Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Global ATM Operational Concept
ASBU Methodology Summary of Block 2 and 3 Modules Saulo Da Silva
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
Industry Viewpoint – Block 0 Carlos Cirilo Assistant Director Infrastructure Strategy 16 November 2012.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Aviation System Block Upgrades and NAV CANADA Planning 17 November 2012 Pre-AN-Conf/12 Workshop.
ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS
David Gamper, Director, Safety and Technical Affairs ACI World PRE-CONFERENCE WORKSHOP for the ICAO AIR NAVIGATION CONFERENCE ICAO HEADQUARTERS MONTREAL.
NextGen and Its Impact on Performance Worldwide Symposium on Performance of the Air Navigation System ICAO Montreal, Quebec, Canada March 26-30, 2007 Victoria.
SCG/ May 2008 Item 2.2 – AP01 Deployment of the ATM Master Plan IP1 Dimitris APSOURIS EUROCONTROL DAS/SIS.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation.
Technology Roadmaps H. Sudarshan
ICAO Aviation System Block Upgrade Executive Briefing:
Mission Trajectory Step 1 From planning to deployment.
AIM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
Traffic Management and FUA integration
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
ICAO: Global Harmonization Plan
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
Information Management The ICAO Perspective
SESAR and ASAS Opportunity
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
International Civil Aviation Organization ASBU Methodology Summary of Block 0 Modules H. Sudarshan SIP/2012/ASBU/Nairobi -WP/8 Workshop on preparations.
International Civil Aviation Organization Block 0 Overview Halidou Moussa Air Navigation Commissioner International Civil Aviation Organization.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
ASBUs Block 1 Overview The CANSO Viewpoint Eugene Hoeven Director ICAO Affairs ICAO Liaison Office Pre-AN-Conf/12 Workshop Montreal, November 2012.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
1 The model of integrated use of information for provision of aircraft flights Completed by: Kolosok A. Supervisor: Luppo O.E. Модель інтегративного використання.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
Block 0 Overview Halidou Moussa Air Navigation Commissioner
Aviation System Block Upgrades and NAV CANADA Planning
ASBU Methodology Summary of Block 2 and 3 Modules Saulo Da Silva
Collaborative Decision Making (CDM) Saulo Da Silva
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Welcome to the SESAR SWIM Master Class 2013
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Workshop on preparations for ANConf/12 − ASBU methodology
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
AIM Operational Concept
Overview of the Block Upgrades Concept
ASBU Methodology Summary of Block 0 Modules H. Sudarshan
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Agenda Item 1 A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau.
Workshop on preparations for ANConf/12 − ASBU methodology
ANConf/12 – Agenda H. Sudarshan
ATFM IMPLEMENATION IN INDIA – FUTURE PLANS
ASBU Methodology Summary of Block 0 Modules H. Sudarshan
ANConf/12 – Agenda H. Sudarshan
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
4D Trajectory Management
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
Presentation transcript:

Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner International Civil Aviation Organization

Blocks 2 and 3 Block 0 Block 1 Block 2 Block 3 (2013) (2018) (2023) Performance Improvement Areas Block 0 (2013) Block 1 (2018) Block 2 (2023) Block 3 (2028 & >) Airport Operations Globally Interoperable Systems and Data Optimum Capacity and Flexible Flights Efficient Flight Path Preparatory Workshop for AN-Conf/12

Longer-term Objective: High Performance 4 Main Performance improvement areas Airport operations Globally interoperable systems & data Optimum capacity & flexible flights Efficient flight path … increasingly interrelated as ATM is closer to optimum functioning when getting closer to optimum in a complex system, most of the modules in fact impact several performance areas, or apply more and more to all flight phases, especially when considering the trajectory, a continuous object by nature Preparatory Workshop for AN-Conf/12

Preparatory Workshop for AN-Conf/12 Block Maturity Lifecycle Planning Decisions B3 2028+ based on business case and validation results as developed during the previous phase B2 2023 B1 SIMPLIFIED LIFECYCLE V0 Identification of Needs V1 V1 Concept Definition B0 V2 V2 Feasibility R&D V3 V3 Pre-Industrial Development and Integration - V4 V4 Industrialisation Implementation Decision V5 V5 Deployment Decision V6 V6 Operations Operations B2/3 are important to be timely ready. This is also true for Block 1. Adding the different phases justifies why V1 and V2 may need be started now for B3, and why ICAO work may or may not be urgent/intense on some topics. There is unfortunately no universal duration and it is premature in the TT work to have a more precise plan V7 V7 Decommissioning Decision Decision Standardisation activities IOC Initial Operational Capability B2: from 2023 B3: from 2028 & beyond Preparatory Workshop for AN-Conf/12 4

3 Essential Considerations in the Global ATM Operational Concept The network of actors & assets The flight trajectory over time Measured business performance Network Trajectory Performance Informed decisions taken collaboratively on early and accurate information Partnership – Interoperability SWIM and data comm. are cornerstones Preparatory Workshop for AN-Conf/12 5

International Technical Challenges To ensure interoperability, in particular Common time reference New flight plan / flight object (FF-ICE) 4D Trajectory exchange format Information Management (data models, quality of service requirements, sharing rules, distribution process) D/L applications for trajectory data exchange Procedures for delegation ATC/Pilots Time based separations New wake vortex separations based on time Participation of all airspace users Ops changes cannot materialise if not properly supported by the enabling technologies In red, issues solved by previous blocks. Will require new ICAO material and industry standards Preparatory Workshop for AN-Conf/12 6

