19-21 Dec 20075th ATF2 Project Meeting1 Power Supply Progress and Magnetic Field Stability Summary By: Masayuki Kumada (NIRS) and Briant Lam* (SLAC)

Slides:



Advertisements
Similar presentations
Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
Advertisements

Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
HA Power Supplies - Demonstration Criteria and Status February 23, ATF2 Project HA Power Supplies Demonstration System Evaluation Criteria And Status.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
19-21 Dec 20075th ATF2 Project Meeting1 ATF2 High Availability DC Magnet Power Supplies By: Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
15 December ATF2 High Availability DC Magnet Power Supplies – Commissioning Status By: Paul Bellomo, Antonio de Lira, Briant Lam* and David MacNair.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Power Supply Controller Architecture
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Controls for High-Availability Magnet PS’s for ATF2 Glen White SLAC September
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
2nd ATF2 meetingRole Sharing between KEK and SLAC M.Kumada Role Sharing between KEK and SLAC 1.Performance of Demonstration power supply of KEK 2.Role.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
Project Status Update Mark Petree LCLS Self Seeding Status: Management put it on hold. – Preliminary conceptual design completed – Interference.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
ILC BDS Kickoff Meeting Magnet Power Supplies RDR Concepts and Completeness Paul Bellomo SLAC Power Conversion Department October, 2007.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
GM sensor tests and installation A.Jeremie K.Artoos, D. Kudryavtsev, Y.Renier, R.Tomas-Garcia, D.Schulte.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
ATF2Power supply Masayuki Kumada nirs. ATF2Po wer supply2 * to be confirmed.
ATF2Quad Fab & Measurement Status Cherrill Spencer 01/31/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads By Cherrill Spencer, SLAC,
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2 Magnets ATF2 Magnets KNU,Korea ATF2 mtgSpencer & Lam SLAC Lessons learned 1 Lessons learned from designing, fabricating & installing ATF2 magnets.
Generators, Motors, Transformers
F James T Volk Arpil Permanent Magnets for Linear Colliders James T Volk Fermilab.
K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.
Layout and conventional facility N.Terunuma KEK. Conventional facility 1 Layout of beam line should be fixed until end of June We have to start.
KEK ATF2 High Availability DC Magnet Power Supplies Phase 2 Progress and Specifications 31 May 2006 Paul Bellomo, Antonio de Lira, Briant Lam and Dave.
January 12, 2006 ATF2 DC Magnet Power Supplies1 Paul Bellomo and Briant Lam.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
Mechanical strain measurements on MQXFS1 Magnet using CERN system M.Guinchard and P.Grosclaude European Organization for Nuclear Research (CERN) 27 April,
ELENA installation progress F. Butin / ELENA collaboration.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Report Technical Director Storage-Ring-Installation Completed
L.Vitale INFN and Univ. Trieste
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
RF Systems and Controls for the LERF CM Tests
Electrical & Control.
ILC RTML Meeting EDR Planning for Magnet Power Systems
MICE Operations Scenario Run 1
ATF2 Magnet Power Supplies
DR Magnets & Power Supply System ILC-ADI Meeting March 14, 2012
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
Update - SSRL testing of SLAC Ethernet Controller As of August 4, 2005
Children’s Hospital Update
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Teleconference ACS – FREIA 19th June 2017
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

19-21 Dec 20075th ATF2 Project Meeting1 Power Supply Progress and Magnetic Field Stability Summary By: Masayuki Kumada (NIRS) and Briant Lam* (SLAC)

19-21 Dec 20075th ATF2 Project Meeting2 PS Summary Phase 2 – Procurement and testing –Progress Everything is complete, except… HA PS –First batch in transit –Second batch by Jan 2008 –Test Results <10 ppm stability for a 200A power supply <100 ppm stability for a 50A power supply running at 2A Drift in the order of 1 ppm/°C –Control System EPICS control system by Glen White

19-21 Dec 20075th ATF2 Project Meeting3 PS Summary Phase 3 - Commissioning –Schedule Shifted schedule to start in April 2008 Ship the PS systems at the end of March 2008 –Property Transfer SLAC is working on the “donation” paperwork Ensure the proper documents accompany shipment –Responsibilities KEK to provide: –Ac service –Dc cables –Interlock cables –Monitor, keyboard and mouse for IOC –Wire crimper and lugs for dc magnet cables SLAC to provide: –Everything else Note: This list may need updating

19-21 Dec 20075th ATF2 Project Meeting4 Magnetic Field Summary Magnetic field instability –Magnetic field is not stable under stable current conditions –Causes for instability Temperature –Magnetic spin –Mechanical properties Hysteresis –Fields have been known to increase with decreasing temperature But this study showed that field increase with temperature Magnetic fields increased 10’s ppm/°C

19-21 Dec 20075th ATF2 Project Meeting5 Magnetic Field Stability Further Studies –Measure magnetic field drift under different conditions More stable current source Stable cooling water supply temperature Stable magnet yoke/coil temperature –Perhaps stabilizing temperatures may help reduce magnetic field drift