Spitzer Space Telescope Lisa Storrie-Lombardi Spitzer Science Center, Manager & Asst. Director for Community Affairs Implementing Portals of the Universe:

Slides:



Advertisements
Similar presentations
Preliminary management plan for PACE SDT What are the Goals of PACE? The goals of the PACE mission are: 1-Extend key climate data records on ocean color.
Advertisements

Senior Review 2012 Summary Presented to AAAC May 11, 2012 Jaya Bajpayee Program Executive Astrophysics Operating Missions & Physics of the Cosmos Program.
How to Write Grants Version 2009.
Kepler Martin Still (NASA Ames) 25 April Portals to the Universe: Lessons Learned Meeting - Apr 25, STScI - Martin Still mission duration3.5.
1 HST Cycle 12 TAC Results Bob Williams TIPS – 17 April 2003.
Canadian Virtual Observatory Project David Schade Canadian Astronomy Data Centre Herzberg Institute for Astrophysics National Research Council Canada.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Chandra Director’s Office Chandra’s Second Decade  Lifetime: ≥15-20 years (RJB’s presentation)  Is all key Chandra science enabled by current proposal.
Chapter 10 Information Systems Management. Agenda Information Systems Department Plan the Use of IT Manage Computing Infrastructure Manage Enterprise.
Chandra Users’ Committee, Oct 2008 Chandra Director’s Office Chandra Director’s Office Proposal Cycle 10  639 submitted proposals  *5.6 oversubscribed.
National Science Foundation: Transforming Undergraduate Education in Science, Technology, Engineering, and Mathematics (TUES)
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
EAS 299 Writing research papers
Panel Summary Andrew Hanushevsky Stanford Linear Accelerator Center Stanford University XLDB 23-October-07.
The Systems Engineer’s Role in Project Success J. H Rothenberg May 1, 2006.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
TMT Instrumentation Canadian capabilities and interests David Loop, NRC-HIA June 26, 2010.
The Universe in the Infrared What is the Spitzer Space Telescope, and how does it work? Funded by NASA’s Spitzer Science Center Images courtesy NASA/JPL.
The James Webb Space Telescope. Introduction The James Webb Space Telescope  The James Webb Space Telescope, also called Webb or JWST, is a large, space-based.
Introduction of Space Technology. The James Webb Space Telescope The James Webb Space Telescope was previously known as the Next Generation Space Telescope.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Workshop Purpose Paul Hertz April 25, The Importance of Astronomy Science Centers NASA Astronomy Science Centers provide functions for the community:
Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center 25 April 2012 Implementing Portals of the Universe, April
Design Completion A Major Milestone System is Presented to Users and Management for Approval.
MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September JWST Status.
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
The NASA/NExScI/IPAC Star and Exoplanet Database 14 May 2009 David R. Ciardi on behalf of the NStED Team.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
1 Fermi Users Group FSSC News and Operations Support Chris Shrader, Fermi Science support Center NASA/GSFC Fermi Users Group Meeting Goddard Space Flight.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
At A Glance VOLT is a freeware, platform independent tool set that coordinates cross-mission observation planning and scheduling among one or more space.
Dr. Chas Beichman, Executive Director Dr. Rachel Akeson, Deputy Director Dr. Dawn Gelino, Science Community Affairs 25 April 2012.
Harvey Tananbaum Director Chandra X-ray Center Harvard-Smithsonian Center for Astrophysics 13th HEAD Meeting April 8, 2013 Building International Space.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Introduction to Systems Analysis and Design
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
The Future of Helioseismology. NSF Senior Review Has recommended that GONG be closed one year after successful SDO/HMI commissioning unless outside funding.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
What European needs to do to take the lead in Space Astronomy ESO Astronomy Faculty May 2004.
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
Hubble Space Telescope Brad Whitmore 25 April 2012.
1 Douglas Hudgins Exoplanet Exploration Program Scientist Presentation to ExoPAG#8, Denver Colorado October 5, 2013.
Hubble Space Telescope By Brittany Bellows Physics 1040 – Spring 2011.
Opportunities to share with students & faculty.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
An Early Release Science Program Janice C. Lee STScI Science Mission Office JWST Science Working Group Meeting 29 April 2015.
The Universe in the Infrared How do astronomers use Spitzer and what do they do with the data? Funded by NASA’s Spitzer Science Center Images courtesy.
Senior Review of NSF Facilities NOAO Users Committee October 4, 2005.
March 2004 At A Glance Advanced Mission Design (AMD) researches and develops innovative trajectories and the mathematical methods used for optimal designs.
HUBBLE SPACE TELESCOPE MEHAKEN & LOGZ. DESCRIPTION What is it? A telescope mounted on a satellite that orbits the Earth, used to observe distant parts.
July 2003 At A Glance The GMSEC provides efficient and enabling GSFC mission services and products for the next decade. Benefits Establishes a Single Strategic.
GSMT SWG Meeting November, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Rebecca L. Mugridge LFO Research Colloquium March 19, 2008.
& Eric P. Smith HST/JWST Program Scientist Astrophysics Division NASA Headquarters.
Preparing for the Future: NASA's Planning for the Decadal Survey
Design Completion A Major Milestone
JWST Science Policy & Science Parallels
The Hubble Telescope
Some … Facts & Recommendations
A Galaxy Revealed in Multiple Wavelengths
Chandra Science Highlight
NASA Budget & the Political Process
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

