INDIAN RAILWAY VISION 2020. CAPACITY CREATION BY 2020 1.More than 30,000 kms of route would be double / multiple lines (compare to around 18,000 kms today).

Slides:



Advertisements
Similar presentations
BEST PROCUREMENT PRACTICES ON INDIAN RAILWAYS BY M. P. JUNEJA ADDL
Advertisements

Transport RAIL Isabelle Vandoorne Brussels, 29 November 2012 TEN-T 2012 calls info day.
Roles and Responsibilities. Collaborative Efforts to Improve Student Achievement Guidelines for developing integrated planning and decision making processes.
Securing a safe, sustainable rail network Michael Roberts Chief Executive.
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
Indian Railways Update 10 th IHHA Conference 2013 New Delhi.
Blue print for throughput enhancement on HDN B.V.L.Narayana SPTM/ RSC/ BRC.
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
Meeting AECOM, AM SOP-T, CFR, JASPERS
The Process of Including Pan-European Corridor X (Xa) in the Rail Freight Corridor Network (in Line with Regulation 913/2010/EU)
IR-UIC-GRFC-22/ DELHI DO NOT USE WITHOUT PERMISSION OF AUTHOR AND IR 1 INTRODUCTION OF HEAVY AXLE LOAD OPERATION ON INDIAN RAILWAYS PresentationBy.
Workshop on Infrastructures Key research to solve mobility barriers Claude Dumoulin Bouygues Travaux Publics (France) reFINE core team Industrial Technologies.
Use of Working Titles Broad unit authority with periodic central HR/unit review Used in directories, verification of work and business cards Working Title.
Rolling Stock requirements
8th Meeting of the Working Group for the improvement of border crossings along the Pan-European Corridor X Belgrade, Republic of Serbia
Increasing the Quality of Public Transport in Prague Prague Integrated Transport.
WORKING DRAFT Last Modified 3/4/2014 1:23 AM India Standard Time Printed 26/01/ :36 India Standard Time Opportunity for PPP in India McKinsey study.
Public Private Partnership in Ports By A.K. Mohapatra Secretary Department of Shipping.
 PPP Projects ◦ Re structuring of Brownfield Airports (Delhi & Mumbai Airports) ◦ Greenfield Airports (Hyderabad & Bangalore Airports)  AAI Projects.
The European Railway Agency in development
AFROSAI-E COOPERATION WITH WGITA African Organisation of English-speaking Supreme Audit Institutions.
By Jan Swier and Ted Slump, ProRail, The Netherlands
Trans-European Transport Network and the Connecting Europe Facility
1 AfDB’S SUPPORT FOR ROAD SAFETY ACTIVITIES IN AFRICA AfDB’S SUPPORT FOR ROAD SAFETY ACTIVITIES IN AFRICA 3 rd AFRICAN ROAD SAFETY CONFERENCE Zerfu Tessema,
HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.
Participatory Audit and Planning (PAP) Process A tool for monitoring and ensuring “Decentralized planning’’ in utilization of Hospital Management Committee.
College of Engineering Trikaripur Cheemeni, Kasaragode Technical Education Quality Improvement Program-Phase II 7 th Review Meeting.
The variable cost approach to pricing John Thomas Deputy Director, Economic Regulation Office of Rail Regulation, UK 9 July 2004.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
INDIA’S INFRASTRUCTURE – Issues and Prospects PRESENTATION BY SS Kohli Chairman & Managing Director INDIA INFRASTRUCTURE FINANCE COMPANY LTD NEW DELHI.
High-Speed Intercity Passenger Rail Program March 14, 2011 Federal Railroad Administration.
1 1 BRANCH: CORPORATE AFFAIRS 1. CORPORATE MANAGEMENT SERVICES To provide financial and strategic support services that enhance service delivery by the.
1 Public Private Participation in Education Dr. Kumud Bansal UPAAM Lucknow 23 rd June 2010.
TEST TRACK FOR INDIAN RAILWAYS
IT Applications in Freight business B.V.L.Narayana RSC/BRC.
N° 1 The European railway Agency: an engine for the integrated railway area EFRTC, Vilamoura on June 24 TH 2005 Olivier PIRON 24 June 2005.
THE PORTUGUESE EXPERIENCE WITH “EU” FUNDING MECHANISMS.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
“Support to Local Government Units for More Effective & Accountable Public Financial Management” DCI-ASIE/2010/ PDF Working Group on Decentralization.
Serbian Railways – “The Start of our Future” Belgrade, 16/04/2015.
Rapid Review of Conservation Trust Funds IUCN World Conservation Congress Barcelona, October 7, 2008 Melissa Moye Director, Conservation Finance, WWF
PWP / LAW Book Short Comings & System Improvement.
A TURN AROUND STORY LEADING CHANGE ANDTRANSFORMATION INDIAN RAILWAYS Presentation for Japan-India PPP Seminar, New Delhi (organized by NCAER) 14 th February,
Transport Enhancing TEN-T funding Pawel Stelmaszczyk Special Envoy for European Mobility Network DG MOVE Warsaw, 18 December 2013.
Transport The new TEN-T guidelines Results of the legislative procedure Philippe Chantraine (MOVE B1), 24 June 2013.
Indian Road Construction. ROAD TRANSPORT SCENARIO Economic Growth : 5 - 6% Road Transport Sector Demand Grows at 10 – 12% Need for Road & Transport Infrastructure.
DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES
Railway Infrastructure Financing and PPPs November 2015.
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
CRS SANCTIONS Chetan Bakshi, CRS/Central. WHY CRS SANCTION IS REQUIRED ? Section 21 & 22 of Railway Act 1989 stipulates that “ No Railway should be opened.
INDIAN RAILWAYS  I. Rly. Vision for Next 10 Years  Opportunities for International Partners A Presentation by – Mr. Arbind Kumar Director (Projects)
Restructuring of the Finnish Infrastructure Administration Draft
INFRASTRUCTURE DEVELOPMENT CONSULTANTS Review of the East Africa Railways Master Plan Peter Kieran CPCS Transcom Limited March 11, 2010.
1 ERFA Annual Event Brussels, Welcome. Irmtraut Tonndorf ERFA Chair.
Why 50 % in Group ‘A’ Posts?. Presentation from NRPOA By- RAM KISHORE President.
RAIL BALTICA RIGA STATION – ASPIRATION FOR THE FUTURE
Presentation to the Portfolio Committee on Energy
Public Conference December
NRHM Guidelines on Fund Flows and Banking Arrangements
Qualification Criteria and Available Tender Capacity
NRHM Guidelines on Fund Flows and Banking Arrangements
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
Working Title Guidelines
By Jeff Burklo, Director
THE TRANSPORT (SCOTLAND) BILL 2018
Human resource and Work flow of the Research Office, RUPP
AFROSAI-E COOPeRATION WITH WGITA
OP Integrated infrastructure 2014 – 2020
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
Life Cycle Costing.
Presentation transcript:

