CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Structure testing and RF tests stands Jan Kovermann CERN On behalf of the CLIC structure test team.
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland February 2014.
CERN klystron test stand – CLIC Workshop, Oct page 1 F. Peauger High-Power RF Test Areas: Design & Planning Progress of the CERN Klystron Test Area.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
X-Band and High-Gradient à la Carte
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
AWAKE electron source New Electron Source WP at CERN
30 GHz waveguide line modification towards 12 GHz.
1 28-Nov-2011 Dog-leg meeting «BE/RF» Current 30 GHz layout CTF3 CTF2 Overmoded 90 bend Mode converter Ø50 circular waveguide (existing line) 326 mm 1.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
G.McMonagle, 8 th July 2011 CLIC Project Meeting X Band Stand Alone Power Source at CERN Stand Alone Power Source (SAPS) The story so far
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
The status of RF components on Maria Filippova, RF components: Loads Phase shifters Attenuators Hybrids Splitters Directional couplers.
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Update on X Band Klystron Modulator Installation.
EnEfficient RF Sources Workshop. June 2014 I. Syratchev X-band high RF power testing activity at CERN I.Syratchev.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
Overview of NLC X-Band Technology and Applications Including a Compact XFEL Chris Adolphsen SLAC.
TBTS Test Program & Schedule G. Riddone
XBOX-2 Signals Ben Woolley. Signals minus Vacuum.
A 500 MeV S-band Low Cost Electron Beam Source for ILC Keep Alive Source Goal: MeV, 3 nC, ~ 1 mm on ILC Ti Target Wei Gai, ANL.
M. FILIPPOVA CERN CLIC BE-RF RF DEVELOPMENT MEETING ON Inventory of RF components.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
June 16, 2015 CLIC WORKSHOP JANUARY 18 – 22, 2016 OPTIMIZED RF UNIT I 1 January 21, 2016 By: Mikael Lindholm.
Commercial high-power X-band experience: klystron/modulators, and waveguide vacuum flanges CLIC Workshop January 2016 G. McMonagle (on behalf of Xbox team)
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 CEA SACLAY CLIC R&D Activities F. Peauger, A. Hamdi, M. Desmons, W. Farabolini, P. Girardot.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
F. Peauger - CEA DSM IRFU SACM 18 May 2008 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG.
The status of RF components G. Riddone, M. Filippova RF development meeting on
KEK test area plans Shuji Matsumoto Accelerator Lab., KEK.
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 High power RF components F. Peauger, A. Branco, M. Desmons, W. Farabolini, P. Girardot,
Areal RF Station A. Vardanyan
Multi-stage pulse compressor
Progress and Status of X Band Stand Alone Power Source (SAPS) at CERN
Manipulating RF phase and amplitude at high power level.
An X-band system for phase space linearisation on CLARA
N. Catalan Lasheras on behalf of a very large team
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
The situation is far better than I had thought.
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
352MHz Klystron Control for the 3MeV Linac test stand
12 GHz High Power RF components requirements for CEA activities
Shuji Matsumoto Accelerator Lab., KEK
Summary of WG4 Normal Conducting RF
Experience with X band klystrons and solid state modulators at CERN
Task 2: High-gradient normal-conducting technology development
X-band Facilities and High Gradient Tests Stands Around the World
CLIC Klystron based. Updates 2017.
Recent high-gradient testing results from the CLIC XBoxes
Advanced Research Electron Accelerator Laboratory
Presentation transcript:

CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor Mode convertors RF Valve Circular pumping port Status 03/2010

Milestones  CLIC Frequency change: 30 GHz ► 12 GHz  Mandate for 12 GHz test-stand at CERN  SLAC WFOA: Design and Production of klystron  “ French White Paper”: Modulator, PC and RF-Component Supply  CERN component review  Pulse Compressor order to GYCOM  CEA tender for Modulator  Modulator contract with Scandinova  Start of klystron testing at SLAC 2

Organization CLIC WS October 08 Klystron G.McMonagle G. Rossat Modulator CEA & G.McMonagle Waveguides G.McMonagle G. Rossat Pulse Compressor CEA & I.Syratchev K. Schirm Operation/Controls M.Draper S. Dobert Low-level RF J. Mourier L. Timeo Infrastructure J.Monteiro K. Schirm Test-Stand G.Riddone S. Dobert K. Schirm G. McMonagle F. Peauger CEA K. Schirm

Klystron KM Schirm BE-RF4

XL5 2A 5

XL5 dressing 6

XL5 1A testing 7

TWT driver 8

Components GYCOM Cooling System Oil Pumps/Filter Filament PS Core Bias PS Primary Power Connections Control PCB, Sol PS, Vac PS, RF equippment HVPS, New place Flow Guards RF-Valve Courtesy: F. Peauger CEA Pulse Compressor Courtesy: GYCOM/I. Syratchev

Pulse Compressor (GYCOM) KM Schirm BE-RF 10

CLIC WS 10/2009 KM Schirm BE-RF 11

LL-RF Collaboration Meeting 01/2009 KM Schirm BE-RF12

Flanges CLIC WS 10/2009 KM Schirm BE-RF 13

Conclusion  Delays in the supply of modulator, some RF network components and installation (due to fire)  Klystron performance promising  Pulse Compressor needs additional effort  Installation will proceed in 3 phases: Power source commissioning - RF network comm. – Test Stand comm. 14