CARE ASAS Validation Framework. Partners CARE ASAS Board - Francis Casaux EURCONTROL - Mick van Gool, Ulrich Borkenhagen Consortium Partners Aena, Isdefe,

Slides:



Advertisements
Similar presentations
Unmanned Aircraft Systems EUROCONTROL ATM Integration
Advertisements

1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
1 centre dÉtudes de la navigation aérienne COMMON METRICS FRAMEWORK FOR ATM PERFORMANCE ASSESSMENT AND MONITORING Almira Williams, CSSI Inc.
1 CARE-ASAS Action Plan Francis Casaux CARE-ASAS Action Manager on behalf of EUROCONTROL.
The EUROCONTROL Validation Planning Process
UNIVERSITY of GLASGOW A Comprehensive Approach to ATM Incorporating Autonomous Aircraft ATM Research Group University of Glasgow.
European ATFM From current operation towards the future Patrick Ky
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OHA CARE-ASAS Activity 3: ASM Autonomous Aircraft OHA.
© 2002 EUROCONTROL 1 One Sky for Europe EUROCONTROL CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION FRAMEWORK DISSEMINATION FORUM Validation Data Repository.
CARE ASAS Validation Framework System Performance Metrics 10th October 2002 M F (Mike) Sharples.
FAA/Eurocontrol TIM 9 on Performance Metrics – INTEGRA Rod Gingell 16 May 2002.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Introduction to the ASM project CARE-ASAS Activity 3: Airborne Separation Minima Final.
Slide 1 July 2004 – FALBALA/WP5/FOR1/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Agenda & Project Overview Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
© DLR, Institute of Flight Guidance ASAS Thematic Network 2 nd Workshop 6-8 October 2003 – Malmö Session 1 – ATSA Application Track Bernhard Czerlitzki.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Page 1 The ONESKY (Single-Sky) project and what it means for ASAS.
Mission Trajectory Step 1 From planning to deployment.
Operational applications enabled by ADS-B
Mediterranean Free Flight ASAS Separation and Spacing Presented by Andy Barff – Project Leader MFF Real-time Simulations ASAS-TN, Malmö
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation sous-direction Etudes et Recherche appliquée direction des services.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
‘One Sky for Europe’ EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 VALIDATION DATA REPOSITORY Overview.
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
Scene setting for CAATS II Episode 3 - CAATS II Final Dissemination Event Carlos Regidor Isdefe CAATS II Brussels, 13 & 14 Oct 2009.
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
Slide 1 July 2004 – FALBALA/WP5/FOR3/D – CENA, DFS, EEC, NATS, Sofréavia & UoG WP2 Current situation analysis – Aircraft perspective Philippe Louyot (CENA)
ASAS FRA OB/T ATM Projects Lufthansa point of view.
Integrated Project of the Sixth Framework Programme, Priority 1.4: Aeronautics and Space, sponsored by EC, DG TREN Contract FP Internet:
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
Federal Aviation Administration AP23 : a snapshot on Package2 ASAS-TN2 Seminar 14 April Paris By Dragos Tonea, Eurocontrol Roberta Massiah, FAA.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
CARE/ASAS Validation Framework Ros Eveleigh Activity 2 Project Manager NATS.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”
Discussions Summary ASSTAR - Crossing & Passing session.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
MFF is a EC Co-funded Programme  MEDITERRANEAN FREE FLIGHT Flight Trials Report ASAS TN2 1st Workshop | September 2005, Malmö Gennaro GRAZIANO 1/32.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
Petros Stratis – BLUE MED Project representative – DCA Cyprus Co-financed by the EU (TEN-T)
ASSTAR Overview Jean-Marc Loscos, DSNA
Chris Shaw, EUROCONTROL Experimental Centre
ASSTAR Oceanic Session Summary
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
Karim Zeghal EUROCONTROL Experimental Centre
ASSTAR Project Overview & User Forum Objectives
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

CARE ASAS Validation Framework

Partners CARE ASAS Board - Francis Casaux EURCONTROL - Mick van Gool, Ulrich Borkenhagen Consortium Partners Aena, Isdefe, NATS, NLR, QinetiQ Currently 6 months into 12 month programme

Validation of ASAS Validation Does proposed operational concept provide anticipated performance? Operational concept Performance Framework

High Level Validation Process

ASAS Framework Requirements Operational Concept - Airborne Separation Assurance Systems Performance Framework Reference Scenario High level objectives Metrics Links to Previous work Support to Users

Operational Concept ASAS application categories, from PO-ASAS Airborne Traffic Situation Awareness Current ATC rules apply Airborne Spacing Aircrew given more tasks Airborne Separation Temporary delegation of separation to aircrew Airborne Self-separation Full delegation of separation

Performance Framework ATM Strategy Objectives Safety Capacity etc Framework Scenario Operationally realistic Scenario data repository Metrics System Performance Metrics Human Performance Metrics

Validation Exercises

Links to Previous Work CARE Integra MAEVA EMERALD RTD Plan Other EUROCONTROL work

Support to User Guidelines - assistance to validation teams and managers Case Studies (Worked examples) Scenario database Documentation Dissemination Forum

Work Packages

Scenario Framework

STANDARDIZE the validation scenarios for ASAS Applications Scenario Framework based on Template Facilitate the TRACEABILITY of the scenarios SUPPORT DESIGNERS in the creation of validation scenarios for ASAS applications ENSURE THOROUGH AND CONSISTENT validation of ASAS applications Why is a scenario template needed ?

