Stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The NEMO DAQ electronics: Actual characteristics and new features.

Slides:



Advertisements
Similar presentations
NEMO Fase1 OPTICAL DATA TRANSPORT F. Ameli, M. Bonori, I.N.F.N. Sez. Roma1. VLVυT - Amsterdam 5-8 October Architecture Working Group NEMO Phase 1.
Advertisements

M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
VLV T – Workshop 2003 C. A. Nicolau – VLV T - Amsterdam 5-8 October 2003 A 200-MHz FPGA based PMT acquisition electronics for NEMO experiment Read Out.
Ionization Profile Monitor Front End (IFE) System Presenter: Kwame Bowie PPD/EED Phone: (630)
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
September 22, 2005 ESF Workshop-Perugia 1 Virgo Control Electronic upgrade Annecy/Pisa/EGO B.Mours.
Martino Ruppi – KM3NeT 16 – 18 April Pylos Clock distribution and absolute time calibration in NEMO phase 1 Martino Ruppi INFN di Bari.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
VELO upgrade Front-end ECS LHCb upgrade electronics meeting 12 April 2012 Martin van Beuzekom on behalf of the VELO upgrade group Some thoughts, nothing.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3-4 December 2007 Advanced.
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
INFN Bari, Bologna, Catania, Genova, LNF, LNS, Napoli, Pisa, Roma Università Bari, Bologna, Catania, Genova, Napoli, Pisa, Roma “La Sapienza” CNR Istituto.
VLVnT 2015 – Very Large Volume Neutrino Telescope 14 – 16 September 2015, University “Sapienza”, Rome - Italy Carlo A. Nicolau – INFN Sez. Roma
Characterization of the electro-optical transceivers in the KM3NeT optical network S.Pulvirenti, F. Ameli, A. D’Amico, G. Kieft, J-W Schmelling for KM3NeT.
Salvatore Viola, INFN-LNS VLVνT 2011, Erlangen - October 12-14, 2011 Salvatore Viola 5th International Workshop on Very Large Volume Neutrino Telescopes.
M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 Timing calibration in NEMO M. Circella Istituto Nazionale.
24/03/2010 TDAQ WG - CERN 1 LKr L0 trigger status report V. Bonaiuto, G. Carboni, L. Cesaroni, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
VLVnT09A. Belias1 The on-shore DAQ system for a deep-sea neutrino telescope A.Belias NOA-NESTOR.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
OPERA TT MEETING BRUSSELS, April 11, 2003 Status of the OPERA DAQ Status of the OPERA DAQ D.Autiero, J.Marteau T.Descombes  informatics S.Gardien, C.Girerd,
SRS Activities at IFIN-HH: VMM2 Hybrid, FECv6 Firmware, High- Density Optical ATCA-SRS Mezzanine Sorin Martoiu, Michele Renda, Paul Vartolomei (IFIN-HH.
FEC electronicsRD-51 mini week, CERN, Sept Towards the scalable readout system: FEC electronics for APV25, AFTER and Timepix J.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
VLV T – Workshop 2003 Read Out and Data Transmission Working Group Synchronous Data Transmission Protocol for NEMO experiment.
PSI - 11 Feb Status of the electronic systems of the MEG Experiment.
1 Preparation to test the Versatile Link in a point to point configuration 1.Versatile Link WP 1.1: test the Versatile Link in a point to point (p2p) configuration.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
BPM stripline acquisition in CLEX Sébastien Vilalte.
Standard electronics for CLIC module. Sébastien Vilalte CTC
S.Anvar, V.Gautard, H.Le Provost, F.Louis, K.Menager, Y.Moudden, B.Vallage, E.Zonca, on behalf of the KM3NeT consortium 1 IRFU/SEDI-CEA Saclay F
09/09/2010 TDAQ WG - Louvain 1 LKr L0 trigger status report V. Bonaiuto, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti, F. Sargeni, F. Scarfi’
Mircea Bogdan Chicago, Oct. 09, BIT, 500 MHz ADC Module for the KOTO Experiment The University of Chicago.
From NEMO to KM3NeT-Italy Carlo Alessandro Nicolau on behalf of the KM3NeT-Italy Collaboration Conference - Roma 22/5/2013.
F. Simeone – University “Sapienza” and INFN Sec. Roma1RICAP 11 Conference Roma May 2011 The data acquisition and transport design for NEMO phase.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Elettronica di Piano di KM3NeT-Italia Carlo Alessandro Nicolau Meeting, LNS, 27/11/2014.
F. Simeone – INFN, Sez. Roma1 RICAP07 Conference, Rome June 2007 Data taking system for NEMO experiment RICAP07.
Status and Advances on the Acoustic Positioning System for KM3NeT Giuseppina Larosa, IGIC-UPV KM3NeT General Meeting, Nikhef 28-31/03/2011.
Isabella Amore VLV T08, Toulon, France April 2008 International Workshop on a Very Large Volume Neutrino Telescope for the Mediterranean Sea Results.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
Rosanna Cocimano for the NEMO collaboration VLV T08, Toulon, France April 2008 Rosanna Cocimano for the NEMO Collaboration A comparison of AC and.
Electronics Department Amsterdam 5-July-2010 Sander Mos 1 Status and progress of NIK* Logic WPFL - 5 July 2010 Amsterdam * Network Interface Kit.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
M. Circella, INFN Bari Time-calibration in NEMO VLVnT08 Time calibration in NEMO M. Circella, INFN Bari Time calibration The NEMO Phase 1&2 towers Time.
1 S. Russo, F. Ameli KM3Net WP3-WP5 Joint Meeting :: Paris :: February 2009 Copper backbone data transmission system: first results.
Firmware and Software for the PPM DU S. Anvar, H. Le Provost, Y.Moudden, F. Louis, E.Zonca – CEA Saclay IRFU – Amsterdam/NIKHEF, 2011 March 30.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
23 April, 2008Gabriele Giovanetti – INFN - LNS1 New electronics architecture in NEMO – phase 2. Gabriele Giovanetti – INFN – LNS NEMO Phase 1: 4 floor.
KM3NET-IT Tower Power System Rosanna Cocimano for KM3NET-IT Power Group 26 november
A DWDM link for Real-Time data acquisition systems
DAQ read out system Status Report
Test Boards Design for LTDB
“FPGA shore station demonstrator for KM3NeT”
Mapping area of the 36 PMT 9 PMT 9 PMT 9 PMT 9 PMT.
Data Aquisition System
VLVNT08 Toulone April 2008 Low Power Multi-Dynamics Front-End Architecture for the OM of a Neutrino Underwater Telescope Domenico Lo Presti Istituto Nazionale.
Electronics, Trigger and DAQ for SuperB
Data transport architecture over fiber and/or copper
Front-end electronic system for large area photomultipliers readout
VELO readout On detector electronics Off detector electronics to DAQ
Commodity Flash ADC-FPGA Based Electronics for an
NA61 - Single Computer DAQ !
Read Out and Data Transmission Working Group
Fixed Latency Serial Links with FPGA-embedded SerDes for SuperB
Presentation transcript:

stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The NEMO DAQ electronics: Actual characteristics and new features

NEMO tower layout The basic self consistent element is the tower Main components: o Optical module (PMT and FE) o Floor Control Module o Junction Box

stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 One floor data is received on shore by twin FCM board plugged on host machine Data transmission Optical module data coming from 4 Front End modules (FEM) FEM#2FEM#3 FEM#0FEM#1 Sea Shore Storage and data manager Off shore data concentration is carried out by Floor Control Module Board (FCMB)

stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 Front End Module Board Signal sampling: double 100 MHz 8 bit ADC’s quasi-logarithmic compression (13 bits) On board calibration circuit PMT HV management Low power Safe configuration from remote Optical Module housekeeping

stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 Floor Control Module Board Off shore - On shore link FEM interface Fiber Optic interface DWDM transceiver Communication with other electronics: Slow control board Time Calibration Other features: Safe remote reconfiguration

stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 Floor Control Module Board data bridge Electrical Interfaces for 4 Optical Modules (up to 8) 3 Differential Lines:  Tx Clock line (5 MHz)  Tx Data line (5 Mbps)  Rx Data line (20 Mbps) Spartan-3 FPGA bridges optics and OMs Electro-Optical Interface: Ser-Des (up to 1.4 Gbps) + DWDM compliant Transceiver

stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 Freescale DSP56301 with PCI 32/33 interface: Board Debug System control and management On-shore data and slow control extraction Measured sustained performance: 60MBps Slow Control board connector: electrical link with SPI interface Time calibration connector: set calibration parameters trigger optical pulses to OMs Power Area: linear LDO regulators to minimize noise. On-shore Clock Input Floor Control Module Board interfaces

stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 Clock distribution: On shore Time station (GPS) Slow clock PLL Sys clock Data Data + clk to off shore Sys clock

stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 Clock distribution: Off shore Sys clock Data Data + clk from on shore Clock and data on the same fiber

stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The FCMB for NEMO phase 2 FE embedded on FCMB New AD converters: one 12 bit 200 MHZ ADC per PMT New on shore interface (1 Gbit Ethernet or PCI Express) Secondary Junction-Box Tower Base FCM (Floor Control Module) OM-PMT Analog signals electrical link Optical link 40m 150m Floor 16 Floor 15 Floor 2 Floor 1 PMT1 PMT2 PMT3 PMT4 10m

stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The new FCMB

stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 NEMO phase 2 FE embedded on FCMB One 12 bit 200 MHZ ADC per PMT Gbit Ethernet or PCI Express on shore interface DC/DC power FE into OM Two 8 bit 100 MHZ ADC’s per PMT PCI on shore interface AC/DC power NEMO phase 1 VS

stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The next phase: Copper data link Secondary Junction-Box Tower Base FCM (Floor Control Module) OM-PMT & FE electronics Analog signals electrical link Optical link 40m 150m Floor 16 Floor 15 Floor 2 Floor 1 PMT1 PMT2 PMT3 PMT4 10m

stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The next phase: Copper data link