PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
ISIM Integration & Test Mike Drury JWST-PRES
PACS IIDR 01/02 Mar 2001 Baffle and Straylight1 D. Kampf KAYSER-THREDE.
PACS IQR13 Jan 2005 Optical Plans PFM 1 Optical Qualification and Plans for PFM N. Geis MPE.
Solar Orbiter EUS: Thermal Design Considerations Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Considerations.
Solar Orbiter EUV Spectrometer
PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board1 D. Kampf KAYSER-THREDE.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
PACS IBDR 27/28 Feb 2002 PACS FPU FPU R. Graue, D. Kampf Kayser-Threde.
PACS IIDR 01/02 Mar 2001 FPU Struts, Filter Wheel, Calibration Source1 D.Kampf, Dr. Roland Graue Kayser-Threde GmbH.
DM - COA Housing. DM - COA Housing with mirrors and alignment devices installed Alignment cubes Alignment devices Dummy chopper.
PACS IHDR 12/13 Nov 2003 PACS FPU Mirrors and Black Paint R. Graue, D. Kampf Kayser-Threde.
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
PACS IBDR 27/28 February 2002 PACS Grating Assembly1 Grating Assembly E. Renotte Centre Spatial de Liège (B)
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IHDR 12/13 Nov 2003 Filters1 N. Geis MPE. PACS IHDR 12/13 Nov 2003 Filters2 PACS Filter Scheme Filter scheme with 5 or 6 filters in series in each.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
PACS 12/13 November 2003 PACS PA/QA IHDR1 PACS PA / QA STATUS Documentation overview Cooperation with PA/QA responsibles -outlook- NCR Status System documents.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
Solar Orbiter EUS: Thermal Design Progress Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Progress Bryan.
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
PACS IIDR 01/02 Mar 2001 Optical System Design1 N. Geis MPE.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
O. Kester, NuSTAR annual meeting, 27/02/2013
PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Budgets and Interfaces.
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR.
PACS IBDR 27/28 Feb 2002 PACS Thermal Analysis1 Dr. L. Morgenroth CASE GmbH.
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
Status of the SWAP instrument
Rose Navarro HMI Lead Thermal Engineer
Double Star: Experiment Activities
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
SPICA / FPI Mechanical /Optical Issues
Presentation transcript:

PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde

PACS IHDR 12/13 Nov 2003 PACS FPU Primary Structure Chopper Cover Photometer housing Bolometer housing Red Spectrometer Connector Panel Collimator housing Top Optics housing Spectrometer housing FPU foot 1 axis FPU foot 2 axis Blue Spectrometer Connector Panel 2 K Feed Thru Alignment Cube Entrance to FPU Field Mirror for Spectrometer 4 K Thermal Strap

PACS IHDR 12/13 Nov 2003 PACS FPU FPU STM

PACS IHDR 12/13 Nov 2003 PACS FPU Bolometer Integration

PACS IHDR 12/13 Nov 2003 PACS FPU Straylight Analyses – Top Optic Model ASAP Model of Top Optics Derived from optical ZEMAX Model Black Coated Walls (>0.4 mm)

PACS IHDR 12/13 Nov 2003 PACS FPU Straylight Analyses – Results and Status High straylight suppression Neglible straylight impacts in consequent boxes Inputs considered for Baffle Design Straylight suppression 1e-10 to focal plane Modell delivered to ASTRIUM

PACS IHDR 12/13 Nov 2003 PACS FPU 2K - Feed Through Outside sleeve Cold finger D/E: Retainer ring 1/2 F: Muff G: Ring Cryo STM Vibration Tested Manufactured and Delivered

PACS IHDR 12/13 Nov 2003 PACS FPU FPU Suspension Design Status and Material Status: Design: completed Documentation: Completed Material Fibre: T300 Resin:Ciba Geigy Araldit LY-3505 Hardener XP 3403

PACS IHDR 12/13 Nov 2003 PACS FPU FPU Suspension Cryo Qualification Test Matrix Status Static load tests: completed (Cold) material characterisation: completed Cryovibration tests: complete (CRYO STM FPU )

PACS IHDR 12/13 Nov 2003 PACS FPU MGSE and CVSE Status MGSE design, procurement and functional test completed –Vibration test adapter –Lifting device –Integration Tools –FW Test Box CVSE design, procurement (cryostat) and functional test completed KT Cryostat Test Faciliy for Stability Tests

PACS IHDR 12/13 Nov 2003 PACS FPU Mass Budget *IR Black Paint, Internal Harness, Screws Contingency not needed

PACS IHDR 12/13 Nov 2003 PACS FPU Performed FPFPU Analyses Program

PACS IHDR 12/13 Nov 2003 PACS FPU PACS Thermal Model PACS-Thermal Model (Input-Status: May 2003) - PACS thermal model used as submodel of the H-EPLM reduced thermal model - PACS submodel consists of 154 thermal nodes PACS-TMM includes: - All mechanisms, all harness, radiative environment - Possibility of transient analysis (cool-down and operational time-line)

PACS IHDR 12/13 Nov 2003 PACS FPU Thermal Analyses - Status - Completed Tasks Thermal Analyses –Quasisteady state and transient thermal analyses –Calibration of thermal model (cooling down curves) after Cryo STM tests –Analyses of thermal links (2 K) wrt conductivity Documentation released

