2008 Subsurface 3D Modeling: An Application to Waterfront Project Planning and Site Evaluation Andrew S. Thomas Moffatt & Nichol 600 University St, Ste.

Slides:



Advertisements
Similar presentations
Obstruction Surveys and Airport Airspace Analysis
Advertisements

The Minnesota State Historic Preservation Office & 106 Reviews
Geographic Information Systems “GIS”
Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Boring Logs and Databases Using gINT Software Scott Sochar Engineering Geologist Project Geology / DOE.
Problem Statement Key Project Requirements Input Page Schedule & Resources Output Page System Testing Conclusion The general problem lies with residents.
Design Parameters.
Sustainable development of inland waterways transport Tamás Marton – Ministry of Transport, Communications and Energy – Hungary
Earthwork for Designers. What needs to get done first? Request Conventional/Photometric Survey Preliminary Plans - should be prepared once horizontal.
3D and Surface/Terrain Analysis
Getting the Big Picture How to Look at Your Watershed Indiana Watershed Planning Guide,
FIGURE 15-1 Simplified cross section developed from site and subsurface characterization.
We have tested the accuracy of borehole temperature profiles in tracking surface air temperatures on short timescales (< 20 y) by direct comparison of.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Geographic Information Business and Interoperability: The Future of GIS Andrew U. Frank Geoinfo TU Vienna overheads available.
Creating Business Impact | Providing Expert Solutions | Delivering Quality Consistently | Building Partnerships Globally Presented by: Vidyalankar Nidamarthy.
Boring Logs and Databases Using gINT Software
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Chapter Three Chapter Three.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
Morphum Environmental Ltd Environmental Engineers and Consultants
© Prentice Hall, Modern Management 9 th edition.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Mitigation in the Section 106 Process Dave Berwick Army Program Manager Advisory Council on Historic Preservation.
Site Investigation and Storage Structure Sizing CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
Major parts of ArcGIS ArcView -Basic mapping, editing and Analysis tools ArcEditor -all of ArcView plus Adds ability to deal with topological and network.
Tools for Understanding Relationships in Resilience Interventions.
TRANSPORTATION ENGINEERING Planes, Trains, Automobiles and More Location Date.
Wendy Welch ADAPTING THE ARC HYDRO DATA MODEL AND TOOLS TO A HYDROGEOLOGIC FRAMEWORK KITSAP PENINSULA, KITSAP, MASON AND PIERCE COUNTIES, WASHINGTON.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Geotechnical Exploration for Reach 2B of the San Joaquin River Restoration Program Nicholas Hightower Division of Engineering, Project Geology 2011 DWR.
On visible choice set and scope sensitivity: - Dealing with the impact of study design on the scope sensitivity Improving the Practice of Benefit Transfer:
DigitalTerrainModelling: 1 Digital Terrain Model also known as –digital ground model (DGM) & –digital height model (DHM) a method of representing the.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Nadine Peterson Preservation Planner NH Division of Historical Resources Lynne E. Monroe Preservation Company Christopher W. Closs Christopher W. Closs.
RECONCILING THE VALUE ESTIMATES Chapter 15. Consistency Evaluate the approaches Evaluate the data Range of values Reconciliation Rounding the answer Significant.
Stratigraphy Understanding site deposits. Reading the Layers.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Teaching the Geological Subsurface using 3D ModelsTeaching the Geological Subsurface using 3D Models Steve Thorpe & Emma Ward
3D Technology and the Section 106 Process Matt Diederich Archaeologist Oregon State Historic Preservation Office (SHPO) Oregon Heritage Programs Division.
Environmental Toolbox. Technical Module Introduction.
Group 6 Application GPS and GIS in agricultural field.
What is a map? Civil Drafting?
1 of 27 The EPA 7-Step DQO Process Step 5 - Define Decision Rules (15 minutes) Presenter: Sebastian Tindall Day 2 DQO Training Course Module 5.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Private Sector  Buildings and structures built for ordinary people.
Mineral Exploration Tel: (07) Fax: (07)
Demand Forecast Deviations Working Group Presented to: Stakeholder Advisory Committee Presented by: Pat Doran January 24, 2007.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
A Framework and Methods for Characterizing Uncertainty in Geologic Maps Donald A. Keefer Illinois State Geological Survey.
The Site Landscaping Chapter 4. Objectives*  Define the word site and explain its significance in the development of a landscape  List the typical features.
The Pipeline Safety Trust “Restoring Trust In Pipeline Safety” New Orleans, LA November 2-3, 2006 Nate Muehl Damage Prevention & ROW Relations Manager.
SaMeHFor Egyptian Cement Company1 2. Digital Terrain Models Dr. SaMeH Saadeldin Ahmed Assistant professor of Mining and Environmental Engineering
World Geography Chapter 1. The Study of Geography Section 1.
Development of Decision Support Tools for brownfields and contaminated sites management and redevelopment [Bezama, A.; Navia, R.; Novak, J. & Lorber, K.
SITE INVESTIGATION ARUN MUCHHALA ENGINEERING COLLEGE-DHARI
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
EBS101 ENGINEERING GEOLOGY DR HAREYANI ZABIDI
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
Figure 1 General Project Location
Placer County Water Agency Middle Fork American River Project FERC Project No February 26, 2008.
Marcellus Well Pad Constructability
Class Project Guidelines
Layout: Introduction. About the Project. Study area.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION
Presentation transcript:

