Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Office of Surface Mining Reclamation and Enforcement
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
Coal Mining Activities Mark A. Taylor Huntington District Corps of Engineers.
Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
A TECHNICAL REVIEW OF THE NAS FINAL REPORT ON CCB PLACEMENT AT COAL MINES KIMERY C VORIES OFFICE OF SURFACE MINING.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
<<Date>><<SDLC Phase>>
The Compact  Legally enforceable contract among the Great Lakes States  Provided for in the U.S. Constitution  Ratification by State legislatures 
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
1 Wetland and Riparian Protection Resolution. 2 Wetland Policy Development Team State Water Board Staff: Val Connor Bill Orme Cliff Harvey San Francisco.
DMME RAP Meeting September 24, EIA Regulation – Outline 9VAC15-20 “Guidelines for the Preparation of Environmental Impact Assessments for Oil or.
Bob Evans, Director Lexington Field Office Office of Surface Mining Reclamation & Enforcement.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy.
OSM CCB Placement in Coal Mines - Proposed Rulemaking John R. Craynon, P.E. Chief, Division of Regulatory Support Office of Surface Mining Reclamation.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Instructore: Tasneem Darwish1 University of Palestine Faculty of Applied Engineering and Urban Planning Software Engineering Department Requirement engineering.
Hazards Risk Management Course Revision Project Update George Haddow June 2012.
Indiana Student Achievement Institute InSAI STEERING TEAM TRAINING Selecting the Areas of Concern Document
Water Supply Planning Initiative State Water Commission November 22, 2004.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Programmatic Regulations PDT Workshop COMPREHENSIVE EVERGLADES RESTORATION PLAN April 18, 2002.
VI. Developing a VSMP Program General Stormwater Training Workshop.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Development of a Common Effects Methodology for OW and OPP EPA Development Team Office of Pesticide Programs Office of Water Office of Research and Development.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First Regional Workshop, Tunis January Cross-cutting issues to.
SEA in the Czech Republic Prague, 24 September 2008.
ECOS Information Session Draft EPA Quality Documents February 13, 2013 Presented by EPA Quality Staff, Office of Environmental Information For meeting.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Oakdale Irrigation District Agricultural Water Management Plan Briefing on 2015 Update January 5, /5/2016 OID AWMP Update Briefing.
UNDP Guidance for National Communication Project Proposals UNFCCC Workshop on the Preparation of National Communications from non-Annex I Parties Manila,
Manure Wastewater Handling & Storage Summary CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
Creating the environment for business Streamlining industrial emissions legislation Caspar Corden (Entec) Andrew Farmer (IEEP) IPPC Review Advisory Group.
Proposed Topics for Application of Sediment Quality Objectives.
Outlines Overview Defining the Vision Through Business Requirements
NYS Department of Environmental Conservation Flow Standard Amendment to New York’s Water Quality Standards Regulations Scott J. Stoner Chief, Standards.
Middle Fork Project Relicensing Process Plan April 25, 2006.
Cumulative Hydrologic Impact Assessment. Quality Assurance \ Quality Control Panel.
Regional Implementation of the Proposed Specific Learning Difficulties (SpLD) Support Model For Primary and Post Primary Schools 07/06/20161.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
Panel on Challenges and Opportunities of Treatment, Beneficial Use and Management of CBM Produced Water The Regulatory Environment John A. Veil Argonne.
Restoration and Regulation Discussion
Nunavut Water Board Public Hearing
Restoration and Regulation Discussion
Coal Mining Activities
Office of Nuclear Materials Safety and Safeguards
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Coal Mining Activities
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
7c-Draft Guidance on Water Balances
Julie Woosley, Division of Waste Management
John Tinger U.S. EPA Region IX
Environmental Impact Assessment (EIA) in New Brunswick
The Commission Communication on implementation (COM (2012) 95) in relation to Water Industry Directives (Urban Waste Water Treatment, Drinking Water,
Monitoring Guidance Johannes Grath Rob Ward 12th October 2005.
NERC Reliability Standards Development Plan
Exceptional and Natural Events Rulemaking
Greater Kaweah GSA Board Meeting
Salt/Nutrient Management Plans
NERC Reliability Standards Development Plan
Technical Advisory Committee
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Restoration and Regulation Discussion
Water Quality Planning Division Monitoring & Assessment Section
Presentation transcript:

Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois

Topics: What is the PHC/CHIA reference document? Background into the development of the document Contents

What is the PHC/CHIA reference document?

DRAFT Technical reference for the MCR Hydrologic Considerations for Permitting and Liability Release Probable Hydrologic Consequences (PHC) Determination Cumulative Hydrologic Impact Assessment (CHIA) Post-Mining Hydrologic Assessment (PHA) Distributed by the Mid-Continent Technology Development and Transfer Team

Purpose of the document: To provide a systematic approach within the MCR for the review and development of PHCs & CHIAs Insight into the regulatory basis for bond release and post-reclamation hydrologic balance Authors of the document: Brian Hicks, OSM-MCR Wayne VanBuren, ADEQ Timothy Walter, TX RRC Deborah Dale, OSM-MCR

Background into the development of the guidance document

Milestones in the Development of PHC/CHIA Guidance Documents May 1980 The Determination of Probable Hydrologic Consequences and The Statement of the Results of Test Borings or Core Sampling

Milestones in the Development of PHC/CHIA Guidance Documents December 1985 DRAFT Guidelines for Preparation of a Probable Hydrologic Consequences Determination (PHC) DRAFT Guidelines for Preparation of a Cumulative Hydrologic Impact Assessment (CHIA) DRAFT Appendices to PHC and CHIA Guidelines Documents

