API Monogram Program Monogram Program Staff – SC Liaison Report

Slides:



Advertisements
Similar presentations
SC 18 Ad Hoc Task Group API Staff Issues Ed Durante, Chair.
Advertisements

Presented by on behalf of API by TIEC, Inc. A Review of API and the Monogram Program.
Transition from Q1- 8th to Q1- 9th edition
Chambers Li API Beijing office
ASTM/ASME/API/RSPP Standards Workshop
API Monogram Program Status Report
Environmental Management System (EMS)
2012 Standards Conference SC18 Committee on Quality Standards Westminster, CO June 14, 2012 API Monogram Program Status Report W. Don Whittaker Manager.
GReening business through the Enterprise Europe Network EN Giovanni FRANCO European Commission Enterprise and Industry EN
22000 Food Safety Management Systems
Quality Management System
1 Conformity Assessment Schemes Presented by Andrew Kwan ITU Consultant Conformity and Interoperability Training for ARB Region on Type Approval Testing.
TEMPUS ME-TEMPUS-JPHES
First Practice - Information Security Management System Implementation and ISO Certification.
Product Lifecycle Management
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
ISO/TC 176 Quality Management Standards “Meet the Family” Presented by David Zimmerman Project Manager Project Manager ISO/TC 176 Secretariat.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2014.
ISO 9000 Certification ISO 9001 and ISO
4. Quality Management System (QMS)
Cover graphic should fill and not exceed the defined grey box. June 27, 2013 Gary Devlin API Subcommittee 18 – Quality Task Group 7: Product Life Cycle.
TC176/IAF ISO 9001:2000 Auditing Practices Group.
4. Quality Management System (QMS)
Key changes and transition process
ISO 9001 Quality Management System
2013 Standards Conference SC18 Committee on Quality Standards Washington, DC June 27, 2013 API Monogram Program Status Report W. Don Whittaker Manager.
API Monogram Program Status Report 2014 Standards Conference SC18 Committee on Quality Standards Chicago June 14, 2014 Shawn Adams Sr. Associate, Audit.
API SC18 Liaison report Mike Briggs SURFACE SYSTEMS RAISING PERFORMANCE. TOGETHER TM.
2009 Standardization Conference SC18 Committee on Quality Standards San Antonio, Texas January 21, 2009 API Monogram Program Status Report 1220 L Street,
Basics of OHSAS Occupational Health & Safety Management System
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
Cover graphic should fill and not exceed the defined grey box. API SC 18 – Quality Product Life Cycle TG7.
2011 Standards Conference SC18 Committee on Quality Standards San Francisco June 30, 2011 API Monogram Program Status Report W. Don Whittaker Manager Monogram.
API Sales and Marketing
AUDIT PROGRAM STATUS  Status of Audits  Auditor Activities  Audit Program  Looking Ahead.
2009 Standardization Conference SC18 Committee on Quality Standards Westminster, Colorado June 25, 2009 API Monogram Program Status Report W. Don Whittaker.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
1220 L Street, NW Washington, DC Executive Committee on Standardization of Oilfield Equipment & Materials (ECS) New Member Orientation.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
Use of API 6A vs ISO in marking 6A equipment
SC18 TG5 Development of a Guidance Document for the implementation of API Specification Q2 Objective Create a guidance document for users of the API Specification.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
ISO Registration Common Areas of Nonconformances.
The common structure and ISO 9001:2015 additions
Registration Process Environmental Management Systems Workshop Mobile, AL June 20-21, 2001 Beth Graves NC Division of Pollution Prevention and Environmental.
ISO Most Common Problems May 25, 2000 Underwriters Laboratories Inc. May 25, 2000 Underwriters Laboratories Inc.
San Francisco, CA. SC8 Liaison Report
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
INGAA Quality Management Systems White Paper Supporting Pipeline Construction.
TC176/IAF ISO 9001:2000 Auditing Practices Group.
1 QUALITY MANAGEMENT SYSTEM PRESENTATION TO BOTSWANA DRUG ADVISORY BOARD MEMBERS 13 th – 17 th AUGUST 2007.
Quality Management Systems Advice from ISO/TC 176 for Sector-specific applications.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
ISO :2015 Documentation kit for Accreditation of Certifying Body - by Global Manager Group
Hospital Accreditation Documentation Process & Standard Requirements
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Update of API Standards for Supply Chain Management API Standard 20J – Qualification of Distributors.
API SPEC Q2 FOR AUDITING API MONOGRAM PROGRAM BOARD UPDATE TO SC16 Stacey W. Hagen ExxonMobil Development Company API Monogram Program Board Liaison to.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
ISO/IEC
Updates from SC18 Summer Meeting
NEEDS & EXPECTATIONS: INTERESTED PARTIES TO ISO & AS9100
Use of API 6A vs ISO in marking 6A equipment
SC 18 Liaison Report Winter 2012
American Petroleum Institute Certification Programs
Presentation transcript:

API Monogram Program Monogram Program Staff – SC Liaison Report 2015 Summer E&P Standards Conference Aaron Duke, Senior Associate, Monogram-APIQR Introduction of yourself and role. Liaison that works with the Standards Associate and MPB Liaison to facilitate communication between the specific SC stakeholder groups and the Monogram Program. Ensure that everyone is up to date on changes, roles, products/specs in the program, voice concerns with auditing and the program. Two-way communications. This presentation is the first step in the process to improving the communications and focusing efforts on improving the quality of the Monogram Program.

Monogram Program Board & Monogram 2020 Initiatives to improve Monogram Program quality and improve value of the program to industry stakeholders (Users and Manufacturers) AUDIT PROGRAM INITIATIVES Improve the Monogram Program audit quality, effectiveness and rigor COMMUNICATION INITIATIVES Better education and outreach to stakeholder groups MP-SC liaisons – You are better informed, We are better informed Monogram Program Board is the governing board that reports to CSOEM and provides guidance to the Monogram Program. Monogram 2020 MPB and API Monogram program staff initiative to improve the program. Provide value back to the stakeholders. Re-focus on quality of the program. MPB initiative to improve the audit program – better audits – and to improve communications. Audit Program Initiatives Improve consistency of the audit process and standard/spec application; auditor consistency and competency; audit to specific parts of the specifications; shorter focused and more frequent audits; increased audit frequency Communication Initiatives – Educate stakeholder base; provide better information to all stakeholders; key messages to specific stakeholder groups; reason we are presenting to the SCs MP Staff – Liaisons – work with Standard’s Associate to keep SCs updated on Monogram Program issues and to have information flow on technical issues coming back to Monogram Program New specifications and changes to specifications – drive our color coding, audit questions, auditor tools

The Meaning of the API Monogram The use of the API Monogram on product constitutes a representation and warrantee by the licensed manufacturer that, on the date of manufacture, the product conforms to all applicable, current editions of specifications, standards and requirements of API. Monogram is a protected trademark Monogram can only be used on new equipment License is facility and product specific Licensees must have a API Spec Q1 management system in place Licensees must meet legally enforceable program requirements API regularly audits to all the program requirements Rolling out a refresh to educate the stakeholders on the Meaning of the Monogram. Actually a 2-page insert in the Standards Program on this topic. Will be educational materials prepared and posted on the website and to provide to Users on this topic.

Where can you help? COLOR CODING PRODUCTS ELIGIBLE FOR LICENSING (aka LIFs) AUDIT QUESTIONS AUDIT TOOLS & AUDITOR TRAINING MATERIALS This is really the important aspects of the MP Staff – SC liaison role Making sure that MP staff stay in tune with changing specifications and new specifications. Facilitation of the color coding process, identification of the products eligible for licensing, develop the audit questions, and work on auditor tools and training materials. Audit questions and auditor tools and training materials key to support Monogram 2020 initiatives to improve the consistency and competency of the auditors. May be worth considering establishment of a TG to address these items

Where can you help? Development/Revision of the Specs COLOR CODING Required by S1 for any standard that will be used in the Monogram Program Performed as part of the publication process Identifies auditable requirements – criteria for products Used to identify purchaser specified requirements for purchasing guidelines PRODUCTS ELIGIBLE FOR LICENSING (aka LIFs) Based on specification and auditable requirements Adequate design, material, inspection, testing and technical requirements Provide some more details on what these things are.. Color Coding Most value when this is completed and reviewed as part of the publication and revision process. After a document has been published it really is not valuable. Uses pre-defined colors (Annex E of S1) to identify Auditable shalls/requirements, un-auditable items such as may, should, approximate, where applicable, etc, and problems / conflicts API uses a qualified contractor to generate the output for input to the SC work. Meant as information to inform the development and revision process. Ultimately up to the SC to review and decide if the color coding is relevant and applicable (i.e., a should or an approximation may be perfectly reasonable based on the product and the context it is used in the specification). Products within scope of document that are eligible for licensing Need to be specifically identified in the specification Adequate technical requirements and auditable areas. What is adequate really is up to the SC but should consider design, testing, material and manufacturing requirements. Lots of purchaser specified requirements are difficult to audit and standardize Take them to website and show them the LIFs and the purchasing guidelines

