F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.

Slides:



Advertisements
Similar presentations
First Operation of MI8 Collimation Bruce C. Brown All Experimenters Meeting 22 January 2007.
Advertisements

Main Injector Gap clearing kickers Phil Adamson (#) AEM 14th March 2011.
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Collimation System for Beam Loss Localization with Slip Stacking Injection in the Fermilab Main Injector Bruce C. Brown Main Injector Department Accelerator.
1 Accelerator upgrades for NuMI Robert Zwaska Fermilab August 6, 2006 NBI 2006.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
SNuMI: Phase I & Phase II Nancy Grossman Phase I: $33.4M FY06$ (no contingency, no G&A) 41% contingency Phase II: $53.7M FY06$ (no contingency, no G&A)
Commissioning of the Fermilab Accelerators for NuMI Operation Robert Zwaska University of Texas at Austin NBI 2003 November 7, 2003.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
F Overview of the SuperNuMI Plan A. Marchionni, Fermilab AD/MID Accelerator Advisory Committee, May 10-12, 2006.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Beam Loss Simulation in the Main Injector at Slip-Stacking Injection A.I. Drozhdin, B.C. Brown, D.E. Johnson, I. Kourbanis, K. Seiya June 30, 2006 A.Drozhdin.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Proton Intensity Upgrades  Present operation of Main Injector and NuMI  NuMI designed for 400 kW, achieved a max beam power of 270 kW  Present Proton.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan Expectations Eric Prebys AD/Proton Source.
Proton Source Improvement Workshop Cogging W. Pellico Dec 6&
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Barrier RF Stacking Weiren Chou and Dave Wildman Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim, Germany,
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
MI Beam Loss upon Acceleration 5E11/div 11BLMA=LM GeV/c 9.8GeV/c Start of Ramp Fast loss ~10 ms Slow loss.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Slip stacking in Recycler Ioanis Kourbanis 9/14/11.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
Status and prospects of VEPP-5 Injection Complex
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

f MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008

f HB2008 – I. Kourbanis Outline  Fermilab Accelerator complex and MI operations  Status of the 400KW operation  Future Plans  Conclusions 2

f Fermilab Accelerators HB2008 – I. Kourbanis 3

f MI mixed mode operations Numi target (MINOS Neutrino experiment) Pbar target (Anti proton production) Main Injector (h=588) Booster (h=84) Tevatron Bucket # operation Numi Pbar Numi Pbar 11 batches 7 batches operation HB2008 – I. Kourbanis 4

f 5 The Main Injector Today (Mixed Mode) (Double) Batch 1 (PBar) Batch 2 (Double) Batch 3 (Double) Batch 4 (Double) Batch 5 (Double) Batch 6 (Single) Booster Main Injector Provides high power, 120 GeV proton beam Takes 11 batches from the 8 GeV 15 Hz –4-5 × protons per Booster batch Total cycle time ≥ 1.4 s + batches/15 NuMI HB2008 – I. Kourbanis 5

f Evolution of MI Beam Power HB2008 – I. Kourbanis Last Years’ Conditions Two-batch slip- stacking in MI Proton Plan (Current conditions) Multi-batch slip-stacking in MI NO A Multi-batch slip- stacking in Recycler Booster intensity (protons/batch) × ×10 12 No. Booster batches MI cycle time (s) MI intensity (ppp) 3.3× × ×10 13 To anti-proton source (ppp) 8.8× × To NuMI (ppp) 2.45× × ×10 13 NuMI beam power (kW) 192 (263)320 (400)700 PoT/yr to NuMI 2× × ×

f MI 400KW Operation  Since Jan. 08 we have switched to multi-batch slip stacking increasing the number of Booster batches in MI to 11.  We are gradually increasing the beam intensity as we addressing the issues with beam loss.  The allowable 5% loss happens mostly at 8 GeV corresponding to an average power loss of 1.5 KW or 0.5 W/m.  The beam losses are not evenly distributed but are mostly localized and need to be controlled.  Most of the losses are coming from the slip stacking process  Injection kicker gap loss  Un-captured beam loss  Extraction kicker gap loss HB2008 – I. Kourbanis 7

f Recapture with 1MV rf Slipping with 100kV rf 11 batch Slip stacking Frequency B Frequency A Intensity RF voltage  f = 1425Hz HB2008 – I. Kourbanis 8

f Numi (9)Pbar (2) 11  sec (1 revolution) Mountain Range Picture of 11 Batch slip stacking Time HB2008 – I. Kourbanis 9

f MeV -40MeV 0588 buckets Longitudinal simulation for 11 batch slip stacking Simulation Code developed by K. Seiya

f Un-Captured beam Loss +200MeV -800MeV buckets After accelerationBefore acceleration Some of the beam that spilled out during slip stacking is never captured and gets lost early during acceleration. This loss is concentrated at the high dispersion points and at the injection/extraction magnets (Lambertsons). MI collimators have being built to address this loss HB2008 – I. Kourbanis 11

f MI Collimators  Define momentum aperture using primary collimator (.25 mm W) placed in regular cell with normal dispersion.  Capture scattered beam in massive (20ton) steel blocks to control radiation.  Cover aisle side and ends with marble.  Add masks for out- scatter and tails. HB2008 – I. Kourbanis 12

f MI loss plot and Collimator efficiency Injection Region Extraction to Pbar Target HB2008 – I. Kourbanis 13