Milestones in the Development of PHC/CHIA Guidance Documents January 1997 DRAFT Managing Hydrologic Information: A Resource for Development of Probable Hydrologic Consequences (PHC) and Cumulative Hydrologic Impact Assessment (CHIA)

Milestones in the Development of PHC/CHIA Guidance Documents August 1999 OSM’s Hydrologic Issues Team releases to the states for review and comment a Phase I guidance document for baseline data (draft) April 2001 Hydrologic Issues Team meets with states to review a draft outline for a Phase II guidance document for writing PHCs and CHIAs (Austin)

Milestones in the Development of PHC/CHIA Guidance Documents Following the Austin meeting, several states raised concerns through the Interstate Mining Compact Commission (IMCC) about OSM’s proposed approach A main concern was that the preparation of any guidance document would carry a requirement for mandatory use rather than discretionary use

Milestones in the Development of PHC/CHIA Guidance Documents The IMCC and the Western Interstate Energy Board (WIEB) requested, and OSM agreed, to defer additional work on Phase II PHC/CHIA guidance until a State-Federal workshop on this subject could be held and the results assessed. March 2002 Intergovernmental Benchmarking Workshop on PHC/CHIAs (New Orleans)

Milestones in the Development of PHC/CHIA Guidance Documents (57) topics relating to PHC/CHIA permitting hydrology (either concerns, issues or merely areas of interest) were identified during the course of the workshop

Milestones in the Development of PHC/CHIA Guidance Documents January 2006 Draft Methodology for Review and Preparation of PHC Determinations and CHIAs in the Mid-Continent Region

Technical Reference for the Mid-Continent Region: Draft Technical Reference for the Mid-Continent Region: Hydrologic Considerations for Permitting and Liability Release Probable Hydrologic Consequences (PHC) Determination Cumulative Hydrologic Impact Assessment (CHIA) Post-Mining Hydrologic Assessment (PHA) Distributed by the Mid-Continent Technology Development and Transfer Team September 2006

Hydrologic Considerations for Permitting and Liability Release Probable Hydrologic Consequences (PHC) Determination Cumulative Hydrologic Impact Assessment (CHIA) Post-Mining Hydrologic Assessment (PHA)

This guidance document has (4) main sections: Probable Hydrologic Consequence (PHC) Hydrologic Reclamation Plan (HRP) Cumulative Hydrologic Impact Assessment (CHIA) Post-Mining Hydrologic Assessment (PHA)

Probable Hydrologic Consequences (PHC) Determination Addresses the anticipated effects of the planned mining and reclamation on the quality/quantity of sw and gw systems Overburden properties Describe and characterize the subsurface strata Determine if AFM are present

PHC - Disposal/storage operations Spoil Coal processing waste Non-coal waste Coal combustion byproducts

PHC - Erosion and sediment control

PHC - Mining methods

PHC - Coal-bed methane recovery

Hydrologic Reclamation Plan (HRP) Detailed description of how to: Minimize impacts to sw & gw systems within and adjacent to the permit area; and Prevent material damage outside the permit area *HRP must include mitigation plans for hydrologic impacts - BTCA HRP Elements: AMD generation Controlled placement of overburden Water management Mitigation options

HRP Elements (continued): Non-acidic mine drainage High TDS (i.e. sulfates, chlorides) Increased sediment loading SW and GW monitoring Recharge capacity Disposal activities

HRP Elements (continued): Water supply replacement

Cumulative Hydrologic Impact Assessment (CHIA) a.k.a. the Chia Pet

Cumulative Hydrologic Impact Assessment (CHIA) An assessment of the probable cumulative impacts of all anticipated mining in an area to assure the operation has been designed to prevent material damage to the hydrologic balance outside the permit area

Cumulative Hydrologic Impact Assessment (CHIA) An assessment of the probable cumulative impacts of all anticipated mining in an area to assure the operation has been designed to prevent material damage to the hydrologic balance outside the permit area Hydrologic balance: Relationship between the quality/quantity of water flowing into, stored within, and discharging from a unit (i.e. drainage basin, aquifer, lake, etc.)

Highlights of the CHIA section: When is a CHIA required? Relationship between PHC and CHIA Prospective mining operations + all existing operations “Anticipated mining” (30 CFR 701.5 “cumulative impact area”)

Highlights of the CHIA section (continued): Cumulative Impact Area (CIA) Definition of the CIA Qualitative delineation of the CIA (sw and gw)

Highlights of the CHIA section (continued): Cumulative Impact Area (CIA) Definition of the CIA Qualitative delineation of the CIA (sw and gw) Quantitative check of the working CIA Criteria for evaluating Baseline conditions Identification of hydrologic concerns Water quantity issues Changes in water quality

Highlights of the CHIA section (continued): Material damage Definition (from previous draft CHIA guidelines, OSM 1985, 1997); examples Functions of material damage criteria (standards, enforcement) Methods for analysis of cumulative hydrologic impacts Statement of findings

Post-Mining Hydrologic Assessment (PHA) Regulatory basis for release of performance bonds Post-reclamation hydrologic balance

Appendices: Appendix A: Glossary of water-related words, 153 p Appendix B: Outline of suggested minimum requirements for PHCs Appendix C: Outline of suggested minimum requirements for HRPs Appendix D: Outline of suggested minimum requirements for CHIAs Appendix E: Outline of suggested minimum requirements for PHAs Appendix F: Resources for processes/tools for determining impacts, 17 p (databases, software, training, etc.)