Electric Power Distribution Company
Understanding Electrical TransmissionDemonstration A1 A Guide to the National Grid Transmission Model Demonstration A1 How is electricity generated and.
Grid Issues Charles Davies Commercial Director, National Grid Company British Wind Energy Association April 2002.
Overview of the South African Renewable Energy Independent Power Producer Programme (IPP Program) Bruce Linke Finance and Projects 30 April 2012.
1 Offshore wind costs David Milborrow
Frankfurt (Germany), 6-9 June 2011 Douglas Wilson Psymetrix Ltd, UK Douglas Wilson Psymetrix Ltd, UK D. Wilson – UK – Session 4 – Paper ID 0497 Connection.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
A review of offshore wind power grid connection options in the Bothnian Bay Offshore grids for wind power integration Sisu Niskanen VTT Technical Research.
Optimal Distributed Generation Placement Considering Voltage Profile Improvement and Loss Reduction: Case Study on Iranian Distribution Network STSD 2014.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
THE FUTURE OF SOLAR ENERGY IN LITHUANIA OPTIONS AND OPPORTUNITIES FOR DEVELOPMENT Vitas Mačiulis Lithuanian Solar Energy Association 19 September, 2013.
The Role of Energy Storage in Renewable Power Integration Emily Fertig Sharon Wagner Carnegie Mellon University.
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
Aspects of Relevance in Offshore Wind Farm Reliability Assessment Nicola Barberis Negra 2 nd PhD Seminar on Wind Energy in Europe Risø.
EWEC 02/2006 Dr.-Ing. Kurt Rohrig Institut für Solare Energieversorgungstechnik Verein an der Universität Kassel e. V. Introduction.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Europe goes Offshore with Wind Farms Hermann J. Koch Senior Member IEEE Substations Committee Vice Chairman Siemens Energy Sector Transmission Erlangen,
ON DIMENSIONING LVDC NETWORK CAPACITANCIES AND IMPACT ON POWER LOSSES
Frankfurt (Germany), 6-9 June 2011 Agenda 1. Background 2. System Design 3. Experience 4. Future work Henrik Stomberg– Sweden – Session No 4 – Paper No.
Demand Response – A New Option for Wind Integration ?
 UK Power Networks. All rights reserved Demonstrating the benefits of energy storage on an 11 kV Distribution Network Matthieu Michel – Technology.
Frankfurt (Germany), 6-9 June 2011 Power System Impacts from Large Scale Deployment of EV -The MERGE project – João A. Peças Lopes
Frankfurt (Germany), 6-9 June 2011 M.Sc. Terje Pynten, Dr. Jan Andor Foosnæs, M.Sc. Johan G Hernes, M.Sc. Erling Tønne NTE Nett AS Paper 0696 Finding maintenance.
Organization of the electricity market and renewable energy sources in the Republic of Croatia" Dubrovnik, 2 nd October th Dubrovnik Conference.
Frankfurt (Germany), 6-9 June 2011 Greet Vanalme – NL – RIF Session 6 – Paper 0786 The introduction of local system services – the case of storage in the.
Frankfurt (Germany), 6-9 June 2011 Presenter: Mahdi Kiaee Supervisors: Dr. Andrew Cruden and Professor David Infield The University of Strathclyde, Glasgow.
Frankfurt (Germany), 6-9 June 2011 GONZALEZ–CH–RIFS4–0182 OPERATIONAL STABILITY OF SHUNT CIRCUIT-BREAKER SYSTEMS IN UNGROUNDED MV NETWORKS WITH DISTRIBUTED.
W. Schufft: Challenges for electrical power engineering IP 2007, Pernink Challenges for Electrical Power Engineering.
German Offshore Wind Strategy1 German Policies on Offshore Wind Energy Cornelia Viertl / Jens Bömer Division KI I 3 / Hydropower and Wind Energy.
Frankfurt (Germany), 6-9 June 2011 MARTENSEN – DE – Session 4 – 1221 The Cell Controller Pilot Project (CCPP): From Surviving System Black-Out to Market.
Frankfurt (Germany), 6-9 June 2011 Simone Botton, Fabio Cazzato, Marco Di Clerico, Domenico Di Martino, Federico Marmeggi – Enel Distribuzione SpA Simone.
Frankfurt (Germany), 6-9 June 2011 MOCCI – IT – RIF Session 5 – Paper 999 Multi-Objective analysis of Regulatory frameworks for Active Distribution Networks.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
Integration of the German Offshore Wind Power Potential into the Electricity Supply System B. Lange, Ü. Cali, R. Jursa, F. Schlögl, M. Wolff, K. Rohrig.
Chapter 3 Wind Power of the world. 3.1 Development and utilization of wind energy in China  Wind power generation  Wind farm construction.
Frankfurt (Germany), 6-9 June Lars Garpetun – Sweden – Session 6 – 0415 EXPERIENCES FROM OPERATIONS AFTER A FULL- SCALE SMART METERING ROLLOUT REGARDING.
Frankfurt (Germany), 6-9 June 2011 Fabio Cazzato, Simone Botton, Marco Di Clerico – Enel Distribuzione SpA Simone Botton – Italy – Session 4 – Paper ID.
Frankfurt (Germany), 6-9 June 2011 Steven Inglis – United Kingdom – RIF Session 5 – Paper 0434 Multi-Objective Network Planning tool for the optimal integration.
Brussels Workshop Use case 3 11/09/2015 Mario Sisinni.
Präsentationsbeginn. Wind Energy – Lessons from the European Experience Kiev, November 3, 2009 Kevin Mason.
Daudi Mushamalirwa Luanda June, 2014 Technical issues of the stability of small size electric systems composed of wind generators and conventional generating.
Frankfurt (Germany), 6-9 June 2011 M. Khederzadeh Power & Water University of Technology (PWUT) Tehran, IRAN. M.Khederzadeh – IRAN – RIF S3 – Paper 0066.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
IBERDROLA RENEWABLE ENERGIES Large-scale integration - toward 12% penetration in Europe - A reality? Athens, February 26, 2006 Pedro Barriuso Otaola General.
Frankfurt (Germany), 6-9 June 2011 AN OPTIMISATION MODEL TO INTEGRATE ACTIVE NETWORK MANAGEMENT INTO THE DISTRIBUTION NETWORK INVESTMENT PLANNING TASK.
Frankfurt (Germany), 6-9 June 2011 Gordon McKinstry – United Kingdom – RIF Session 5 – Paper 1092 Comparison of the cost of electricity in a highly distributed.
Optimization of active distribution networks: design and analysis of significative case studies for enabling control actions of real infrastructures D.Moneta*,
MIGRATING TOWARDS A SMART DISTRIBUTION GRID Authors: Prashanth DUVOOR Ulrike SACHS Satish NATTI Siemens PTI.
Steady State Analysis Of A Microgrid Connected To A Power System
Frankfurt (Germany), 6-9 June Astrid Petterteig, SINTEF Energy Research, Norway – Paper 0840 Presented by Dag Eirik Nordgård, SINTEF Energy Research.
Frankfurt (Germany), 6-9 June 2011 Marcus R. Carvalho – Brazil – RIF Session 5 – Paper ID 0728 LONG TERM PLANNING BASED ON THE PREDICTION AND ANALYSIS.
Frankfurt (Germany), 6-9 June 2011 Jukka Lassila – Finland – Session 6 – Paper 0773 Network Effects of Electric Vehicles Case from Nordic Country LUT Jukka.
Frankfurt (Germany), 6-9 June 2011 Minimum short circuit power in the LV distribution network to meet EN standard requirements David MEZERA
Storage Optimization in Distribution Systems Roger Cremers & Gabriël Bloemhof KEMA (The Netherlands) CREMERS – NL – RIF Session 4 – Paper 0180.
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
SUSTAINABLE INVESTMENT STRATEGIES FOR AGING DISTRIBUTION NETWORKS Dr. Eric Jennes 24/7 Netze Mannheim Germany Frankfurt (Germany), 6-9 June 2011 Dr. Eric.
GRID INTEGRATION COST OF PHOTOVOLTAIC POWER GENERATION G. Strbac, D. Pudjianto, P. Djapic, J. Dragovic Energy Futures Lab.
Dena Grid Study II Integration of Renewable Energy Sources in the German Power Supply System from with an Outlook to 2025 Jaakko Iivanainen.
KEY MESSAGES FROM WEC CESI REPORT JUST LAUNCHED
The Austrian promotion scheme for green electricity Günter Pauritsch Workshop on renewable energy sources Sofia, 21 December 2011 Austrian Energy Agency.
Additional clarifications on economic and adequacy running hours
MIGRATING TOWARDS A SMART DISTRIBUTION GRID
Optimization of the Energy-Supply-Structure of modern Aircraft by using conventional power system technologies Dipl.-Ing. Ilir Purellku Electrical Power.
Sami Repo Tampere University of Technology FINLAND
Exercise Session 3 Power systems.
Ilkka Jokinen Taavi Heikkinen
Presentation transcript:

Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES TO MV DISTRIBUTION NETWORKS Walter Niederhuemer Karl Derler Linz Strom Netz GmbH

Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper Introduction  Feed in by onshore wind turbines into MV-grids is a particular challenge for the DSO Requests for connections primarily for several wind turbines or small wind farms Power range of a few MW Connections distributed across the same part of the MV- distribution network  To enable the feed in and guarantee the power quality Reduction of the installed feed in power is necessary Extending the distribution network

Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper Introduction  Producer and DSO with different optimum Producer  Deliver full feed in power at any time  Increase the energy output and thus to optimize the return  Low direct grid connection costs DSO  Keep the network cost as low as possible  To support the objectives of the EU and to enable more feeding in, it is necessary To find an overall economic optimum To find a compromise between network investments and produces energy quantity

Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper Method of calculation  Probabilistic calculation  Taking into account the statistical behavior of Output voltage in the substation Current in the branch Feed in power of the wind turbine

Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper Result of the conventional assessment  Reduction of installed feed in power to 2,2 MW is necessary  Alternatively, 0,5Mio€ investment to the grid for a 3km long MV cable  Selected network 1,2MW wind turbine + 250kW biogas plant connected New 2MW wind turbine is planned Connection via 17,5km overhead line 95mm² Aldrey  Conventional assessment Peak load with and without feeding Off-peak load with and without feeding

Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper Result of the probabilistic calculation  Installed wind turbine power 3,2MW  Voltage exceeds the voltage limit only for a few hours.  Theoretically generated annual amount of energy about MWh  With active power control 0,03% not feed in energy Reduction of active power up to max. 1370kW  Annual revenue loss is less than 100€ (with feed-in tariff of 9,6ct/kWh)

Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper Result of the probabilistic calculation  Theoretically generated annual amount of energy about MWh  With active power control 5% not feed in energy Real feed in energy MWh Reduction of active power up to max. 3,8MW (50% of installed feed in power)  2 times higher energy yield without additional grid investments  If a not feed in energy amount of 5% is acceptable for producers 7,5MW wind turbine power could be installed at the PCC Yearly earning of energy of on-shore wind turbines and loss because of control or switch off if voltage level is too high

Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper Conclusion  Probabilistic planning allows a better simulation of real network conditions  More than 2 times higher generation capacity by minimal network costs  Acceptance by producers of a certain amount of not feed in energy is necessary  Need of construction cost contribution for future grid investments  Need of suitable legal frameworks