f Injection Kicker Gap Loss HB2008 – I. Kourbanis  During the injections of the second group there is beam accumulated in the injection kicker gap.  Some of this beam come from the deceleration and some from the beating of the two rf frequencies.  This loss is localized at the injection region.  In order to dress this problem gap clearing kickers are to be built that will be fired before the injection kickers and send the beam left in the gap in the MI abort. Gap Clearing kicker prototype Beam in the injection kicker Gap 14

f Extraction kicker gap loss (1) Wall current monitor extraction Some of the spilled beam is captured in buckets between the pbar batch and the the NuMI group of batches.This beam gets accelerated to 120 GeV and gets kicked out by the pbar extraction kicker. Pbar Batch HB2008 – I. Kourbanis 15

f Extraction kicker gap loss(2) 588 buckets With Anti-damping Without Anti-damping The bunch by bunch MI transverse damper is used to reduce the beam in the extraction kicker gap for the pbar batch.  The damper is used to anti-damp the beam around the pbar batch.  Since the damper is limited in voltage the anti-damping is most effective at low energies.  We are working to increase the damping power by adding another kicker. HB2008 – I. Kourbanis 16

f Properties of the Injected Beam Longitudinal phase tomography with measurement results 3.44E12 ppp1.77E12 ppp2.65E12 ppp  +/-1.47nsec  p/p: +/-6.88MeV +/-1.68nsec +/-7.62MeV +/-1.78nsec +/-8.99MeV +40MeV -40MeV nsecc +9nsecc The injected beam properties depend on the Booster Beam Intensity HB2008 – I. Kourbanis 17

f Comparison between measurements and Simulation Injection kicker gap loss & Ramp lossExtraction kicker gap loss HB2008 – I. Kourbanis 18

f Status of the 400KW Operation  The MI collimators were installed and have been commissioned.  Since January 08 when we switched to multi-batch slip stacking the MI beam intensity to the NuMI target has been increased by 30%. The overall MI beam power at 120 GeV has reached 340 KW; 85% of the design goal of 400KW.  We have demonstrated that MI can run at the high intensity required for 400KW.  Currently the injection kicker gap loss prevents us from further increasing the beam intensity.  The gap clearing kickers will be ready for installation in MI in April 09. HB2008 – I. Kourbanis 19

f MI Beam Intensity and Power HB2008 – I. Kourbanis Injected beam Kicker gap loss Beam Intensity 20

f MI Record Intensity HB2008 – I. Kourbanis 4.63E13 Protons to MI abort at 120 GeV. 92% Efficiency 21

f Weekly protons to NuMI Target HB2008 – I. Kourbanis Switched to multi-batch slip stacking 22

f MI Downtime  From January1, 2008 to June 2, 2008 the total MI downtime was Hrs, i.e 3.8% of the total time.  The biggest source for downtime was the MI RF.  The rf requirements are larger because of the amount of the beam- loading compensation required during slip stacking and the amount of beam that is accelerated. HB2008 – I. Kourbanis 23

f  When Collider program concludes, use the Recycler as a proton pre- injector  Use the Recycler to accumulate protons from the Booster while MI is accelerating  Can save 0.4 s for each 6 Booster batches injected  Recycler momentum aperture is large enough to allow slip-stacking operation in Recycler, for up to 12 Booster batches injected – 6 batches are slipped with respect to the other 6 and, at the time they line up, they are extracted to MI in a single turn and there re-captured and accelerated – Main Injector will run at its design acceler- ation rate of 240 GeV/s (1.3s cycle time) (operates at 204 GeV/s presently) – 4.3×10 12 p/batch, 95% slip-stacking efficiency – 4.9×10 13 ppp at 120 GeV every s  700 kW Future Plans: 700 kW for NOvA HB2008 – I. Kourbanis 24

f HB2008 – I. Kourbanis Recycler Ring, RR New injection line into RR New extraction line from RR New 53 MHz RF system New low level RF system Main Injector Two additional 53 MHz cavities (total 20 instead of 18) Quad Power Supply Upgrade NuMI Change to medium energy beam configuration (new target) Cooling & power supply upgrades Main Injector & Recycler NuMI Tunnel Booster Ring LINAC Main Accelerator Upgrades 25

f MI Ramp HB2008 – I. Kourbanis 26

f Conclusions  We have successfully switched to multi-batch slip stacking in MI that would allow us to achieve 400KW beam power at 120 GeV.  We have already achieved 85% of the design beam power and we are addressing the beam loss issues that are preventing us from reaching our goal.  After the end of the Collider run we plan to use the Recycler as proton pre-injector allowing us to decrease the MI ramp by 40% reaching 700KW of beam power.  Controlling the beam losses and limiting the activation of MI will continue to be our largest challenge. HB2008 – I. Kourbanis 27

f HB2008 – I. Kourbanis Extra slides 28

f HB2008 – I. Kourbanis 29 Min. Bucket Area vs. Acceleration Rate Current max. acceleration rate 205 GeV/sec NOvA acceleration rate 240 GeV/sec

f HB2008 – I. Kourbanis 30 MI rf Cavity

f HB2008 – I. Kourbanis MI Quad Bus Modifications During the NOvA ramp we are going to exceed the maximum available voltage of the defocusing (vertical) bus. We plan to increase the available voltage at the defocusing bus by replacing one of the transformers with a higher voltage one and modifying the corresponding supply. These modifications are similar to the ones done recently on the focusing quad bus in order to accommodate the installation of the wide aperture quads.