EUROCONTROL Experimental Centre EUROCONTROL Navigation Domain The Data Collection Network: EGNOS revealed GNSS 2004 – Rotterdam, The Netherlands Santiago.

Slides:



Advertisements
Similar presentations
GPS and EGNOS in the EUR-SAM CORRIDOR
Advertisements

B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
SAFETY MANAGEMENT WORKSHOP
1 Reporting April Safety Policy Regulator Service Provider Service Provider Service Provider Regulator to established SRF to harmonize reporting.
© Integra A/S SAFETY MANAGEMENT WORKSHOP Karachi - January 2006 PRESENTERS: PETER THORSEN STEFAN REIB.
The Safety Analysis Methodology EHEST Conference 13 October 2008 Cascais, Portugal.
1 Santiago Soley Pildo Executive Manager Latino Consortium Manager Prepared by Carine Saut - Latino Coordinator Galileo: a cooperation frame with Latin.
Conference on the simplification of the Common Agricultural Policy A simple CAP for Europe-a challenge for all Brussels, 3-4 October 2006 DG AGRIs assessment.
ICAO TEM/NOSS Symposium November 2005
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
EGNOS Project Office EGNOS Demonstration in CHINA 1 EGNOS Training Course EGNOS Demonstration in China EGNOS Demonstration in China O. Perrin, Tianjin,
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
GNSS Data Analysis with PEGASUS
Dakar 17,18 Novembre 2003 EGNOS: Institutional aspects.
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
Service Technique de la Navigation Aérienne NexSAT: Institutional aspects 20 may, 2003 STNA/31 The EGNOS example: the issue The good example: The Tripartite.
The European Organisation for the Safety of Air Navigation dynamic Demand Capacity Balancing WP Marcel RICHARD Expert ATFCM Operational Specifications.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Whole Airspace ATM System Safety Case - Preliminary Study
FAA/Eurocontrol Technical Interchange Meeting on Performance Metrics
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
International Civil Aviation Organization
Air Navigation Services Providers and Airports Liability – Panel III Air Navigation Service Provision by an Intergovernmental Organisation EUROCONTROL.
EUROCONTROL Experimental Centre PEGASUS: A frame for GNSS Data Evaluation ICCAE Course – Software Outline.
J. Ádám, B. Takács, K. Kratochvilla, P. Zaletnyik, & Sz. Rózsa – BUTE R. Farnworth & S. Soley - Eurocontrol EEC P.B. Ober - Integricom EGNOS data collection.
Aviation Benefits of GNSS Augmentation Workshop on "GNSS Applications for Human Benefit and Development“ Prague, Czech Republic September 2010 Jeffrey.
1 SaPPART Satellite Positioning Performance Assessment for Road Transport François Peyret (chair) IFSTTAR - Centre de Nantes, France
Satellite-Based Augmentation Systems (SBAS) Combined Performance
Aviation Benefits of GNSS Augmentation Workshop on the Applications of GNSS Chisinau, Moldova May 2010 Jeffrey Auerbach Advisor on GNSS Affairs Office.
1 Enabling EGNOS Approaches in the MEDA Region METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18 November 2009 Víctor Álvarez, Josep Montonlio,
SESAR Single European Sky Air traffic management Research
‘One Sky for Europe’ EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 VALIDATION DATA REPOSITORY Overview.
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
Availability of the EGNOS service for land mobile user Pavel Kovář, Libor Seidl, František Vejražka Czech Technical University in Prague Faculty of Electrical.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
1 SBAS Implementation in the Regions of ACAC and ASECNA FP7-GALILEO / FP7-GALILEO Project with Community research funding WP2- Service.
February EGNOS Safety of Life service demonstration for Civil Aviation Euromed GNSS II project/MEDUSA.
1 SBAS Implementation in the Regions of ACAC and ASECNA FP7-GALILEO / FP7-GALILEO Project with Community research funding WP2- Service.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Situational Awareness Numerous aircraft and operational displays, when combined with effective and efficient communications and facilities, provide Air.
1 MAINTAINING MET COMPETENCE AT AN AIR NAVIGATION SERVICES PROVIDER Alexandru Hozoc Head of ROMATSA TCAeM.
ASAS TN2 Final Seminar Paris, April 2008 Recommendations by the ASAS Thematic Network Ken Carpenter.
Present and Future of China Satellite-Based Augmentation System China Satellite Navigation Office February 2014.
Ashley Lyon CGSIC May 7th 2006 European Satellite Services Provider “EGNOS Operations Status”
Toulouse, September 2003 Page 1 JOURNEE ALTARICA Airbus ESACS  ISAAC.
Requirements - background
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
ESA Harwell Robotics & Autonomy Facility Study Workshop Autonomous Software Verification Presented By: Rick Blake.
Toward a New ATM Software Safety Assessment Methodology dott. Francesca Matarese.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision TECHNICAL & OPERATIONAL COMPETENCE ATS.
WORKSHOP ON COMMON REQUIREMENTS FOR SERVICE PROVISION  Introduction to SESIS Guidance Material  Gerald Amar, SESIS Project Manager European Organisation.
Module 02 Essential Requirements for ATCOs. Training Objectives  Appreciate the content of the essential requirements for ATCOs as described within EASA.
European Commission 1 Interoperability of Air Traffic Management systems for the Single European Sky.
EGNOS Training Course EGNOS Demonstration in China
GNSS Data Analysis with PEGASUS
EUROCONTROL Navigation Domain
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Juan Vázquez Sanz EUROCONTROL SRU
PRESENTATION OF MONTENEGRO
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
Establishment of Space Weather Information Service
EUROPEAN COMMISSION Satellite-Based Augmentation Systems (SBAS) Combined Performance International Committee on GNSS (ICG-4) Working Group A Saint Petersburg,
EGNOS: Institutional aspects
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Workshop on preparations for ANConf/12 − ASBU methodology
GNSS Approach for General Aviation
Airport Noise Modelling - Overview
Meeting of the Secretariat Friday 4th of July 2003
Presentation transcript:

EUROCONTROL Experimental Centre EUROCONTROL Navigation Domain The Data Collection Network: EGNOS revealed GNSS 2004 – Rotterdam, The Netherlands Santiago Soley, PILDO Labs S.L.

EUROCONTROL Experimental Centre Summary EUROCONTROL: GNSS-1 Operational Validation The Data Collection Network A Methodology to assess EGNOS performance First Glance Anomaly Investigation Towards the Final Results Conclusions and Future Work

EUROCONTROL Experimental Centre The European Organisation for the Safety of Air Navigation 31 Member States EUROCONTROL The European Organisation for the Safety of Air Navigation 32 Member States

EUROCONTROL Experimental Centre GNSS-1 Operational Validation EUROCONTROL will coordinate the GNSS-1 Operational Validation: To support the Member States in achieving the approval for the provision of EGNOS services throughout ECAC (European Civil Aviation Conference) Two distinct areas of work: Technical Validation of the performance - SARPS requirements – RNP values - MOPS DO229C compliant receiver Definition of operational rules and procedures for aircraft to use the system for a particular application (APV implementation)

EUROCONTROL Experimental Centre The Data Collection Network: Objectives Collect ESTB/EGNOS Data and Evaluate them from different sites in Europe Group of experts to support: the development of the tools need in the future EGNOS Operational Validation - PEGASUS definition of data collection and processing procedures Baseline for the future static campaign in the GOV Plan – extended with the Air Navigation Service Providers participation

EUROCONTROL Experimental Centre The Network Hartebeesthoek Kourou IOR PRN131 Höfn Tromsö Hönefoss Rotterdam Scilly Toulouse Malaga Palma Canaries Fucino Matera Ankara ESTB reference station (RIMS) EURIDIS reference station ESTB processing facilities (CPF, MCC) NLES Barcelona Lisboa The Data Collection Network GOV ANSP

EUROCONTROL Experimental Centre Processeddata samples parameters Extrapolation Simulation Confidence Integrity (range) RNP availability Continuity Anomaly investigation System analysis Systembehaviour file watch MT ionosphere ranges clock multipath etc. ContinuityAccuracyAvailabilityIntegrity Data sample filtering (plausibility rules/flag) Actual performance SARPS Thresholds event counting visualisation position domain The Methodology

EUROCONTROL Experimental Centre A First Glance Proposed algorithms A C C U R A C Y A V A I L A B I L I T Y C O N T I N U I T Y I N T E G R I T Y Check against RNP parameters single site/day test fail or pass EGNOS post-SIS1 EEC, April 23 rd, 2004

EUROCONTROL Experimental Centre Summary of results – Vertical Position Error 95%

EUROCONTROL Experimental Centre Summary of results – APV-II Availability (AL 20m)

