P13458 RIT Senior Design Team May 10, 2013 10-10:30AM 09-2030 Dresser- Rand, Painted Post Final Presentation:

Slides:



Advertisements
Similar presentations
The Ten Principles of Material Handling
Advertisements

Lean Manufacturing.
WAREHOUSING MANAGEMENT
>ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
Personal Mobility Lift Capstone Team Members: Jim Folgate Bill Beers Ryan Pelton David Zuercher.
Moments of Inertia Polar moment of inertia – Used when calculating the torsion – Indication of resistance to torsion – Solid Shaft – J = π R 4 / 2 Area.
D-R Compressor Cell RIT Senior Design Team P13458 Week 4 Status Report.
Just-In-Time and Lean Systems
INDUSTRIAL & SYSTEMS ENGINEERING
Just-In-Time “Eliminate Waste”.
R-I-T Project Improvement Project Matthew Bonaventura Jimmy Ichihana Eric MacCormack Cody Rath Colin Roy.
Senior Design: Validation of Design December 15, 2008.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Dr. Muzaffer Kapanoğlu - Decision Support Systems © 2003 MATERIAL HANDLING (Textbook Chapter 5)
MATERIAL HANDLING: PRINCIPLES & EQUIPMENT DESCRIPTION
Manufacturing Engineering Department Lecture 1 - Introduction
Rochester Institute of Technology
Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right amount, in sequence,
Flexible Manufacturing Systems Introduction to FMS/FAS.
Just-In-Time Manufacturing David Comita Arielle Herold Jaslyn Moore Shanelle Williamson.
THE MITCHELL FRAMING SYSTEM A building system that encourages homeowners to have a direct involvement in driving building growth and expansio n Neal Mitchell.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
P13458 RIT Senior Design Team May 3, AM-11AM Dresser- Rand, Painted Post Separables Project Close-out.
Ten Steps to Lean Production Steps to CIM 1.Re-engineer (revisit, replan) the manufacturing system Form U-cells to produce families of parts (clusters)
Unit load principle The unit load is a single item, a number of items or bulk material which is arranged and restrained so that the load can be stored,
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
Chapter 4 Process Design.
Unclassified U.S. ARMY TANK AUTOMOTIVE RESEARCH, DEVELOPMENT AND ENGINEERING CENTER Reverse Engineering Re-defined Requirements TARDEC 25 AUG Presented.
D-R Compressor Cell RIT Senior Design Team P13458 Systems Design Review.
P13458 RIT Senior Design Team March 22, AM-11AM Dresser- Rand, Painted Post Air Bearing System & Layout.
10/13/2015 IENG 471 Facilities Planning 1 IENG Lecture 06 Flow: Quantitatively and Qualitatively Measured.
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
5.3 Equations of Equilibrium
Rotor Cell Productivity Improvement Dresser-Rand Olean, NY January 18, 2013.
CONSISTENTLY COOL BEER GROUP 1 ME 553 Group Members Matt Anderson, Jacky Henderson Gerald Lo, Kenya Maddox.
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
Principles of Plant Layout 1. Principle of integration: A good layout is one that integrates men, materials, machines and supporting services and.
Course of MT- 362 Material Handling Lecture # 3.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
Process Layout Chapter 7 July 20, 2005.
P13458: Dresser-Rand Compressor Assembly Line Team Members: Lauren Kraft –Project Manager, Nick Feng – IE Cole Bowden – ME, Shawn Moseley – ME Jordon Boggs.
Manual Material Handling and Ergonomics… Two Auto Assembly Case Studies CCOHS / CRE-MSD MMH Workshop March 4, 2008 Wyatt Clark, CAW National Ergonomic.
Operations Management Optimising operations. The aim of an OM system is to extract maximum productivity and quality from the production process. This.
ENGR 211 Bridge Design Project
11-IE IE IE-60  Facilities design for manufacturing systems is extremely important because of the economic dependence of the firm.  Facility.
IN MODULAR CONSTRUCTIONS
TVAC Trolley Design Review1 GLAST LAT Project8 September 2005 TVAC Trolley Design Status Review 8 September 2005 TVAC Trolley Design Status Review 8 September.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Problem Statement & Conceptual Designs September 6, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
Blocking a b c d.
Part 3.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Material handling. Haynes defines “Material handling embraces the basic operations in connection with the movement of bulk, packaged and individual products.
Constraints Space Load Capacity Costs Operating hours.
Chapter 3 MANAGING THE TRANSFORMATION PROCESS
Process Layout Chapter #6.
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
SBN Far Detector Installation & Integration
Production and Operations Management Function
RIT Senior Design Team P13458 Systems Design Review 1/18/13
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
Flexible Manufacturing Systems
SENIOR DESIGN PROJECT P08455
Systems Design Review 1/21/13 Attendees:
1. 2 Operational Efficiency and Business process Performance Operational Efficiency and Business process Performance Just in Time Systems (J I T) Reductions.
Presentation transcript:

P13458 RIT Senior Design Team May 10, :30AM Dresser- Rand, Painted Post Final Presentation: Compressor Transport System & Layout

Agenda Problem Statement Accomplishments For The Transport System Design History Final Design Summary Of Test Results Recommendations Accomplishments For The Layout Design History Final Design & Test Results Recommendations Reflection On The D-R/RIT Partnership Reflection On Our Code Of Ethics

Problem Statement Design a flexible material handling system that is easy to use and incorporates the safest design elements within cost and functionality constraints. This design fully supports the new process layout in Dresser-Rand’s strategic project to increase capacity for the MOS compressor projected sales. New Shop Floor 6-throw MOS Compressor

Transport System Design History Design Considerations Long Beam Caster System Short Frame Caster System (Yellow Frame) Air Bearing Technology Free Support System Fixed Support System Modified Support System

Design Considerations MovementPropulsion

Long Beam Caster System Assumed entire compressor assembly would be loaded, including cylinders Assumed massive CG changes while loaded Large structural members necessary

Short Frame Caster System Yellow Frame Design Versatile – to account for multiple product families Modular – to account for multiple product sizes Could not be used at test station Was prototyped Many design flaws surrounding caster system

Air Bearing Technology Unidirectional Nearly frictionless Reduces horizontal force required to 1lb per 1000lbs Air supply is common in industrial setting Requires flat, smooth floor surfaces

Free Support System Based on the short frame system Adapted for air pallet use Legs fixed to support beam Concerns regarding clearance between floor and legs during movement

Fixed Support System Vertical “legs” of the Free system are now fixtures placed at each station Eliminates floor clearance concerns while moving from station to station Simplifies manufacturing Easily integrated into testing and shipping

Removable Support System Conceptual design Method of manufacture and dimensions undetermined Removable fixture attaches to beam and acts like a jack stand Overcomes flaws that were revealed during the 3P event Stress analysis not completed results should be comparable to the free system results

Removable Support Qualities Pros No more fixtures Resolves ergonomic issues discovered during the 3P event Lowers move prep time – no longer need to configure fixtures from station to station Bolt on legs removable for test and shipping Cons Requires the floor to be leveled

Test Results

Recommendations Modify testing station to incorporate free-system design Possible lifting/attachment to test bed Determine lifting/loading method Need 3-axis positioning without a crane Modified Grey Portable Lifting system for vertical lifting Back truck under lifted compressor Air bearings under truck bed Driver positioning

Layout Design History Took dimensions of required equipment and space for each station in the assembly, test, and paint process in the current state Created factors of varying importance Designed 4 different layouts – 2 straight-line, 2 U-shaped – in the new shop floor Conducted a 3P event on a U- shaped layout using cardboard to check theoretical values against actual feedback from operators and line side managers 3P Event ResultFactors AffectedStatus Tested U-shape design Returnability Flexibility Pass-by/Pass-through Added new cylinder assembly flow line Space Utilization Inventory Access Operators and managers evaluated the layout and gave feedback on parts and people flow and equipment requirements Inventory Access Ease of Movement by Operator Movement Time Found hidden problems and constraints i.e. spacing between stations, jib crane requires oil pump station next to column Space Utilization Maintenance Access Tested – good outlook Needs further testing, but predict a good outlook Needs attention, was not addressed

Final design Top Level Assembly Level Flow

Recommendations Re-evaluate test bay requirements for sizing and safety – retractable blast walls Add in and test inventory flow and information flow Understand exact requirements and locations for energy/power/air sources Full dimensioning of layout Computer simulation of process flow Continuous evaluation and improvement 5S taping and marking to indicate specific areas, i.e. operator walking zone inside cell, in-process kanban, visitor aisle way Identify and allocate future expansion area

Reflection on the DR/RIT Partnership Overall, very successful learning experience Design process Iterative in nature – lots of ‘back to the drawing board’ moments Conceptualization and the funnel of idea development Understanding fluctuating customer needs Efficiency of communication Recommend a “consulting” contract be completed at the start To better establish the needs of Dresser Rand So the team can better prioritize efforts Recommend creating a communications protocol to prevent delay in work as the team awaits feedback

Reflection On Our Code Of Ethics 3 out of 11 components were not followed satisfactorily