December 2012 Version 3.0.1. Rapid Resource Response.

Slides:



Advertisements
Similar presentations
The Metropolitan Medical Response System Program Overview.
Advertisements

ConocoPhillips Transportation Emergency Response Program
All-Hazard Emergency Planning for Colleges and Universities
DISASTER PLANNING: Do it Before Disaster Strikes Community Issues Satellite Workshops Department of Commerce & Economic Opportunity.
Hurricane Sandy. Sandy was the second-largest Atlantic storm on record Storm surge reached over 13 feet in coastal areas of New York and New Jersey The.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
National Incident Management System (NIMS)
Functional Areas & Positions
Visual 8.1 Course Summary Unit 8: Course Summary.
Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
Statewide Homeland Security Strategy Overview. Texas State Homeland Security Program.
Principles and Challenges of Training Harold L. Timboe Commander, Medical Reserve Corps Texas State Guard.
State Emergency Coordination Center (SECC) Overview & SECC Resource Management Steve Knecht, Chief of Operations Tam Kolar, Logistics Section Chief Disaster.
5 - m i n u t e S t r a t e g i c T r a i n i n g f o r E m e r g e n c y P r e p a r e d n e s s COPYRIGHT 2005 Authorization to Copy: No Part of this.
Community Emergency Response Team Community Emergency Response Team (Your name) For the Your Picture.
NERT College Disaster Operations Disaster Operations - ICS Command Staff Workshop Refer to Field Operations Guide, Chapter 5.
Public Health Seattle & King County Incident Command System Overview May 2004.
Hospital Surge Capability Program Neighborhood Emergency Acute Care Center Ned Wright Lisa Gibney Linn County, Iowa Medical Reserve Corps Coordinators.
Contra Costa County CERT Program Unit 6 – CERT Organization Released: 18 August 2010.
@TxSchoolSafety Continuity of Operations Planning Workshop Devolution & Reconstitution.
Southwest Florida. SW Florida MRC Major Activities Mass casualty events Mass prophylaxis clinics Disaster mental health Special needs shelters Public.
Presenter’s Name June 17, 2003 Catastrophic Preparedness Incorporating Whole Community Philosophy  We must plan for the real, not the manageable  Plan.
Bridging the Gaps: Public Health and Radiation Emergency Preparedness Mr. James Kish, Director Technological Hazards National Preparedness Directorate.
All-hazards readiness in the United States Learning to communicate and build a culture of preparedness David Passey Senior Representative U.S. Federal.
BUILDING STRONG ® USACE/FEMA 2011 Remedial Action Program Workshop December 6-9, 2011 Orlando, FL.
Session 121 National Incident Management Systems Session 12 Slide Deck.
Citizen Corps Uniting communities. Preparing the Nation. 1.
Unit 3: Command & Control IC/IMT Interface
1 1 FEMA Region VII Private Sector. Private Sector Representative Subject Matter Experts Provide Situational Awareness Manage Logistics Crosscutting Planning.
3  Why does a supervisor or manager need to be familiar with emergency management terms and concepts?
Incident Command System (ICS)
CITIZEN CORPS & CERT ORGANIZATIONS. What is Citizen Corps? Following the tragic events that occurred on September 11, 2001, state and local government.
A First Step in Decision Support Tools for Humanitarian Assistance during Catastrophic Disasters: Modeling Hazard Generated Needs John R. Harrald Frank.
