Alexei Safonov (Texas A&M University) For the EMU community.

Slides:



Advertisements
Similar presentations
Improvements to ME1/1 TMB Algorithm from Simulation Studies US CMS EMU Workshop Vadim Khotilovich, Texas A&M University.
Advertisements

Status of CMS CSC upgrade in LS1 Present CSC Status ME 4/2 project ME 1/1 project 5/20/2015 Petr Levchenko NEC 2013, Varna 1.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Samuel Silverstein Stockholm University L1Calo upgrade hardware planning + Overview of current concept + Recent work, results.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
Digital CFEB Prototype Plans 1 B. Bylsma, CSC Upgrade Workshop, Ohio State Univ., April 23-24, 2010 Ben Bylsma The Ohio State University.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
CMS EMU CSC Upgrade Digital CFEB B. Bylsma, CMS Upgrade Workshop, FNAL, Nov. 8, Ben Bylsma The Ohio State University.
Status of the CSC Track-Finder Darin Acosta University of Florida.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Design Considerations for an Upgraded Track-Finding Processor in the Level-1 Endcap Muon Trigger of CMS for SLHC operations Sep TWEPP09 D. Acosta,
Muon Port Card, Optical Link, Muon Sorter Upgrade Status M.Matveev Rice University December 17, 2009.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
1 SCA Cell Utilizing Scheme The output of each preamp-shaper channel is sampled continuously at 20 MHz and stored the SCA cells. There are 96 cells for.
A Study of Proton-Proton Collisions at the LHC The Ohio State University - Task A.2 B.G. Bylsma, L.S. Durkin, D. Fisher, J Gilmore, J.H. Gu, D. Larson,
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  Phase 2 muon plans (presented at ECFA),  What’s new since Upgrade Week  New.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Digital CFEB (an Update) B. Bylsma, EMU at CMS Week, March 16, Ben Bylsma The Ohio State University.
RPC Upscope Meeting Jay Hauser 05 Feb 20101/11 Overview of the CSC Phase I Upgrade plans ME4/2 upgrade: 72 new large chambers for high-luminosity triggering.
UCLA meeting, 2012 Hauser1 Since last week Technical Coordination workshop Gave talk on CSC upgrades New 2013 timeline – ME4/2 seems okay, ME1/1 is tight,
CSC High Pileup Sumulations Vadim Khotilovich Alexei Safonov Texas A&M University June 15, 2009.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
10 th LECC Workshop, September 2004, Hauser et al.1 Experience with Trigger Electronics for the CSC System of CMS J. Hauser*, E. Boyd, R. Cousins,
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
+ GE2/1 Case Considerations Alexei Safonov. + CMS Muon Upgrades CMS Technical Proposal in its part related to muon systems lists following: MEX/1 electronics.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
Stan Durkin CMS Upgrade Week 1 A Digital Pipelined Cathode Front End Board (DCFEB) Stan Durkin The Ohio State University.
P06 – Muons Alexei Safonov, L2 Manager, September 17, Director's Progress Review --Muon Overview A. Safonov, 2015 September 17.
GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping 1  Recall descoping scenarios for 235 and 200 MChF:  Tiziano:
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
OTMB Development and Upgrade Plan for LS2
CSC Hardware Upgrade Status
University of Wisconsin
SLHC Muon Upgrades and Impact on Trigger
The Ohio State University
Update on CSC Endcap Muon Port Card
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
UCLA Meeting: Notes TMB upgrade for ME1/1 issues
Muon Track-Finder Trigger
EMU Slice Test Run Plan a working document.
CMS EMU TRIGGER ELECTRONICS
Status of Full Simulation for Muon Trigger at SLHC
Anna Colaleo - INFN-Bari On behalf of the CMS Muon group
University of California Los Angeles
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
CSC Trigger Primitives Test Beam Studies
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
ME1/1 Electronics Upgrade
SLHC CSC Electronics Upgrade Spearheaded by OSU CMS Group
Sector Processor Status Report
Plans for the 2004 CSC Beam Test
Presentation transcript:

Alexei Safonov (Texas A&M University) For the EMU community

1. Improve redundancy Add station ME-4/2 covering  = Critical for momentum resolution 2. Upgrade electronics to sustain higher rates New DCFEB boards for station ME-1/1  Also a must for increased latency Forces upgrade of downstream EMU electronics  Particularly TMB and DMB Upgrade MPC and CSCTF to handle higher stub rate 3. Extend CSC Efficiency into  = region Robust operation requires TMB upgrade, unganging strips in ME-1a, new DCFEBs, upgrade CSCTF+MPC  Possibly not all at the same time  Notes: Points (2) and (3) are achieved simultaneously Smooth transition to Phase II (no re-upgrades)

 Although hands down the best in CMS, our SLHC simulation has shortcomings: No neutron backgrounds No beam backgrounds  These can be large effects: Note 2002/007: at LHC Lumi neutron rate is +25% of prompt Could be +250% at SLHC (assuming every neutron gives 2-3 hits, quadratic dependence - ask D. Acosta for details)  To offset this shortcomings, I use prompt-only rates from simulation w/ 400 PU as a conservative (?) estimate for prompt+non-prompt rates with ~100PU

ME4/2 upgrade R-Z cross-section “Empty” YE3 disk ready for ME4/2

5  Efficiency gaps for good quality CSC TF tracks disappear with addition of ME4/2

ME4/2 Upgrade Motivation  Triggering with & without the ME4/2 upgrade: Level 1 trigger threshold is reduced from 48  18 GeV/c Target Rate 5 kHz Ingo Bloch, Norbert Neumeister, Rick Wilkinson

 Current CFEBs: Self-triggers (pre-LCT) and awaits L1 Accept SCA: analog charge storage  96 capacitors per channel - bottleneck  SLHC: 10% of the time SCA overused  Pure electronics limitation: ME-1/1 – highest rate, needs to be replaced in Phase I

 Replace Conventional ADC and SCA storage with Flash ADC and Digital Storage Deadtimeless, no rate worries Similar cost to old system Fairly radical design, i.e. couldn’t build 8 years ago  Complex board: analog and digital in one (noise!)  Output: skewclear (CFEB)  fiber (DCFEB)  DCFEB upgrade forces upgrade of TMB and DMB

 Momentum resolution determined by nearest station  Trigger stub finding efficiency: Green – default CSC trigger Red – tune current TMB to include high eta At higher rate pulls down efficiency in the bulk (ME-1b) Independent of DCFEB issue, TMB mezzanine needs replacement Current FPGA full

 High-  section of ME1/1 Cathode strips are currently ganged 3:1  Challenge for CSC TF: Even with a new TMB a triple ambiguity  Increased combinatorics, larger rate if try all three  Need to ungang ME-1a Couple with CFEB upgrade: 5 CFEBs  7 DCFEBs Channel 16 … Electronics Channel 1 … … Strips: …

 Main challenge is higher rate of stubs at higher luminosity CSCTF: needs more power and more links to handle higher rate of input stubs MPC: remove a bottleneck limit on the number of LCTs (now 3) Think of lepton jets from dark photons or NMSSM Higgs N(stubs) in ME1 Prob for 2  +PU ≥315% ≥43% Falls under the trigger group roof, but important for this discussion

#UpgradeMotivationConstraints 1Station ME-4/2 Trigger rate control in  = May or may not require a shutdown, requires electronics (new or from ME-1/1) 2Digital CFEBs: ME-1/1Old CFEBs can’t handle the rateShutdown for installation, finalized DCFEB version 3Ungang strips: ME-1aReduce ambiguity (and rate) for CSCTF, improve efficiency in  = Shutdown, DCFEBs on hand 4TMB (mezzanine) Required for triggering  = , compatibility with DCFEBs Anytime if backwards compatible 5DMBCompatibility with DCFEBsAnytime if backwards compatible 6MPC and CSC TFHandle high rates of trigger stubAnytime if compatible with TMB  Q: Is the specific ordering important?