Spitzer Space Telescope Lisa Storrie-Lombardi Spitzer Science Center, Manager & Asst. Director for Community Affairs Implementing Portals of the Universe: Lessons Learned

Basic Parameters Implementing Portals of the Universe April 2012 SPITZER SPACE TELESCOPE 1 Mission Duration: 8+ years: year 3 of Warm +5.5 yr Cryogenic Mission Userbase: international, thousands Archive Data Volume: > 50 TB, tens of millions of data files Instruments: Warm Mission -- IRAC 3.6 and 4.5 micron imaging Cryogenic Mission: IRAC (3.6 – 8 micron imaging), MIPS (24, 70, 160 micron imaging+ SED mode), IRS (5-40 micron spec. +16 micron imaging) Program Model: 100% GO time for Warm Mission Cryogenic Mission: 80-85% GO, 15-20% GTO + Archive & Theory programs Proposals/Cycle: Warm Mission (by design) Cryogenic Mission: 650 – 850 Users: >8,000 PI/CoIs for mission (10% unique), 20% PIs new in Cycle-8 53 Legacy/Exploration Science programs have engaged community in new way Legacy program was pioneered by Spitzer with input from community task force Funding model: Formulaic data analysis funding Warm Mission: $5-10m/cycle GO funding 7000 – 8000 hours/year Cryogenic mission: $20-25m/cycle GO funding 6000 – 6500 hours/year Default proprietary data period: Exploration Science (80% of Warm Mission hrs) – no proprietary period Cryogenic mission – Legacy programs also had zero proprietary period Regular GO programs – 1 year

Implementing Portals of the Universe April 2012 SPITZER SPACE TELESCOPE2 Best Practices

Highlight #1: Major Mission Evolution is Possible* Implementing Portals of the Universe April 2012 SPITZER SPACE TELESCOPE 3 Cutting-edge science = first requirement Community input is key for major science operations changes 6-month community input process, followed by the Warm Mission Workshop, was key in helping us formulate final science operations changes moving from cryo to warm operations Minimize additional risk to the mission hardware Accept some additional risk to the science Fewer detailed technical reviews of proposals Slower recovery from anomalies *Without changes in hardware

Highlight #2: Complexity does not equal Performance Implementing Portals of the Universe April 2012 SPITZER SPACE TELESCOPE 4 Total Spitzer instrument moving parts = 2 Only one of these has ever been used (MIPS scan mirror) IRS & MIPS were fully functional when shut off after 5.5 years of cryogenic operations The IRAC instrument is in its 8 th year operations and was last power- cycled 1,022 days ago. Defined Observing Modes [only 8 in cryo-mission] AOTs – Astronomical Observation Templates Several sets of parameters available in each AOT Added additional AOT for IRS imaging in cryo-mission Added warm IRAC imaging mode Just added new peak-up feature to warm IRAC imaging IERS (Instrument Engineering Requests) used to support high- impact science not available with AOT

Highlight #3: Formulaic Data Analysis Funding Implementing Portals of the Universe April 2012 SPITZER SPACE TELESCOPE 5 With sufficient available funding, using a funding formula based on the program size and complexity will facilitate completion and publication of the proposed research We have no evidence that not including institutional overhead as a factor harms the research It is not an efficient use of funds to pay a staff of people to handle modifications of budgets moving $1000 from travel to post-doc salaries with multiple levels of approvals required Optimally, special funding requests should be able to be handled at the Director’s level

Implementing Portals of the Universe April 2012 SPITZER SPACE TELESCOPE6 What are the Constraints in Current Policies?

Suggestions & Concerns #1 Implementing Portals of the Universe April 2012 SPITZER SPACE TELESCOPE 7 For Community Observatories that face cancellation in the Senior Review as a real option, the timing of the SR makes it extremely difficult to plan and execute the cycles that span the SR funding boundary Hubble & Chandra can plan cycles across SR boundaries Spitzer can’t without selecting several months of observations that may not be executed – even 3 more months of funded operations through the calendar make a big difference in the planning

Suggestions & Concerns #2 Implementing Portals of the Universe April 2012 SPITZER SPACE TELESCOPE 8 Reducing your instrument complement from three to 2 channels of a 4-channel instrument does not mean your observatory can reduce its operating costs by 5/6 The infrastructure that each observatory is designed with will provide hard constraints on the minimum cost to operate A detailed project staffing review does have benefit for both NASA and the project involved

Suggestions & Concerns #3 Implementing Portals of the Universe April 2012 SPITZER SPACE TELESCOPE 9 The last decade has been a true golden age for space astrophysics. During the next decade we are in serious danger of losing much of the intellectual capital and mission expertise that made this possible.

Summary Implementing Portals of the Universe April 2012 SPITZER SPACE TELESCOPE 10 The Spitzer mission is a prime example of why NASA builds space astrophysics observatories. The mission successfully accomplished the science mission it was built to execute. CURRENT MAJOR SCIENCE THEMES WERE NOT PART OF SCIENCE MISSION WHEN DESIGNED, BUILT CAPABILITY ABLE TO MATCH COMMUNITY SCIENCE NEEDED Spitzer has evolved into NASA’s primary exoplanet characterization instrument, a science field didn’t exist when the observatory was originally planned. Capability exists due to: 1. The robust design and engineering of the observatory and instruments and the unique orbit. 2. The quality and dedication of the science and operations staff flying the mission. 3. The creativity of the science community. Spitzer has been able to benefit from/capitalize on progress from other missions – HST-WF3/Herschel/WISE/Kepler/etc. to keep our science palette fresh