2008 Subsurface 3D Modeling: An Application to Waterfront Project Planning and Site Evaluation Andrew S. Thomas Moffatt & Nichol 600 University St, Ste 610 Seattle, WA T (206) F (206)

2008 INTRODUCTION Background / Significance Site Definition Subsurface 3D Models – –Data Input – –Applications – –Sample Simulation Conclusions

2008 Why is it important to know what lies beneath a project site? Why is it important to know what lies beneath a project site? How do subsurface conditions relate to the waterborne transportation industry? How do subsurface conditions relate to the waterborne transportation industry?

2008 Bodies of water have always provided a means of life

2008 Archaeological discoveries are common near the waterfront Archaeological discoveries are common near the waterfront

2008 Archaeological discoveries can be exciting and devastating at the same time Archaeological discoveries can be exciting and devastating at the same time Unanticipated finds can be costly to a project Unanticipated finds can be costly to a project Archaeological Investigation Construction on schedule

2008 The waterborne transportation industry is vital in maintaining and improving the worlds economy The waterborne transportation industry is vital in maintaining and improving the worlds economy Industrys need for waterfront access points Industrys need for waterfront access points Waterfront sites have limited availability: Waterfront sites have limited availability: increasing development = decreasing availability

2008 Decreasing availability along the waterfront leads to increased consideration of a sites characteristics Decreasing availability along the waterfront leads to increased consideration of a sites characteristics Site history – early considerations Site history – early considerations –How will the development affect the site? –How will the site affect the development? –What lies beneath the site, and how can its arrangement be conveyed to those that need to know?

2008 Important to define and evaluate a sites Area of Potential Effects (APE) Important to define and evaluate a sites Area of Potential Effects (APE) 36 CFR Part 800 – Protection of Historic Properties Section (Definitions): Area of Potential Effects: The geographic area or areas within which an undertaking may directly or indirectly cause alterations in the character or use of historic properties, if any such properties exist. The area of potential effects is influenced by the scale and nature of the undertaking and may be different for different kinds of effects caused by the undertaking.

2008 -EXPERT INPUT -Aerial Photography -Historic Design Drawings -Geologic Profiles -Site Photographs -Predictive & GIS Maps Sources of data for physical representation of APE: Sources of data for physical representation of APE: -Survey Data -Environmental Studies -Concept Drawings -Project Reports Data is collectively reviewed by: Data is collectively reviewed by: Widespread data collection and review can be expensive and time-consuming; overall, data should be used effectively to justify the effort Widespread data collection and review can be expensive and time-consuming; overall, data should be used effectively to justify the effort -Owners -Engineers & Planners -Environmental Scientists -Archaeologists-Geologists-Geomorphologists -Cultural Resources Experts -Regulatory Agencies -Other Stakeholders