INDIAN RAILWAY VISION 2020

CAPACITY CREATION BY More than 30,000 kms of route would be double / multiple lines (compare to around 18,000 kms today). Of this, more than 6,000 kms would be quadrupled lines with segregation of passenger and freight services into separate double-line corridors. This shall include Delhi-Kolkata, Delhi-Mumbai, Kolkata-Mumbai and Delhi- Chennai routes on which Dedicated Freight Corridors would come. - Contd…

CAPACITY CREATION BY Maximum speed of passenger trains would be raised from 110 or 130 kmph at present to kmph on these segregated routes and, similarly, maximum speed of freight trains would be raised from kmph to over 100 kmph. The gap between maximum and average speeds of both passenger and freight trains will be minimized. - Contd…

CAPACITY CREATION BY Gauge conversion programme would be completed. The entire network (barring the hill and heritage railways) would be in Broad Gauge. 4.33,000 kms of routes would be electrified (i.e. additional electrification of 14,000 kms in 10 years).

HIGH SPEED RAIL TRAVEL 1.The vision aims at raising the speed of regular passenger trains to kmph on segregated routes, which will bring about a major transformation in train travel. 2.At least 4 high speed rail projects to provide bullet train services at kmph.

HIGH SPEED RAIL TRAVEL 3.Six corridors have already been identified for technical studies on setting up High Speed Rail Corridors. These are: i. Delhi-Chandigarh-Amritsar; ii. Pune-Mumbai-Ahmedabad; iii. Hyderabad-Dronakal-Vijaywada-Chennai; iv. Howrah-Haldia; v. Chennai-Banglore-Coimbatore-Ernakulam; vi. Delhi-Agra-Lucknow-Varanasi-Patna

WORLD CLASS STATIONS & DEVELOPMENT OF LARGE STATIONS 50 stations will be developed as World Class Station. In addition, at least 200 large stations would be developed to provide multifarious facilities like offices, retail, entertainment, restaurants, theatres, hotels and health and educational services.

