Presentation is loading. Please wait.

Presentation is loading. Please wait.

Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Introduction to the ASM project CARE-ASAS Activity 3: Airborne Separation Minima Final.

Similar presentations


Presentation on theme: "Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Introduction to the ASM project CARE-ASAS Activity 3: Airborne Separation Minima Final."— Presentation transcript:

1 page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Introduction to the ASM project CARE-ASAS Activity 3: Airborne Separation Minima Final Workshop 19 December, Brétigny

2 page 2 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Introduction to the ASM project Agenda Introduction to the ASM project (9h30) Autonomous Aircraft results Operational Service and Environment Description (OSED) Operational Hazard Assessment (OHA) Estimating airborne separation minima Autonomous Aircraft Conclusions Lunch (12h45-14h15) Co-operative application results Operational Service and Environment Description (OSED) Operational Hazard Assessment (OHA) Conclusions (until 16h30)

3 page 3 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Introduction to the ASM project CARE/ASAS ASM Approach Applicable methodologies Likelihood of occurrence for hazards and consequence modelling WP2/WP3 Identification of hazards (OHA) WP2 Operational Service and Environment Description (OSED) WP1 Setting evaluation criteria (Target Level of Safety) Risk estimation and evaluation (TOPAZ model) WP3 First estimation of airborne separation minima Uncertainty analysis

4 page 4 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Introduction to the ASM project Project organisation

5 page 5 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Introduction to the ASM project Selection of two applications (1/2) Criteria of selection Re-use of available work Simplicity of the application Compatible with work packages Maturity of the application Interest from ATM community Most promising for ATM community Knowledge of the CARE/ASAS Activity 3 team Address the maximum of relevant issues

6 page 6 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Introduction to the ASM project Selection of two applications (2/2) Autonomous Operation Application: FFAS segregated airspace with no radar coverage, no ATC support No fixed routes FFAS surrounded by MAS only Co-operative Separation Assurance Application: Time-based separation criteria Flight crew ensures responsibility for airborne separation Airborne separation minima may be lower than ATC R&D work with no implementation objectives


Download ppt "Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Introduction to the ASM project CARE-ASAS Activity 3: Airborne Separation Minima Final."

Similar presentations


Ads by Google