 Very productive meeting at Ohio State last week: Focus on electronics related issues A detailed plan developed including a schedule of first prototypes  E.g. DCFEB in Fall (OSU), TMB this Summer (TAMU)  Loopback, fiber, memory testing (Rice, UCLA, OSU, TAMU) Division of labor:  Radiation hardness tests for SEUs (NEU, UF) Interesting possibilities for new groups coming onboard, as well as backup scenarios planning

Now – 2012 Work on prototypes for DCFEB, TMB, DMB Radiation hardness studies Setup a facility for ME4/2 chamber production 2012 Shutdown Install mature electronics prototypes on ME-4/2 Rigorous testing and commissioning Production of ME-4/2 chambers and electronics for ME-1/ Shutdown Install ME-4/2 and upgraded electronics (DCFEB, DMB, TMB) on ME-1/1, old ME-1/1 electronics goes onto ME-4/2 MPC and CSC TF upgrade Enjoy the rich physics at Phase-I luminosity Production of electronics for Phase-II  In this scenario, bulk of the upgrades in 2015 Can we do better physics sooner? Maybe…

Now – 2012 Work on prototypes for DCFEB, TMB, DMB Radiation hardness studies Setup a facility for ME4/2 chamber production 2012 Shutdown Install mature electronics prototypes on ME-4/2 Rigorous testing and commissioning Production of ME-4/2 chambers and electronics for ME-1/1 Install new ME-1/1 TMBs during ‘12 shutdown or soon after Also install new MPC and CSCTF? 2015 Shutdown Install ME-4/2 and upgraded electronics (DCFEB, DMB, TMB) on ME-1/1, old ME-1/1 electronics goes onto ME-4/2 MPC and CSC TF upgrade Enjoy the rich physics at Phase-I luminosity Production of electronics for Phase-II  Q: What does it give us?

 Robust LCT triggering up to  =2.4 Remember: current TMB was never designed to go beyond 2.1 even for LHC luminosity Continuing triggering at high eta will cause large inefficiency in  =1.6 to 2.4  Could be 5% (using prompt-only PU50 as an estimate), could be to more (50% for prompt PU400) 17  No reason not to upgrade MPC and CSC TF at the same time

 Backwards compatibility Copper connections for old CFEBs Fiber inputs available for new dCFEBs  Easy upgrade installation Swap mezzanine cards Replace TMB front panels  New panel allows dCFEB fiber connector Can install one crate (9 boards) at a time, ~2 crates per day  Forward compatibility: New DCFEBs: plug in fibers and update the TMB firmware

 Feasibility studies by no means complete yet  Working on new mezzanine prototype (J. Gilmore) Schematic and layout work in progress A prototype planned to be made this summer  SNAP-12 fiber components on order  All other parts (FPGAs, etc) are in hand  Use Xilinx XC6VLX195T-2FFG1156CES Start backward compatibility tests  Current firmware being ported to Virtex-6 by UCLA  New firmware soon, TAMU is documenting the algorithm  Technical issues being studied: Heat distribution (regulator test board) Power (e.g. LV could need modifications), radiation hardness tests later  Production costs are estimated at $400k

 J. Hauser et al (UCLA)  D. Acosta, I. Furic, A. Madorsky (Florida)  B. Bylsma, S. Durkin (OSU)  P. Padley, M. Matveev (Rice)  J. Gilmore, V. Khotilovich, I. Suarez (TAMU)

 Plan of CSC upgrades well established: Shortcomings of the current system are well understood and have been studied in detail using simulation Solutions has been proposed and tested in simulation  Schedule has been re-synced with the machine plans and better analysis of available resources Additional resources are being identified including via new institutions coming onboard Planning includes more efficient separation of labor and closer collaboration on common tasks  New options are being considered aiming at improving detector and quality of data well before 2015