MAIN GOAL: Supporting the designer in the creation of a validation scenario Objectives of Template Structure based on PO-ASAS categories and applications with EMERALD One template for each PO-ASAS category: Airborne Traffic Situational Awareness, Airborne Spacing, Airborne Separation, Airborne Self-Separation Items for scenario definition clustered in seven groups: Objectives, Airspace, Traffic, ATS Involved, Rules, Tasks, Actors (Performer & Supervisor), Technology USER SELECTS the ITEMS that will form the scenario but SOME of them are MANDATORY Based on the chosen items, designer develops the scenario

OBJECTIVES: to be grouped by types (Safety, Capacity…) AIRSPACE: Restrictions, Types, Areas, Elements, Geographical Scope TRAFFIC: Volume, Complexity, Flight Schedule, Timeframe, Aircraft Type, Equipment Type, Aircraft Performance ATS INVOLVED: ATC, FIS, TIS-B, APP, Alert Service, GNSS, ATFM, Performance Management, New Services RULES: Flight Rules, Longitudinal Separation, Lateral Separation, Phraseology, RVSM, Aircraft Sequencing, Conflict Resolution Strategy, Co- ordination and Transfer Procedures, Trained Flight Crews TASKS AND ACTORS - Perform Separation Assurance: Performer & Supervisor TECHNOLOGY: –GROUND: Communications, Surveillance, ATM –AIRBORNE: Redundancy, Communications, Surveillance, Navigation, Display Scenario Definition Groups

Example: Technology Group GROUND Communications: Voice Data link Inter-sector information transfer Surveillance: Radar coverage No radar coverage TIS-B ADS-B CWP HMI with aircraft equipment, ID and delegation status Controller assistance tool Sequencing tool Separation monitoring tool ATM Planning Automation AIRBORNE Redundancy Communications: Voice Data link Surveillance: Mode-S TCAS II/ETCAS Audio/visual alerts Traffic information processing Surveillance data processing Spacing function processing Navigation: GNSS with augmentation FMS Automatic management of the separation (connection with FGCS) Display: CDTI/EFIS/MCDU HUD

Enhanced Visual Adquisition, EMERALD Longitudinal Station Keeping, EMERALD and NATS Closely Space Parallel Approaches, EMERALD Station Keeping Approach, EMERTA Autonomous Aircraft, EMERALD Baseline En-route Free Flight, NLR TMA ASAS Autonomous Aircraft, NLR FREER-EACAC, EEC Multi agent optimal ASAS operations (COAST), Glasgow University Optimal FFA/MAS Transition Methodology, Glasgow University ASAS Crossing Procendure, CENA Sector capacity assessment for ASAS, CENA Applied on Historic Data

Scenario Database Gathered data from sources in CARE ASAS and the VF consortium Uses EUROCONTROL Validation Data Repository Agreed data structure for scenarios based on template Obtained agreement for sharing of data Access via EUROCONTROL

System Performance Metrics

Aim was not to develop new metrics Accessible advice to validators High level objectives Hierarchy mapping objectives to metrics Many to many Taxonomy Perspectives

Objectives Objectives covered, based on ATM Strategy are: Safety Capacity Efficiency Environment Security & Defence Security & Defence extended to include terrorist threat Uniformity and Quality not considered further

Hierarchy OBJECTIVES PERFORMANCE AREAS ( ASPECTS) METRICS

Hierarchy PERFORMANCE AREAS broken down into ASPECTS where appropriate Example: ACCESS (PERFORMANCE AREA) Airports Sectors(ASPECTS) Routes Assists use with scenarios that look at specific airspace

Taxonomy METRICS INDICATORS CARE-ASAS PRC Validation C/AFT Framework TORCH

Database tool For easy manipulation of data and linkages

Database tool Enabling instant switch from top-down...

Database tool … to bottom-up view

Perspectives Different views (perspectives) can be applied to the information stored: Airline perspective as in C/AFT ATM perspective as in PRC Scenario

Perspectives Further perspectives under consideration are: Study type (FTS, RTS, Analytic or Survey) ASAS categories (Situational awareness…Self Separation) Links Human Performance metrics

Links to Previous and Parallel Work

Potential Links CARE Integra MAEVA EMERALD Ongoing EUROCONTROL work

CARE Integra EUROCONTROL funded study Metrics Capacity Safety Environment Economics QinetiQ involvement in Integra and VF Use of Integra metrics

MAEVA A Master ATM European Validation Plan Supporting EC in management of ATM projects Validation Guideline Handbook - exercise level Validation Master Plan - project validation plans Monitoring of projects Final Consolidation of Results from Projects NATS and Isdefe involvement in MAEVA & VF Alignment of VF with MAEVA VGH

MAEVA Five-Step Validation Methodology Step 1: Aims Step 5: Conclusions Step 2: Preparation Step 4: Analysis Step 3: Execution

Others EMERALD RTD Plan Plan for RTD for future technology for ATM systems NATS and QinetiQ involvement in EMERALD & VF Production of updated EMERALD RTD Plan On-going EUROCONTROL work Validation Guideline VALSUP Alignment of VF with VALSUP

Support to the User

Documentation Final report incorporating work package reports Guidance Material for application of framework Case studies of two applications In-descent spacing Fully autonomous aircraft Detailed RTD Plan developed from EMERALD Plan

Data and Tools Scenario data repository Produced in WP1 Metrics database Produced in WP2 Not a deliverable under contract

Dissemination Forum Dissemination Forum 10th October at Bretigny

Summary Validation Framework still under development Exploiting existing work for ASAS validation exercises Scenario template developed Scenario data collated for VDR Mapping of system performance metrics & human performance metrics to objectives - in progress Support user - about to start