FEMA Region IX RRCC Watch Center August RRCC Watch Center * Oakland, CA * August Mission  The Regional Response Coordination.
The Incident Command System
National Earthquake Program Managers Meeting 1 May 2013 Region X Cascadia Subduction Zone Planning Effort.
IS-813: ESF #13 – Public Safety and Security
Association of Defense Communities June 23, 2015
Dr. Charles W. Beadling Central Asia Regional Health Security Conference April 2012 Garmisch-Partenkirchen, Germany.
Unit 4: Functional Areas and Positions
Survivor Centric Emergency Management Integrating the Access and Functional Needs of the Whole Community Before, During and After Disasters August 2015.
PHEP Capabilities John Erickson, Special Assistant Washington State Department of Health
Why is CERT Needed? Disasters can severely restrict and overwhelm emergency responders, communications, transportation and utilities, leaving neighborhoods.
Bioterrorism and Emergency Preparedness November 16, 2005 Jon Huss Director, Community Preparedness Section.
{ MEMA Massachusetts Statewide Mass Care and Shelter Coordination Plan 1.
Medical Surge 101Division of Public Health, Public Health Preparedness Wisconsin Department of Health Services Brian Kaczmarski Training and Exercise Coordinator.
© 2014 The Litaker Group LLC All Rights Reserved Draft Document Not for Release or Distribution Texas Department of State Health Services Disaster Behavioral.
Disaster Planning Workshop Hosted By: Pleasantview Fire Protection District.
Community Emergency Response Team
Visual 6.1 Unit 6 – CERT Organization. Visual 6.2 CERT Organization Objectives  Describe the CERT organization.  Identify how CERTs interrelate with.
Office of Public Health Preparedness and Response Division of Emergency Operations Centers for Disease Control and Prevention.
EXERCISE SEP 2015 Jakarta, Indonesia
Incident Command System Nevada Department of Corrections.
Illinois Mobile Support Teams Incident Management Team and the Emergency Management Assistance Team.
2015 USACE Exercise – December 1, 2015 New Madrid Seismic Zone – Earthquake FEMA Mission, Legal Authorities and Regional Capability Overview Gus Wulfkuhle.
Tom Lenart & John Field CT DEMHS Region 2.  Department of Emergency Services and Public Protection (DESPP)  Commission on Fire Prevention and Control.
Harris County Case Study.  Aligning plans with emergency support functions (ESFs) can facilitate an efficient and effective response to emergencies.
DHS FEMA Region IX Response Operations. FEMA Region IX Jurisdictions Pacific Area Office (Ft. Shafter, HI) Hawaii 2500 miles Guam 3700 miles American.
DHS/ODP OVERVIEW The Department of Homeland Security (DHS), Office for Domestic Preparedness (ODP) implements programs designed to enhance the preparedness.
The Metropolitan Medical Response System Olan Johnston Christine Tolis The New England Center for Emergency Preparedness The Northern New England MMRS.
Committee Annual Planning Session Marriott Hotel & Conference Center
Emergency Operations Planning
FEMA Hostile Action-Based (HAB) Scenario Update
Southern California Catastrophic Earthquake Response Plan
2017 Health care Preparedness and Response Draft Capabilities
“Reaching Everyone” The Howard County Experience
An Introduction To VDEM VDEM Director of External Affairs
MABAS Matters Part 2 February 2016
Region 13 and the Healthcare Coalition of Southwestern PA
Disaster Preparedness and Response
Presentation transcript:

December 2012 Version 3.0.1

Rapid Resource Response

A deployment and operational strategy different than traditional methods of statewide response.

Nothing – Its another option Traditional deployment operations are: Tiered, layered response SILO approach to capabilities Adequate for single event in single location Triple R – Nontraditional integration of total force as a resource multiplier to address multi-task saturation A way to utilize IL resources

Handout

Grant award & funding Risk analysis and catastrophic planning Planning based on MOM mindset Maximum of Maximum Defines meta-disasters Pursues Whole Community Concept NLE 11 – AAR – Observations & findings IN, OH, MO Teams

New Madrid fault line IND in urbanized area Improvised Nuclear Devise Multi-location simultaneous events Biological outbreak of resilient strain All are probably Triple R application

Source: National Preparedness Goal Draft – PPD #8 There is a no-notice event impacting a population of seven million within a 25 thousand square mile area. The impacted area includes several states across multiple regions.

Source: National Preparedness Goal Draft – PPD #8 Severe damage is projected to critical infrastructure including essential transportation infrastructure. The projected number of fatalities is 195,000 during the initial hours of the event. It is projected that 265,000 survivors will require emergency medical attention. At least 25 percent of the impacted population will require mass care, emergency sheltering, and housing assistance.

Overwhelming task saturation Limited information & size-up flow Equipment & critical materials access Transportation challenges Limited, if any, interstate assistance Limited US&R deployment capability FEMA– limited resource – competing interests Life – survivors – time (72-96 hours)

Resource force multiplier Integrative approach – US&R & division teams Unity of command structure – centralized Tactical speed, agility, flexibility & control decentralized Span of control & mission support structure in place Maintains core resource 80/20 rule Illinois focus

1 – US&R team – 210 assigned positions 3 – 70 person deployment teams 1 – US&R equipment cache 39 – Divisional TRT teams with equipment 41 – Divisional HazMat teams with equipment 80 – Division teams rostered at 20 qualified members each

68 – divisions with expedient shelters, ATV, generator/light towers, IMT trailer Tiered response: local fire, local MABAS division, division special team, statewide plan, US&R team (70 person package)

State Deployable Technical Rescue Teams

State Deployable Hazardous Response Teams

US&R Team – All 3 platoons mobilize On call platoon deploys to set up forward staging area Reserve platoons report to MABAS Readiness Center (MRC) to set up Triple R Support Teams and staff the Mobility Control Cell (MCC) Aerial Recon Triage Teams assembled and deployed US&R Support Teams deployed to forward staging to meet Triple R Task Forces

TRT and HM team personnel Division TRT & HM teams deploy and meet US&R Support teams at forward staging area This makes a 24 person Triple R Task Force Divisional support & sustainment equipment Divisional teams deploy with expedient shelter, ATV, generator, and 72 hours supplies, as indicated

FILOs at division level – Fire Service Intelligence Liaison Officer – ILO new Boots on the ground recon and intel to Statewide Terrorism & Intelligence Center (STIC) and MABAS Readiness Center (MRC) Control Cell Ongoing progress reports and team status Become on the ground liaisons for US&R aerial triage team

Mission support US&R staff (56) Medical, Logistics, Plans, Safety, etc. Report to MRC Control Cell Provide mission support for field deployed teams in their areas of expertise Work with MABAS staff and MABAS Incident Support Teams (MIST) at MRC Control Cell Prepare for possible deployment of additional US&R members and equipment

Illinois focus – US&R team multiplier 20 deployable 24-person Triple R Teams (US&R, TRT & HM division teams) cross functional, sustained (72 hrs) abilities with equipment & support packages 20 divisional TRT & HM teams in ready reserve to reinforce deployed teams following situation assessments and prioritization (10 person each) 68 FILOs for firsthand recon and progress reports 3, 2-person aerial triage teams for recon and prioritization 20 special operations teams (10 individuals each) available for relief rotations MABAS Staff, MIST, US&R mission support at MRC Control Cell

Challenges: Build US&R & divisional team pairing partnerships Build divisional team competence, stability & dependability Train, brief, exercise and evaluate One team mentality – one mission leadership Command, Control, Leadership

Challenges: Initial activation deployment method selection – Traditional/Triple R Define primary, secondary, tertiary communications plans Define alternate transportation options

Steps: Brief and gain support leadership & allied agencies Train, brief, exercise and evaluate Divisional team rosters and investments Prepare for 2012 DHS grant investment cycle Field validation exercise

Investments: Build US&R/Divisional team partnerships – meet/greet and practice performance Acquire two additional US&R equipment caches for prepositioning central & southern Illinois – Approximately $12 million Continue prepositioning of critical self sustainment resources in central & southern Illinois Maintain resources to adequately manage, maintain and sustain traditional and Triple R deployment and operations capability ($2 million estimated annually)