Atkins New PSR Reporting Solution Using Actuate e.Spreadsheet October 2007.

Slides:



Advertisements
Similar presentations
Our Corporate Mission Quality Systems Management, Inc. (QSMI)
Advertisements

Strategic Management & Planning
Distributed Data Processing
Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
Merit Consulting Terje Myrseth MUA – October 2008.
Enterprise Resource Planning
Commercial in confidence Scottish CIPFA Conference – Annual Reporting Solution
Libraries in FE Colleges Capita Library Management System Demonstration May 2013.
Basic guidelines for the creation of a DW Create corporate sponsors and plan thoroughly Determine a scalable architectural framework for the DW Identify.
Lecture 5 Themes in this session Building and managing the data warehouse Data extraction and transformation Technical issues.
© 2004 Visible Systems Corporation. All rights reserved. 1 (800) 6VISIBLE Holistic View of the Enterprise Business Development Operations.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
Quality evaluation and improvement for Internal Audit
FINSAPP SAP Delivery MATRIX - Get the mix right After delivering 100’s of successful projects over the years the Management Team at FINSAPP has developed.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Deriving Performance Metrics From Project Plans to Provide KPIs for Management Information Primavera SIG October 2013.
Saks Gloweli Consulting Management Consulting and Market Entry in China.
Microsoft Premier Support for Partners Capitalize on cloud potential Receive and deliver end-to-end cloud support Ease customers’ transition to the cloud.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
UMT and Microsoft Presenting Tips and Tricks Basics What’s new in Microsoft Project 2010 Brian Feder, MBA, PMP Senior Vice President UMT Consulting Group.
By N.Gopinath AP/CSE. Why a Data Warehouse Application – Business Perspectives  There are several reasons why organizations consider Data Warehousing.
Corporate Profile Contact Arvind Verma
February 2008 Professional Services. Agenda Professional Services Overview Data Services Overview Production Services Overview Summary.
Bp MiDAS - Performance Management for a Global Organisation MiDAS - Performance Management for a Global Organisation bp Exploration & Production Segment.
Connecting Classrooms Online. What is Connecting Classrooms Online?  Connecting Classrooms Online (CCO) provides a single, over-arching framework for.
Model Bank Testing Accelerators “Ready-to-use” test scenarios to reduce effort, time and money.
1 Copyright © 2004, Oracle. All rights reserved. Introduction to Oracle Forms Developer and Oracle Forms Services.
OFC 200 Microsoft Solution Accelerator for Intranets Scott Fynn Microsoft Consulting Services National Practices.
Putting a Face on Electronic Commerce Kathy Warden.
Performance Management in Practice
The Challenge of IT-Business Alignment
What is Oracle Hyperion Planning  Centralized, web- based Budgeting and Planning application  Combines Operational and Financial measures to improve.
Getting synergies from rapid access to data
PATCH MANAGEMENT: Issues and Practical Solutions Presented by: ISSA Vancouver Chapter March 4, 2004.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
Institute of Food Technologists (IFT) myIFT.org Overview Paul D. Grassman Director, Information Services September 2003.
A Strategy… Nancy N. Soreide NOAA/PMEL NOAA WebShop 2004 July 27-29, 2004, Philadelphia, PA For improving the security of Web and Internet applications.
How eNet4S can benefit your project? eNet4S Software Solution Business Team Chief Technology Officer July 11, 2006.
Why clients might want to invest in OBASHI. Two simple reasons why every business needs OBASHI.
Capture the Movement: Banner 7.0 and Beyond Susan LaCour, Senior Vice President, Solutions Development California Community Colleges Banner Group.
Business Analysis Consulting: STS Realty. About STS Realty Small realty group specialized in renting & selling properties in the Southwest Florida Region.
© 2004, The Trustees of Indiana University Kuali Project Development Methodology, Architecture, and Standards James Thomas, Kuali Project Manager Brian.
Landstar Application Case Study: Development Of Content-rich Solutions For The Mobile Employee Bob Leo Director of Professional Services October 15, 2000.
Introduction to the Continual Service Improvement Toolkit Welcome.
EPA Geospatial Segment United States Environmental Protection Agency Office of Environmental Information Enterprise Architecture Program Segment Architecture.
NA-MIC National Alliance for Medical Image Computing UCSD: Engineering Core 2 Portal and Grid Infrastructure.
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
1 Object-Oriented Analysis and Design with the Unified Process Figure 13-1 Implementation discipline activities.
Codis. Presenter: Mohan Nischal & Steve Allan Agenda  Introduction to Codis  Codis Excelerator  Codis E-Requisition Solution (CEReS)  Q & A.
ACTED AME Appraisal, Monitoring and Evaluation. Summary 1/ ACTED AME department 2/ AME Responsibilities 3/ AME throughout project cycle 4/ Involvement.
CSI - Introduction ITIL v3.
1 Towards a Knowledge Management Framework Brian Lehaney Head of Statistics and Operational Research School of Mathematical and Information Sciences Coventry.
SQL Server 2012 Session: 1 Session: 4 SQL Azure Data Management Using Microsoft SQL Server.
CHANGE READINESS ASSESSMENT Measuring stakeholder engagement and attitude to change.
Simplifying IT, Empowering Business.
SESSION 2 ISSAT Governing Board Core Group Meeting 2013 PERFORMANCE MANAGEMENT.
Copyright © 2007 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are trademarks of Accenture. October 24 th, 2007 CORE.
Analysis and Reporting Toolset (A&RT): Lessons on how to develop a system with an external partner David Smith AstraZeneca.
Introduction to Oracle Forms Developer and Oracle Forms Services
Making the Case for Business Intelligence
Introduction to Oracle Forms Developer and Oracle Forms Services
Introduction to Oracle Forms Developer and Oracle Forms Services
Do it Yourself ERP ! Fully Configurable Work Flow Management System.
How to prepare for the End of License of Windows Server 2012/R2
Strategic Management & Planning
Alignment of COBIT to Botswana IT Audit Methodology
Power point presentation DR.Shareef Mahgoub
Presentation transcript:

Atkins New PSR Reporting Solution Using Actuate e.Spreadsheet October 2007

Atkins New PSR Reporting Solution Plan Design Enable Atkins is one of the world’s leading providers of professional, technology-based consultancy and support services with a turnover of £1.6bn and more than 16,800 professional staff.

