1 LINK 2000+ European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.

Slides:



Advertisements
Similar presentations
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Advertisements

1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
UNITED NATIONS Shipment Details Report – January 2006.
SIP/2012/ASBU/Nairobi-WP/19
Future Communications Infrastructure – An update
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Federal Aviation Administration Required Communication Performance (RCP) Date:26-30 March 2007 Presented to:ICAO Worldwide Symposium on Performance of.
Overview of the interoperability Regulation
U.S. Plans for ADS-B Briefing for
FANS (Future Air Navigation System) Flight Crew Procedures
ATS DATALINK CENTRAL REPORTING AGENCY ACTIVITIES
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING.
International Civil Aviation Organization
Overview of Continental En-route Navigation Specifications
LINK2000+ Status Søren Dissing
LINK update Datalink Implementation EC Regulation 29/2009
Air / Ground Communications in Europe
The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
1 ICAO WGN New Orleans Nov Programme Overview Incentives and a Mandate Issues Conclusion Contents.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
TCP / IP and ATN in Europe Danny Van Roosbroek, EATM/DAS/CSM
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
Communication Domain Future Aeronautical Communications
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
The European Organisation for the Safety of Air Navigation DAL/DQR Workshop Introduction Brussels, February 2013 Presented by: Manfred Unterreiner.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Slide 1 July 2004 – FALBALA/WP5/FOR1/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Agenda & Project Overview Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
ABC Technology Project
Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007.
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Workshop on preparations for ANConf/12 − ASBU methodology
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
1 Unit 1 Kinematics Chapter 1 Day
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Future Challenges in Aviation Psychology
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
ATN Subnetwork Implementation:
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
ATN London - 23 September 2003 Alex Wandels
IBAC – CNS/ATM Datalink Briefing
ICAO WGN New Orleans Nov 2004
DATA LINK IMPLEMENTATION IN EUROPE
Presentation transcript:

1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams

2 Why Data Link?

3 CPDLC is Silent & Clear ATC MSG C P D L C - M E S S A G E O 1 / O 1 09 : 4 5 – E D Y Y 5 O P E N R E S P O N S E * W I L C O U N A B L E > * P R I N T S T A N D B Y * < R E T U R N O 9 : 4 6 A T C M S G * C L I M B T O F L 3 9 0

4 Why Data Link Now ? Kick Start the Future Fewer Misunderstandings Reduced Controller/Pilot Workload More ATC Capacity

5 Programme Objectives The LINK Programme Implementing En-route CPDLC over ATN/VDL2 Baseline ICAO standards Forward compatible with new services/technology Data link to supplement voice 11% Capacity Increase with 75% flights equipped

6 Strategic Context Objectives Scope Approach 2000>2005 >2020+ ACARS P+S RADAR ACARS Classic Radar Mode S VDL2 En-Route CPDLC Aircraft Parameters Mode S VDL2 ADS-B Receiver Initial ADS-B More CPDLC More FIS services Airborne Separation Trajectory negotiation Autonomous Separation LINK Mode S EHS FUTUREOPS/COMCASCADE 2010 >

7 Pioneers Incentives Mandate Pioneers –Objective: 100+ aircraft equipped Incentives –Objective: accelerate Airborne equipage to gain early benefits, return on investment Mandatory Carriage (SES IR) –Objective: more than 75% of flights in LINK airspace before Step Approach to Implementation

8 LINK Today Maastricht Operational

9 Bottleneck? CPDLC 2008 – Maastricht UAC, Germany, Switzerland, Italy operational 1-10% 11-20% 21-30% 11-20% 1-10% x-x% = additional capacity required by summer 2009 relative to 2004 * * - source, Network Capacity Plan

10 LINK 2010/11 – Portugal, France, Spain and UK Operational 21-30% >30% 21-30% 11-20% >10% 1-10% >30%

11 Pioneers are Flying/Ready to Fly

12 AIRLINE COMMITMENT GROWS Airborne implementation has started Lufthansa Generating more than 200,000 CPDLC flights/year Total Number Pioneer Airframes = 302 Some places are left …………… 12 CRJ MD80 23 A321 Lufthansa CityLine 6 A320/321 New 12 A320/321

13 More Pioneers ? Total = 302Funded = 144 Airframe Places Left = some 14 Airlines Recruited33 Airlines Visited

14 Pioneer Avionics ROCKWELL CMU Pioneers are flying Honeywell CMU Mk II will be certified July AIRBUS ATSU will be certified September

15 b – Route Charge scheme 2 Step Incentive Scheme 25% 75% equipage 2006/ Pioneers Incentives Earlier Benefits Better flight profiles Less misunderstandings Higher Productivity Less delay Equipage=Benefits Forward fitRetro fit ) Combined Scheme a – TEN - for the first 25% Mandatory Carriage

16 AdoptionDELIVERY Initial Plan Mandatory Implementation May 2005 EC gave a Mandate to EUROCONTROL to Develop an Implementing Rule (IR) for Datalink Services EC IR Review Q1 07 IR Delivery Feb 06 RA Consult Regulatory Approach May 06 RA Delivery Draft IR Q4 06 IR Consult SSC LAW

17 May 2 nd RA Workshop Services Alternative 3Alternative 1Alternative 2 IR MoC=Means of Compliance Technology Open MoC 1 Eurocontrol Spec At time T1 ATN/VDL M2 MoC 2 At time T2 FANS Acc ATN/VDL M2

18 ATC Centre A/G Comms Service Providers Aircraft VDL2 Interoperability : Alternative 1 Procedures FDP Procedures CPDLC Service ATN LRUs Wideband? VDL2 Antennas SPECTRUMSPECTRUM VHF Band X ATN Front End e.g. Wideband CMU/ATSU IP? CPDLC Service IP? IR IR+MOC 1 (now) IR+MOC 2 (2020+)

19 IR Development - Next Steps May 06 RA Delivery Dec 06 Formal Consultation (TBC) Update RA and SOR (Summary of Responses) Draft IR and JM (Justification Material) DraftFinalReport

20 Datalink IR Expectations (subject to consultation) Service set not Exclusive LINK Services Implementation Dates Set (Air/Ground) FANS issues will be addressed Airspace Definition Baseline Technology ATN/VDL Mode 2 Politics Technology Extensible

21 Other Regions Federal Aviation Administration JAPAN

22 Summary Good Progress Other Regions becoming active Pioneer Scheme Highly Successful LINK set to Emerge from the Pioneer Phase

23