SIP Development Process Overview For Triad Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ Eddie.

Slides:



Advertisements
Similar presentations
SIP Development Process Overview For the Great Smoky Mountain National Park Transportation Partners Requirements, Scenarios and Timelines Laura Boothe,
Advertisements

Status of Air Quality Standards for Criteria Pollutants EPA Region 2 Air Programs Branch Bob Kelly, Regional Air Modeler.
Fine Particle Health Impacts and the Need for Control Measures in New Jersey Kenneth Fradkin, US EPA Region 2 Air Programs Branch Hearing of the New Jersey.
February, 2010 LEA Support Advisory Council. Agenda 2:30-3:00Discuss plan revision process (feedback and support) 3:00-3:30Discuss February workshops.
1 Targeted Case Management (TCM) Changes Iowa Medicaid Enterprise October 14, 2008.
State Implementation Plan (SIP) Development Process Presentation to: Centralina Nonattainment Area Elected Officials and City and County Managers and Planners.
State Implementation Plan (SIP) Development Process Presentation to: Triangle Area Mayors and County Commission Board Chairs Donnie Redmond April 7, 2005.
DRAFT Mobile sensitivity How sensitive is the air quality model to changes in VMT? Mike Abraczinskas, Laura Boothe, George Bridgers, Phyllis Jones, Vicki.
State Implementation Plan (SIP) Development Process Presentation to: Centralina Council of Governments Donnie Redmond July 13, 2005.
SIP Development Process Overview For Rocky Mount Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ.
SIP Development Process Overview For Metrolina Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ.
SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ.
Overview of the Mountain Area Transportation Conformity Process.
Overview of the Transportation Conformity Process.
Isolated Rural Areas US EPA Conformity Training Summer 2004 Eddie Dancausse FHWA NC Division x112
State Implementation Plan (SIP) Development Process Presentation to: Granville County Board of Commissioners Donnie Redmond July 5, 2005.
1 State Implementation Plan (SIP) Modeling for 8-hour Ozone Preliminary 2009 Results For Triangle and Rocky Mount Stakeholders Mike Abraczinskas, NCDAQ.
1 Ozone And Fine Particle Attainment Issues In NC Attainment Planning Technical Exchange Session 1 NCDENR, Division of Air Quality September 30 th, 2004.
Transportation Conformity Basics. What is Transportation Conformity? Transportation conformity (conformity) is a way to ensure that Federal funding and.
Transportation Conformity Basics Eddie Dancausse FHWA NC Division x112
1 Report on Proposed Ozone Standards Report on Proposed Ozone Standards March 25, 2010.
Public Meeting to Receive Comments on NCs Potential Recommendation Designations for PM 2.5 in North Carolina.
Duke Power Clean Smokestacks & Mercury Efforts April, 2004.
Sulfur Dioxide Standard and Nonattainment Designation Process April 12, 2011.
EPA Preliminary Designations for the 24-hour PM 2.5 National Ambient Air Quality Standard Air Quality Technical Advisory Committee (AQTAC) September 18,
Our Vision – Healthy Kansans living in safe and sustainable environments.
Overview of the Green Infrastructure Section of PWSAs Feasibility Study Presentation Charrette No. 3: April 19, 2013 Presenter: Ross Gordon, PE, CFM, LEED.
1 Proposed Rulemaking to Implement Provisions of the Federal Clean Air Interstate Rule Environmental Quality Board Meeting Harrisburg, PA February 20,
Clean Air Interstate Rule (CAIR) CAIR Requirements for SIPs Office of Air and Radiation March 2005.
© WRI & WBCSD, 2010 Metropolitan Washington Council of Governments (COG) Recycling Committee Meeting March 18, 2010 Greenhouse Gas Protocol Product/Supply.
Clean Air Interstate Rule (CAIR) Reducing Regional Transport of Emissions and Helping States Achieve the PM2.5 and Ozone NAAQS Beth Murray Clean Air Markets.
PM NAAQS Review Update Joseph Paisie Air Quality Strategies & Standards Division, Office of Air Quality Planning & Standards, EPA WESTAR Fall Business.
1 SAFETEA-LU Changes to the Transportation Conformity Rule February 21, 2008.
1 PM NAAQS: Update on Coarse Particle Monitoring and Research Efforts Lydia Wegman, Office of Air Quality Planning & Standards, EPA Presentation at the.