October 2007Atkins New PSR Reporting Solution Our Work… We PLAN all aspects of our clients’ projects, conducting studies covering technical, logistical, legal, environmental and financial considerations. Planning, implementation and long term management of very large projects. We DESIGN systems, processes, building and civil structures. We develop cutting edge solutions and combine them with tried and tested technologies to achieve an optimal result. We ENABLE complex programmes, delivering one-off projects and managing ongoing processes to reduce timescales, cost and disruption, allowing our clients to focus on their core operations. Atkins’ operations are based in some 130 offices throughout the UK, and a further 70 offices providing consultancy services in Continental Europe, the Middle East, Asia Pacific and the Americas. is focused on the efficient operation of our clients capital programmes

October 2007Atkins New PSR Reporting Solution Atkins and Actuate Atkins have been using Actuate e.Reports for the last 4 years. Atkins “UK IS” provide Actuate Reporting functionality as a hosted service to the Atkins business community. We have an internal costing structure to charge the business for their usage of Actuate’s resources and hardware. The reporting functionality is used to meet both internal and external reporting requirements. There were about 1000 USERS in three different business units sharing the same Actuate report server in March 2007.

October 2007Atkins New PSR Reporting Solution The Business Challenge Project PREMIER Profit Rec Enhancement, Management Information & Exception Reporting 5 main objectives: 1. Improve current JDE entry of PSR re-forecasts 2.Tidy up the Profit Recognition and associated month-end processes making them quicker, more secure and more robust 3.Make project and enquiry information available in a data warehouse accessible from the portal environment 4.A suite of standard reports, exception reports and tools to produce ad- hoc intelligence reports, including electronic methods of distribution. 5. A platform for future potential improvement – beyond current scope Requirements driven by business demand, consistent with 5 year strategy

October 2007Atkins New PSR Reporting Solution Old Report Process Reports Created By; Extracting data from Oracle JDE database to an MS Access database Processing data in MS Access and export to text file Importing text file into MS Excel and processing again Distributing locked spreadsheet to senior finance staff Senior finance staff running macro in spreadsheet and distributing PSR to their PM’s Problems with this Method Too many points of failure Too complicated 2GB file size limit on an MS Excel file!!

October 2007Atkins New PSR Reporting Solution Requirements of New Solution Simplify creation and distribution of Excel reports Replace old architecture Enable better support and allow for future enhancements No change to appearance of the reports produced Keep rich Excel output, ‘users do not want change’ Easily accessed by project Managers and other finance staff Secure Internet access Common interface (single login into one system)

October 2007Atkins New PSR Reporting Solution Solution Actuate e.Spreadsheet Infrastructure already in place and used in three business units Very configurable web based solution Deliver the right information in a full Excel experience iServer Platform provides control Existing Data Warehouse was extended with more data from the Finance Systems A dedicated site was setup on our Group Portal, as the entry point into the system. This site included key training and communication for the relevant user community, and assisted in the final rollout.

October 2007Atkins New PSR Reporting Solution Benefits of e.Spreadsheet application Much simpler report process ETL stage from Oracle JDE database to data warehouse Run driver e.Report overnight to pre-generate majority of e.Spreadsheets reports Less manual work for senior finance staff PSR data validated on input Project directors identified directly from Finance System Quicker month end close and access to management accounts Ends the reliance on temporary and vulnerable workarounds Automates report and PSR distribution Anomalies identified and addressed sooner Better analysis and understanding of results Easier access to high level project data Better intelligence reports: bid activity, work-in-hand with indicative phasing, revenue by client, early warning of provisions, etc.

October 2007Atkins New PSR Reporting Solution PSR Portal

October 2007Atkins New PSR Reporting Solution Active Portal Login

October 2007Atkins New PSR Reporting Solution Parameter Framework

October 2007Atkins New PSR Reporting Solution Example Reports

October 2007Atkins New PSR Reporting Solution Project management approach based on Prince2 methodology, with Group Sponsorship & Governance Live in April 2007, using a staged ramping up approach beginning in Feb To ensure processes are robust and functionality is accurate - To ensure performance is monitored & capacity management is understood prior to a full rollout in April 2007 to 2500 staff. Solution created in 5 months, but could have been shorter in hindsight User feed back has been positive Key Lesson Learnt: A full lifecycle “Waterfall” project management methodology will not work in this type of solution development as it requires a high level of input from the user group, during the design and coding stages. It is therefore recommended that a RAD development approach is used for similar projects. Rapid Application Development (RAD) is an approach to software development on an iterative basis, and can be used within existing methodologies, for example a “waterfall” methodology. Project Approach & Lessons Learnt

October 2007Atkins New PSR Reporting Solution Next Steps Considering moving the application to a more robust server and an Actuate clustered environment that can offer some level of failover due to the critical nature of the Spreadsheet application to the business. Current hardware is old. Example 2 machine cluster