2008 Subsurface Layers - Fence Diagram Data display examples Data display examples Project Design - Plan & Section Drawings

2008 A subsurface 3D model provides a single display of: A subsurface 3D model provides a single display of: –An existing site and its subsurface layers –Historic excavations / impacts –Proposed construction impacts

2008 Key features: Key features: –A subsurface 3D model exhibits thousands of precise, physical survey points –3D models are interactive Users have the ability to rapidly zoom into or out of any point in the display Users have the ability to rapidly zoom into or out of any point in the display A user can navigate around a 3D model by orbiting the viewpoint so anything in the model can be seen from anywhere A user can navigate around a 3D model by orbiting the viewpoint so anything in the model can be seen from anywhere –Sections cuts and measurements can be taken during a viewing session –Uninhibited display allows interpolations between data points to be seen clearly at all times

2008 The accuracy of the model depends on the accuracy of the data collected The accuracy of the model depends on the accuracy of the data collected –Historic Excavations As-built drawings As-built drawings –Proposed Excavations Concept Drawings (Alternative Project Layouts) Concept Drawings (Alternative Project Layouts) Plan & Section Drawings Plan & Section Drawings –Existing Subterranean Conditions Project Report Graphs & Figures Project Report Graphs & Figures Geotechnical Boring Logs Geotechnical Boring Logs Stratigraphic Sections Stratigraphic Sections Archaeological Trench Profiles Archaeological Trench Profiles Topography - Survey Data / Contour Lines Topography - Survey Data / Contour Lines

2008 Survey Contour Lines Surface Display 3D Contour Lines Resultant Surface

2008 Available design drawings can be used to locate proposed and/or historic excavations in plan view Available design drawings can be used to locate proposed and/or historic excavations in plan view If section drawings and grading plans are not available, excavation depths can be estimated If section drawings and grading plans are not available, excavation depths can be estimated Once defined, excavations are cut into the 3D terrain Once defined, excavations are cut into the 3D terrain

2008 Borehole Data: basis for defining subsurface formations Borehole Data: basis for defining subsurface formations –Soil sample locations should be chosen appropriately –Layers can be initially identified by reviewing borehole/well logs

2008 Archaeological Trenches Archaeological Trenches –If archaeological remnants are suspected, a series of archaeological trenches are excavated and explored –Trench profiles can be reviewed to provide further subsurface definition (IE more points to combine with borehole data)

2008 With data points, a triangulated irregular network (TIN) is formed for each layer With data points, a triangulated irregular network (TIN) is formed for each layer

2008 Plan View Subterranean View Section Cut Cross Section

2008 Excavations from multiple alternatives can be compared in the same model Excavations from multiple alternatives can be compared in the same model Subterranean View – comparison of alternative utility layouts

2008 Some subsurface layers are more significant than others and require special consideration Some subsurface layers are more significant than others and require special consideration Example: Example: Borings and TIN lines for a subsurface layer

2008 Example continued Example continued Borings and TIN lines for a subsurface layer

2008 Example continued Example continued Borings and TIN lines for a subsurface layer

2008 Example – Final Definition of Layer Example – Final Definition of Layer Borings and TIN lines for a subsurface layer

2008 ~4 minutes, 30 seconds

2008 The application is a benefit to the waterborne transportation industry The application is a benefit to the waterborne transportation industry Provides a focal point for all interested parties to view a sites physical arrangement – proves a universal understanding among a group Provides a focal point for all interested parties to view a sites physical arrangement – proves a universal understanding among a group An interactive viewing section allows a user to navigate through the model An interactive viewing section allows a user to navigate through the model Maximizes effectiveness of data collected Maximizes effectiveness of data collected The waterfront is an integral part of the worlds economic infrustructure -its sites should be evaluated before commencing any undertakings that could alter its character or use The waterfront is an integral part of the worlds economic infrustructure -its sites should be evaluated before commencing any undertakings that could alter its character or use

2008 Questions?

2008