Presentation to the Joint Legislative Audit Committee May 9, 2002 Air Quality Benefits of Wisconsin’s Motor Vehicle Inspection Program.
EPA’s New Fine Particle Standard & Metropolitan Washington Region Sunil Kumar MWAQC, December 18, 2012 MWCOG Item #3.
“Cleaner Air Sooner” South Carolina Department of Health and Environmental Control Bureau of Air Quality.
Session 7: Other Conformity Rule Changes FHWA Transportation Conformity and CMAQ Workshop Summer 2004.
Transportation Conformity and Development of Emission Budgets.
Update: National Ambient Air Quality Standards Association of California Airports September 15, 2010 Phil DeVita.
Final Clean Air Fine Particle Implementation Rule for the 1997 PM2.5 Standards Rich Damberg EPA Office of Air Quality Planning and Standards June 20, 2007.
September 2006 Revisions to the National Ambient Air Quality Standards for Particulate Matter Overview
Department of the Environment The State Implementation Plan Process – Our Next Steps Brian Hug Division Chief, Air Quality Planning and Policy Division.
Air Quality Beyond Ozone and PM2.5 Sheila Holman North Carolina Division of Air Quality 6 th Annual Unifour Air Quality Conference June 15, 2012.
Transportation & Air Quality Planning AMPO MPO Educational Series November 8,
A&WMA Georgia Regulatory Update Conference Current State of the Air in GA Jac Capp, GA EPD, Branch Chief, Air Protection Branch April 16, 2013.
Minnesota Air Quality and Attainment Status Frank Kohlasch Kari Palmer Statewide Travel Demand Coordinating Committee Meeting October 14, 2010.
2015 FTIP/FSTIP Workshop Transportation Conformity Wade Hobbs FHWA CADO January 15, 2014.
Air Quality and Conformity Issues James M. Shrouds, Director Office of Natural and Human Environment Federal Highway Administration AASHTO SCOE Meeting.
It’s a Good Idea to Shut It Down: Reducing Unnecessary Idling School Bus Driver “Reduce Idling” Training North Carolina DMV June 2005 Save Fuel and Breathe.
1 MOBILE6 -Input and Modeling Guidance -SIP and Conformity Policy North American Vehicle Emission Control Conference Atlanta, April 4, 2001 Gary Dolce.
Recent Developments in Transportation Conformity Beverly Chenausky Multimodal Planning Division – Air Quality Breakout Session: Transportation Conformity/Air.
Transportation Conformity in North Carolina. Transportation Planning Framework Required by NCGS §136 ‑ In MPOs, includes 20 year fiscally constrained.
Early Action Compacts Presented by Karen Borel EPA Region 4 March 25, 2003.
1 PM2.5 Redesignation Request for the Metropolitan Washington,D.C. Region Joan Rohlfs Chief, Air Quality Planning Metropolitan Washington COG.
National Ambient Air Quality Standards and Current Status of Air Quality Laura Boothe North Carolina Division of Air Quality MCIC Workshops March 2012.
1 SJVAPCD DRAFT SCHEDULES May 2, Hr OZONE ATTAINMENT DEMONSTRATION PLAN PM10 ATTAINMENT DEMONSTRATION PLAN.
Indiana Department of Environmental Management 2009 Fine Particles (PM 2.5 ) Summary Report Office of Air Quality.
Final Clean Air Fine Particle Implementation Rule Briefing for NTAA EPA Office of Air Quality Planning and Standards April 17, 2007.
Transportation Conformity Overview H-GAC Conformity Workshop May 30, 2007.
Indiana Department of Environmental Management Office of Air Quality (800) Fine Particles (PM 2.5 ) Summary Report.
State Implementation Plan for 8-Hour Ozone in San Diego Planning and Technical Support Division May 24, 2007 San Diego.
1 Consideration of Final Rulemaking Clean Air Interstate Rule Environmental Quality Board Meeting Harrisburg, PA December 18, 2007 Joyce E. Epps Director,
Fine Particulate Matter SIP for Washington DC Special Stakeholder Meeting February 20, 2008.
Session 2: Background FHWA Transportation Conformity and CMAQ Workshop Summer 2004.
Fine Particles in the Air: Taking Action, Improving Health Presentation at STAPPA/ALAPCO Meeting Coeur d'Alene, Idaho Tom Curran, EPA Office of Air Quality.
Air Quality, Transportation Conformity, and the FSTIP FTIP/FSTIP Workshop February 9, 2016.
OAQPS Update WESTAR April 3,  On March 12, 2008, EPA significantly strengthened the National Ambient Air Quality Standards (NAAQS) for ground-level.
TRANSPORTATION CONFORMITY
Proposal to Revise the National Ambient Air Quality Standards for Particle Pollution WESTAR Meeting March 2006.
Presentation transcript:

SIP Development Process Overview For Triad Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ Eddie Dancausse, FHWA February 15, 2005

Outline Background on PM2.5 standard General PM2.5 timeline Whats a SIP? Scenarios –Redesignation/Maintenance SIP Requirements vs. –Attainment Demonstration SIP Requirements

Background Annual PM2.5 standard –If a monitored design value is > 15.0 µg/m 3, that monitor is violating the annual standard –The design value is defined as: Annual mean concentration, averaged over 3 years

Human Hair (70 µm diameter) Hair cross section (70 m) PM 2.5 (2.5 µm) PM 10 ( 10µm ) M. Lipsett, California Office of Environmental Health Hazard Assessment A complex mixture of extremely small particles and liquid droplets Particulate Matter: What is It?

Public Health Risks Are Significant Particles are linked to: Premature death from heart and lung disease Aggravation of heart and lung diseases –Hospital admissions –Doctor and ER visits –Medication use –School and work absences And possibly to –Lung cancer deaths –Infant mortality –Developmental problems in children, such as low birth weight

PM2.5 Composition

Typical PM size distribution

From:

North Carolina Areas Designated Nonattainment for PM2.5 (EPA 12/17/04)

Triad PM2.5 Design Values Monitor Lexington Hattie Ave Shattalon Mendenhall Cherry Grove Burlington County Davidson Forsyth Guilford Caswell Alamance

PM2.5 Nonattainment Timeline Immediate (April 5, 2005) –New source review One year –Transportation conformity Three years –State Implementation Plan (SIP) – attainment demonstration Five years (or as expeditiously as practicable) –Attain standard (Hickory & Triad)

PM2.5 Nonattainment Timeline Definitions for Triad Area Effective date = Transportation conformity date = SIP submittal date = Attainment date = Data used to determine attainment = (Modeling) Attainment year = Redesignation base years = Maintenance years = April 5, 2005 April 5, 2006 April 5, 2008 April 5, 2010* * 2005 or 2006 TBD * Or as early as possible

State Implementation Plan (SIP) Need a SIP submittal to EPA within three years –Attainment Demonstration that details the States plan to bring the area into attainment of the Federal standard Significant emission controls are already underway –Clean Smokestacks Act –Vehicle emissions testing –Ultra-Low sulfur fuels –Cleaner Engines

2 Scenarios are possible Redesignation/Maintenance SIP Attainment Demonstration SIP

Scenario Overviews Redesignation/Maintenance SIP –If area attains standard prior to attainment demonstration submittal date (April 5, 2008) –Package containing emissions estimates for the year the area came into attainment and maintenance years –Requires data for the year the area came into attainment and maintenance years Attainment Demonstration SIP –Submittal 3 years after effective date (April 5, 2008) –Based on comprehensive modeling –Requires data for only the attainment year (2009)

Redesignation/Maintenance SIP Process Overview Area attains standard (2005 or 2006) –Develop emissions inventory for the year area attains standard –Develop maintenance emissions inventories for at least 10 years beyond redesignation approval Determined through Inter-Agency Consultation Process –Develop interim/maintenance emissions inventories 3 to 5 year increments –Compare maintenance emissions to attaining years emissions Maintenance emissions must be lower than attaining years emissions… If not, control strategies must be developed –Or use modeling

Redesignation/Maintenance SIP Process Overview Develop draft SIP package –Emissions comparisons –Motor Vehicle Emissions Budgets –Contingency measures Take draft SIP to public hearing –30 day comment period Submit to EPA anytime prior to April 2008 Update plan 8 years after redesignation –Must examine additional 10 years beyond final maintenance year in redesignation package

Redesignation/Maintenance SIP Example Timeline End of > examine PM2.5 data –If the area attains 2005 and maintenance years (e.g. 2007, 2010, 2013, 2016) data needed for emissions estimates/comparisons –VMT and speeds Contingency measures –NCDAQ define triggers and follow-up actions. Set motor vehicle emissions budgets –Consultation process… What years? –Safety margins? Public hearing Request expeditious redesignation back to attainment/maintenance –Redesignation could be final as early as summer 2006 –Conformity due 18 months after approval of Redesignation SIP