EUROCONTROL Experimental Centre Anomaly Investigation What to do if some anomalies appear that makes some of the test fail? Just a first check on the obtained performance is not enough to declare the system not compliant with the requirements detailed analysis on what caused a test fail Different methods and techniques used by the Network

EUROCONTROL Experimental Centre Example 1: Jump on the VPE Delft, December 26 th, 2002 Jump on the position error periodically experienced

EUROCONTROL Experimental Centre Example 1: Jump on the VPE Delft, December 26 th, 2002 Multipath Mc combination

EUROCONTROL Experimental Centre Example 2: Integrity Failures Barcelona, February 6 th, 2003 Integrity failures: HPE>HPL

EUROCONTROL Experimental Centre Example 2: Integrity Failures Barcelona, February 6 th, 2003 MT02/03 anomalies Psedorange correction oscillations broadcast in MT02 and MT03 UDREI<12 IODF<3 Psedorange correction oscillations broadcast in MT02 and MT03 UDREI<12 IODF<3

EUROCONTROL Experimental Centre Example 3: Integrity Failures Barcelona, September 12 th, 2002 MT26 anomalies 60 MI in about 500 epochs Ionospheric corrections for all visible satellites PRN17 in red Ionospheric corrections for all visible satellites PRN17 in red

EUROCONTROL Experimental Centre UPC1: Vertical Component Barcelona, May 22 th, 2003 Example 4: Integrity Failures 8 consecutive MI Prefit- residuals

EUROCONTROL Experimental Centre Fast Corrections: UDREI UDREI=14 PRN 29 9 s NO Alarm Conditions (IODF <3 & UDREI<15) NO Alarm Conditions (IODF <3 & UDREI<15) Sudden jump in C1 code Pseudorange for PRN 29. The ESTB declares the sat. as NOT MONITORED (UDREI=14) 9 sec. after. Sudden jump in C1 code Pseudorange for PRN 29. The ESTB declares the sat. as NOT MONITORED (UDREI=14) 9 sec. after. Barcelona, May 22 th, 2003 Example 4: Integrity Failures satellite clock jump Prefit- residuals

EUROCONTROL Experimental Centre 20:40 VPE/VPL Barcelona, November 20 th, 2003 Pref-Res PRN11 PRN16 PRN02 Prefit- residuals Large number of MI Example 5: Integrity Failures 19:17

EUROCONTROL Experimental Centre PRN16: P2-P1 (shifted) PRN16: C1-Rho (shifted) PRN16: L1-L2 (shifted) STEC (m L1) 19:17 20:40 PRN16: STEC +/- UIRE (ESTB) Barcelona, November 20 th, 2003 Example 5: Integrity Failures

EUROCONTROL Experimental Centre 22:00 18:00 20:00 LOW Medium High Very High Extreme October 29-31th November 20-21th Example 5: Integrity Failures Ionospheric storm Kp index from Oct. 17th up to Dec. 1 st 2003 Kp index from Oct. 17th up to Dec. 1 st 2003

EUROCONTROL Experimental Centre To validate SARPS requirements in a reasonable period of time just the data collected from the network would not be enough simulations or other methods – get up to the required level of confidence from the measurements Impossible to do it for all locations under all conditions extrapolation of the local results from the network sites Global Assessment Towards the final results

EUROCONTROL Experimental Centre The Global Monitoring System LINUX Automatic daily processing Slog Automatic data collecting Automatic results presentation BRUS 24h GPS and GEO binary data Receiver Automatic data gathering 24h RINEX files INTERNET WEB server GPS networks PEGASUS

EUROCONTROL Experimental Centre The Global Monitoring System Cross-check with simulations Network results extrapolation Global Assessment HPE 95% & Integrity Events HPL 99% & satellites used

EUROCONTROL Experimental Centre Conclusions Summary of the activities from the Data Collection Network – Eurocontrol gain knowledge on how the data need to be collected, processed and analysed – EGNOS Operational Validation Methodology (3 axis) Actual performance- First glance report System Behaviour - Anomaly investigation Confidence, Extrapolation – Global Monitoring System Dynamic trials

EUROCONTROL Experimental Centre Future Work Improving the network layout and the automation of procedures continuous data logging automated results data sharing - ftp Potential data exploitation and validation of the Global Monitoring System results harmonization with the network sites ones Data campaigns with the first EGNOS SIS reuse of all the ESTB lessons learned expected that the encountered anomalies rarely happen EGNOS SIS-1 confirms that

EUROCONTROL Experimental Centre Questions?