PACS IHDR 12/13 Nov 2003 PACS FPU PACS Cool-Down Behaviour

PACS IHDR 12/13 Nov 2003 PACS FPU PACS Thermal Analyses - Open Tasks - Update of the cryostat-TMM (Sept. 2003) not yet included - Dissipation values of the grating and the calibration sources are no measured values -Impact of Electrical insulation between spectrometers and cooling-straps not yet defined - Results of the discussion of the cooling-strap-IFs not yet included - Contact resistances at the cooling-strap-I/Fs only assumed, but not measured

PACS IHDR 12/13 Nov 2003 PACS FPU Structural Analyses - Status - Completed Tasks (see H/O wrt. STM warm/cold vibration) Structural Analyses –Evaluation of ambient and cold vibration tests –FEM calibration –Load analyses with calibrated model (cryo-vibration test) –Strength analyses for FPU metallic and CFRP components –Cryogenic material properties analyses –CoG, MoI analyses –Displacement, distortion, deformation analyses Documentation released

PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure Status – External Interfaces  Design envelope frozen  Optical beam stay out frozen  OB envelope frozen  DCNs of Assembly and IF Drawing version 27 to be approved

PACS IHDR 12/13 Nov 2003 PACS FPU Documents Status –ICDs Chopper, FW, Calibration Source, Filters/ Dichroics, Ga:Ga Detector, Grating: approved Bolometer, Distribution Boards:approved Cryogenic harness and connectors: approved –Procurement specifications (structures, mirror, coating, screws/helicoils, Si -lens, emitter for CS, etc.) approved –AIV and functional/environmental test plan:updated –Filled in verification matrix:latest status ( )

PACS IHDR 12/13 Nov 2003 PACS FPU Configuration Control Documents Document DescriptionDoc.-No.Configuration Control FPU Interface and Assembly DrawingVersion 27Yes FPU Design SpecificationPACS-KT-SP-002Yes Ge detector ICDPACS-KT-ID-002Yes Bolometer ICDPACS-KT-ID-005Yes CS ICDPACS-KT-ID-007Yes FW ICDPACS-KT-ID-006Yes Distribution Board ICDPACS-KT-ID-004Yes

PACS IHDR 12/13 Nov 2003 PACS FPU Approved Engineering Documents Document Description FPU Alignment Plan FPU Thermal Analyses FPU Structural Analysis FPU Load Analysis FPU AIV Plan FPU Environmental and Functional Test Verification Plan FW Environmental and Functional Test Verification Plan

PACS IHDR 12/13 Nov 2003 PACS FPU PA Activities (KT) Approved Documents –PMP (Update) –CIDL (Update) –CIL (Issue1) –PA Plan (Update) –MIP/KIP plan (Update) –Inputs to FMECA (Update) Approved procurement/manufacturing documentation/drawings Configuration Control

PACS IHDR 12/13 Nov 2003 PACS FPU MIP / KIP List Inspection FW assembly (CQM/PFM) after functional and environmental testing Calibration source (CQM/PFM) after environmental and functional testing Coated mirrors (CQM/PFM) FPU after vibration tests (CQM/PFM) Distribution boards and harness after manufacturing and functional testing (CQM/PFM) Fit check inspection after manufacturing and coating of aluminium structure (STM/CQM/PFM) Functional performance verification after FPU alignment (CQM/PFM)

PACS IHDR 12/13 Nov 2003 PACS FPU MAIV Status of Structural Items -Completed Tasks CQM –Mechanical items design and manufacturing drawings completed and released –STM/ CQM metallic items manufactured and IR black coated –Mechanical Fit check/Preintegration of all mechanical items (on boxes and FPU level) –STM/ CQM CFRP items manufactured and static load tested –Cooling straps manufactured PFM –Structural items design and manufacturing drawings completed and released –CFRP items manufactured and static load tested

PACS IHDR 12/13 Nov 2003 PACS FPU MAIV Status of Structural Items - OpenTasks CQM –Thermal Contact Soldering and Ge:Ga detector attachment (sapphire embedding) of CQM cooling straps in progress (until end of Nov. 2003) –Development of Ge:Ga Detector electrical isolation (thick layer coating) under progress (until end of Nov. 2003) PFM –Substructures and metallic components manufacturing in progress until April 2004 –Preassembly/fit check until June 2004 –Finish and black Coating until July 2004

PACS IHDR 12/13 Nov 2003 PACS FPU FPFPU Cryo Vibration Qualification Breakdown  See dedicated chapters

PACS IHDR 12/13 Nov 2003 PACS FPU PACS FPU Verification Similarity CQM and STM were manufactured parallel with the same drawings out of the same lot Qualification Tests STM vibration tests Tests completed Conclusion: FPFPU Housing is structurally qualified

PACS IHDR 12/13 Nov 2003 PACS FPU CQM SCHEDULE Manufacturing –CQM primary/secondary structures thermal treatment /manufacturing /IR coating sequentially completed –CQMoptical components delivered –CQM CFRP struts and 2 K feed through material test program and manufacturing completed AIV (Final assembly and alignment) –CQM from 7/03 to 1/04 (tbc)

PACS IHDR 12/13 Nov 2003 PACS FPU PFM SCHEDULE Manufacturing –PFM primary/secondary structures thermal treatment /manufacturing /IR coating to be completed until –PFM optical components delivered –PFM CFRP struts and 2 K feed through material test program and manufacturing completed AIV (Final assembly and alignment) –PFM from 7/04 to 11/04