Redesignation/Maintenance SIP Example Timeline End of > examine PM2.5 data –If the area does not attain Must start modeled attainment demonstration Review 2006 PM2.5 data –Possibly start redesignation package

Redesignation/Maintenance SIP Requirements of transportation partners VMT and speeds for attaining year and maintenance years Participate in stakeholder meetings Provide input on additional strategies (if needed) and contingency measures Decision on how Motor Vehicle Emissions Budgets are set… –Input on which years to set budgets –County by County (NCDAQs general position) –Area wide (Need unanimous agreement with justification as to why) Review package during public comment period

Attainment Demonstration SIP Process Overview Modeling Attainment year = 2009 –Attainment date April 5, 2010 Develop emissions inventory –2002 inventories –2009 attainment year inventory Comprehensive modeling for 2002 and 2009 –Modeling full year –Must pass the USEPA modeled attainment test –If not, additional control strategies must be developed and modeled

Attainment Demonstration SIP Process Overview Clean Air Act requirement for Basic areas –Reasonable Available Control Measures (RACM) Develop draft SIP package –Motor Vehicle Emissions Budgets for attainment year –Contingency measures Take draft SIP to public hearing –30 day comment period Submit to EPA by April 2008

Attainment Demonstration SIP Example Timeline Base year modeling underway –Collected (in 2004) VMT and speed data for 2002 Future year modeling will start Spring 05 –2009 VMT and speed data needed –Have needs of RACM been met? Awaiting further guidance from USEPA Future year emissions and air quality modeling

Attainment Demonstration SIP Example Timeline Must pass the USEPA modeled attainment test –If not, additional control strategies must be developed and modeled Develop draft SIP package –Motor Vehicle Emissions Budgets for attainment year –Contingency measures Take draft SIP to public hearing –30 day comment period Submit to EPA by April 2008

Attainment Demonstration SIP Requirements of transportation partners VMT and speeds for modeled attainment year Participate in stakeholder meetings –Technical update meetings –RACM development –Provide input on additional strategies (if needed) and contingency measures –Decision on how Motor Vehicle Emissions Budgets are set… County by County (NCDAQs general position) Area wide (Need unanimous agreement with justification as to why) No safety margins Review package during public comment period

VMT and Speeds Attainment Demonstration (2009) –March 2005 Redesignation (2005/2006 & maintenance years) –October 2005 or October 2006

Stakeholder Meetings NCDAQ will host periodic technical updates on process –Spring and Fall 2005 at minimum NCDAQ will host consultation meeting(s) on control strategy development (if needed) and contingency measures RACM (if needed) Will SICM meetings

Review of SIP Package days once package is made public Will SICM meetings

Motor Vehicle Emission Budgets (MVEBs) If area wide budget –Need unanimous agreement with justification as to why by February 2006 –TAC resolution, NCDOT letter Otherwise, county by county (sub- area budgets)

Area-Wide Advantages –Budgets can be shared (if the SIP language allows this) Disadvantages –MPOs/RPOs must collectively make a conformity determination –One MPO/RPO in the non-attainment area (NA) lapses, everyone lapses (assuming more than one MPO/RPO in the NA area)

Sub-Area Advantages –Once conformity is established for entire NA area….. Conformity determinations can be made for specific MPOs/RPOs (without impacting the entire NA area) If one MPO/RPO within the NA lapses it does not impact remaining areas until their next conformity determination

Sub-Area (continued) Disadvantages –Budgets cannot be shared

New Standards? EPA has reviewed the PM2.5 standards –EPA Staff Paper - Draft out for comment 15 µg/m 3 annual standard µg/m hr standard (99 th percentile) Or µg/m 3 annual standard µg/m hr standard (99 th percentile)

New Standards? Fine Particulate (tentative schedule) October 2004Criteria Document December 2005EPA proposes New Standard September 2006EPA Finalizes New Standard September 2008EPA Promulgates September 2011States Submit SIPs

Questions/Comments Laura Boothe, Chief of Attainment Planning Mike Abraczinskas, Environmental Engineer II Eddie Dancausse, Air Quality Specialist x112