Preparatory Workshop for AN-Conf/12 Global Perspective Global traffic development spreads the same issues globally -> We need global standards/interoperability, and not wait too long for that -> Too many intermediate steps/standards make evolution more difficult Deployment where and when needed, but based on common principles/rules/data & interoperable technologies -> One size does not fit all -> B2/3 implementation decisions not required now! Importance of MOCs, of demonstrations made in different operating environments, anticipating on deployment conditions Cooperation early in life cycle is more efficient -> Among programmes, within/across regions, with ICAO -> On requirements, R&D activities Preparatory Workshop for AN-Conf/12 7

Block 2 in Perspective Information Network Infrastructure ToC ToD CTA Airport Operations Optimum Capacity and Flexible Flights Efficient Flight Path Globally Interoperable Systems and Data Performance Improvement Areas Information B2-31 – Enabling airborne participation in collaborative ATM through SWIM Network B2-35 – Increased user involvement in the dynamic utilisation of the network ToC ToD B2-05 – Optimized Arrivals in Dense Airspace B2-101 – New Collision Avoidance system B2-15 – Linked AMAN/DMAN B2-85 – Airborne Separation CTA B2-90 – RPA integration in traffic B2-25 – Improved coordination through multi-centre ground-ground integration (FF-ICE/1 & flight object, SWIM) B2-75 - Optimised surface routing and safety benefits B2-70 – Advanced Wake Turbulence Separation Infrastructure Preparatory Workshop for AN-Conf/12 8

From Block 2 to Block 3 Information Network Infrastructure ToC ToD CTA Airport Operations Optimum Capacity and Flexible Flights Efficient Flight Path Globally Interoperable Systems and Data Performance Improvement Areas Information B3-105 – Enhanced operational decisions through integrated meteorological information (near-term and immediate service) B2-31 – Enabling airborne participation in collaborative ATM through SWIM B3-10 – Traffic Complexity Management Network B2-35 – Increased user involvement in the dynamic utilisation of the network B3-05 – Full 4D Trajectory-based Operations ToC ToD B2-05 – Optimized Arrivals in Dense Airspace B2-101 – New Collision Avoidance system B2-15 – Linked AMAN/DMAN B3-85 – Self Separation B3-15 – Integration of AMAN/DMAN/SMAN B3-15 – Integration of AMAN/DMAN/SMAN B2-85 – Airborne Separation CTA B2-90 – RPA integration in traffic B3-90 – RPA Transparent Management B2-25 – Improved coordination through multi-centre ground-ground integration (FF-ICE/1 & flight object, SWIM) B3-25 – Improved Operational Performance through the introduction of Full FF-ICE B2-75 - Optimised surface routing and safety benefits B2-70 – Advanced Wake Turbulence Separation Infrastructure Preparatory Workshop for AN-Conf/12 9

Block 3 in Perspective Information Network Infrastructure ToC ToD CTA Airport Operations Optimum Capacity and Flexible Flights Efficient Flight Path Globally Interoperable Systems and Data Performance Improvement Areas Information B3-105 – Enhanced operational decisions through integrated meteorological information (near-term and immediate service) B3-10 – Traffic Complexity Management Network B3-05 – Full 4D Trajectory-based Operations ToC ToD B3-85 – Self Separation B3-15 – Integration of AMAN/DMAN/SMAN B3-15 – Integration of AMAN/DMAN/SMAN CTA B3-90 – RPA Transparent Management B3-25 – Improved Operational Performance through the introduction of Full FF-ICE Infrastructure Preparatory Workshop for AN-Conf/12 10

B1-30 (Digital information) B2-31 – Enabling airborne participation in collaborative ATM through SWIM B1-30 (Digital information) B3-25 (Full FF-ICE) B2-31 B3-105 (tactical weather) B1-31 (SWIM) B3-5 (Full 4D TOps) Preparatory Workshop for AN-Conf/12 11

B1-30 (Digital information) B3-10 (complexity managemt) B2-35 – Increased user involvement in the dynamic utilisation of the network B1-30 (Digital information) B1-30 B3-25 B3-25 (Full FF-ICE) B1-35 (Network Ops Plan) B2-35 B3-10 (complexity managemt) B2-25 (FF-ICE/1) Preparatory Workshop for AN-Conf/12 12

B3-10 (complexity management) B1-5 (Improved Descent Profiles ) B3-05 – Full 4D Trajectory-based Operations Builds upon the use of 4D trajectories to optimise arrivals in dense airspace (B2/5) as well as collaborative flow & capacity management techniques B2/35. B3-10 (complexity management) B1-5 (Improved Descent Profiles ) B2-31 (Airborne SWIM) B3-5 B2-35 (Network Ops Plan) B2-25 (FF-ICE/1) B3-25 (Full FF-ICE) Preparatory Workshop for AN-Conf/12 13

B1-90 (Initial RPA integration) B2-90 – RPA integration in traffic B2-100 (New CAS) B1-90 (Initial RPA integration) B2-90 B3-90 Preparatory Workshop for AN-Conf/12 14

B1-90 (Initial RPA integration) B3-90 – RPA transparent management B2-100 (New CAS) B1-90 (Initial RPA integration) B2-90 B3-90 Preparatory Workshop for AN-Conf/12 15

Challenges - How to Get There? Technical evolution towards Global ATM Concept Multi-facility (ATC, aircraft, airport) consistency Network-wide effects increase interdependence & sensitivity of solutions to local situations & perturbations Increased cooperation within regions to optimise synchronised deployments Inter-regional flights & cooperation as cement Particular care to non-nominal situations upstream in the work Need for interoperability / new standards Validate, demonstrate, standardise Preparatory Workshop for AN-Conf/12 16

Challenges - How to Get There? Ensure timely success of B0 & B1 As success story of an unprecedented global effort As preparatory/initial steps (not requiring implementation of all modules) To ensure availability of resources Agree on the way ahead and research programme No implementation decision now! Preparatory Workshop for AN-Conf/12 17