Where can you help? Audit Program & Auditors AUDIT QUESTIONS Requirements checklists for audits Based on products identified from the color coding and SC review Give auditors a checklist of requirements to cover based on the specific products AUDITOR TOOLS & TRAINING MATERIALS Recent success with 5CRA SC5 established a TG on “audit effectiveness” and developed some outputs Options can include process checklists, presentations on the specs and products, identification of critical processes, gap analysis, etc… The color coding leads the development of the audit questions for the audits. Audit Questions Checklists of requirements to be used by the auditors Concept and original audit questions developed by SC18 TG on auditing based on industry concerns that auditors were not covering enough spec requirements Went from the initial checklists for 4 specs (6A, 5L, 5CT, and 7 (now 7-1)) to 50 plus. We have had to adjust some of the original criteria relating to the selection of questions, the wording now just based strictly on the requirements, the number of question and ranking. These need to be vetted and reviewed by the SC for accuracy and application Auditor Tools and Training Materials As part of Monogram 2020 we need to address auditor competencies related the product specifications and improve the technical auditing within the program Need your help as the SC to identify what’s important, process specifics and to develop auditor training materials Will be actively looking to form more TGs and get SMEs involved to improve our tools and training materials

NCR Website Report nonconforming product, process and QMS concerns to API Monogram-QR at: Nonconformance reporting website: http://ncr.api.org/ncr.aspx, OR Yaw Addae-Mintah at addaemintahy@api.org and Aaron Duke at dukea@api.org Information kept confidential All complaints investigated and actions taken Website to be updated with process and other information We encourage all stakeholders to use this site. We get and review all kinds for reports, product nonconformities, MS issues, capability issues, product failures, some misuse / fraud reports All NC reports logged as complaints and reviewed by legal and operations for actions. In most cases we do periodic / for-cause audits to investigate the complaints and take actions against the licensed / certified companies. The periodic audits focus on the management system and the processes that yielded the NC. This would include a detailed audit of the product realization, customer complaint, CA and NC processes, etc. Complaint information used as sampling data for the system and process audit. We are not doing failure analysis and investigation but investigating the system issues that lead to the NCs to determine the effectiveness of the system and if the organization MS has generated or has the potential to generate NC products. Specific actions would include changes in licensing / certification status based on audit results, implementation of corrections and corrective actions to address the issues which could include product recalls, customer notifications,

API Monogram-APIQR Programs & ISO 9001: 2015 New version of ISO 9001 due end of this year APIQR will continue to offer accredited QMS certification in conjunction with Licensing and API Spec Q1 certification APIQR transition in 6-months Internal processes, procedures, staff & auditor competence All ISO 9001 certificates transitioned by end of 2018 API SC18 forming TG to evaluate changes We will use output from SC18 TG on the evaluation to inform our transition process when it comes to auditor training, etc. We will keep issuing ISO 9001 certificates in conjunction with our Licensing and Q1/Q2 certification programs

API GIS AXIS 2016 – CALL FOR PAPERS API GIS Exhibition on International Standards Kuala Lumpur, Malaysia - January 13-15, 2016 Educate the international stakeholders on API standards Upstream Topics Quality Management (Q1, Q2, Life Cycle Management) Monogrammed equipment specifications (wellhead and BOP) Unconventional exploration and production standards Deepwater operations Safety CALL FOR PAPERS and SMEs to participate CONTACT Aaron Duke at dukea@api.org / 1-202-682-8524 http://www.api.org/AXIS2016 Need help from the stakeholders. API GIS international conference to educate the international oil and gas community on our standards and their use within the programs. Have downstream and upstream sessions. Upstream focusing on quality, equipment specification in the MP, unconventional operations, deepwater operations and safety. Looking for abstracts for sessions OR those that are interested in participating on the planning committee that will vet and review the presentations. If you have operations in SE Asia please let them know as we would support the use of local SMEs for the sessions as well. Contact Aaron Duke with any interest. There is also a flyer being distributed at the conference. Looking forward to your participation.

THANK YOU Aaron Duke dukea@api.org 1-202-682-8524 Do you need new or revised documents color coded? Are you concerned about the products in the Monogram Program? Does your SC want to see the audit questions and review them? Any concerns about audits and gaps in the program? Do you have ideas to assist in auditor training and audits? Interested in more information on API AXIS 2016? Aaron Duke dukea@api.org 1-202-682-8524 Moving forward… I will be the liaison that works with the Standards Associate to keep up to date on happenings and documents that are being revised or published that can have an impact on the Monogram Program. We would like you to seriously consider some sort of TG or WG to facilitate some of the items we have reviewed. If you have any questions about the Monogram Program please contact me. Any questions???