METHODOLOGY OF ACHIEVING INFRASTRUCTURE DEVELOPMENT High Speed Rail Corridor (Bullet Train), World Class Station and Multifarious facilities will be achieved through PPP. Other Project / Works to be done by Railways.

INVESTMENT FOR VISION Total investment will be Rs. 14 Lacs Crore. Out of which Rs Lacs Crore will be on Civil Engineering Infrastructure. Rs. 9 Lacs Crore will be mobilized by Railway through surpluses from high growth in freight & passenger traffic, supported by borrowing and use of PPP. Central Govt. to set up an Accelerated Rail Development Fund (ARDF) to finance remaining Rs. 5 Lacs Crore.

PROPOSED INVESTMENT ON INFRASTRUCTURE 1.Bottleneck removal works – Traffic facility, Bypass, Terminal Works, Speed Raising 48,000 2.New Line, Doubling, Tripling, Quadrupling (Including DFC), Gauge Conversion, MTP 4,05,450 3.World Class Stations & MFCs, Adarsh Stations91,000 4.Track Renewal & 25 t Axle Load and Bridges79,405 5.High Speed Corridor2,00,000 Total8,23,855 6.Cost to complete 109 New Lines, 51 Gauge Conversion & 126 Doubling ongoing projects. 79,462 (Cr. of Rs.)

PROPOSED DOUBLING, GAUGE CONVERSION & NEW LINE PROJECTS Plan HeadShort Term Targets (upto 2012) Long Term Targets Total Targets Doubling1000 kms11000 kms12000 kms Gauge Conversion 2500 kms9500 kms12000 kms New Line1000 kms24000 kms25000 kms Total4500 kms44500 kms49000 kms

RESOURCES REQUIREMENT IN FUTURE ItemPresent availabilityFuture Requirement Rails 60 Kg7 Lacs MT12 Lacs MT PRC sleepers91 Lacs sleepers150 Lacs sleepers Track Fastenings, Switches, Crossings etc Enhance capacity by % over and above the present. Ballast150 Lacs cum250 Lacs cum Track Machines 578 Track Machines 2284 track machines complimentary rolling stock Supervisors (with 4044 vacancies) for Engineering only Officers 90 SAG in construction 80+90=170 SAG for Const. units and Authorities 160 JAG/SS for Authorities

Annual increase is slated to increase from the present levels of Rs. 20,000 Crores to approx Rs. 50,000 Crores. Role of Finance: The role of finance in a project organization should be redefined. Rigorous financial examination is required while approving the project and sanctioning the detailed estimate. Thereafter expenditure will be done by executives as per provision in the detailed estimate. - Contd… PROJECT EXECUTION METHODOLOGY

Tender Evaluation System: This will be modified to a system in which the price is not the only consideration, but the technical competence and capability of the tenderer is given due weightage. PROJECT EXECUTION METHODOLOGY

Independent authority headed by engineering officer (reporting to ME) will be set up in 4 metropolitan cities i.e. Delhi, Kolkata, Chennai & Mumbai. The authority will be headed by a Chairman and supported by Members below him and other SAG level official under them, with field units. A total of 40 officers would be required to man the HQ of the 4 Authorities proposed, with another about officers in SAG and JAG/Senior Scale working in the PIUs. - Contd… ORGANISATIONAL STRUCTURE

The thin team of Authority would have not more than 3 tiers and, would be supported by outsourced staff in the areas required for the projects. The Project Implementation Units (PIU) would be spread over the geographical beat of the Authority to supervise the execution of the projects. PIUs will have officials in 2-3 tiers for supervising the projects. For closer monitoring and supervision, each SAG officer would have a work load of approximately kms to oversee. - Contd… ORGANISATIONAL STRUCTURE

For coordinating between the Authorities and assisting the Board (ME) in overseeing the working of the Authorities, the post of an Additional Member (Projects) would be revived in the Railway Board. The Authorities would be allowed to evolve and develop their own procedures and delegations of powers founded on efficiency, speed of decision making, transparency, accountability and financial discipline. Timely execution of projects in the allowed time would be the mission of the Authority. ORGANISATIONAL STRUCTURE