ICAO EUR/NAT PBN Regional Implementation

Slides:



Advertisements
Similar presentations
GPS and EGNOS in the EUR-SAM CORRIDOR
Advertisements

B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
MINIMUM NAVIGATION PERFORMANCE SPECIFICATION AIRSPACE (MNPS)
Regional RAIM Prediction System – Progress Report
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
Status of the ICAO Universal Safety Oversight Audit Programme Audits completed 179 * Interim reports178 Action plans173 Summary reports169 Audit follow-ups52.
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Performance based communication and surveillance
Introduction to Navigation Specifications
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Planning and implementation
Overview of Continental En-route Navigation Specifications
Frequency Management Group Chairman
1 ICAO WGN New Orleans Nov Programme Overview Incentives and a Mandate Issues Conclusion Contents.
ICAO Harmonized Safety Management Requirements – The Safety Concern ICAO Harmonized Safety Management Requirements – The Safety Concern Captain Daniel.
Erwin Lassooij PBN Programme Manager 30 January 2014
Javier Perez Diestro Air Navigation International Director
Global Operational Data Link Document (GOLD)
Overview of the PBN Airspace Implementation Processes
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
International Civil Aviation Organization Establishing and Sustaining an RSOO: Enablers, Obstacles and lessons learnt Meshesha Belayneh Regional Director,
PBN ICAO HQ Activities Overview
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
1 PP 48 Use of GNSS distance instead of DME B. Rabiller CNS-ATM steering group meeting Gatwick February 2008.
Procedure Design Considerations
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
Pan regional ICD for AIDC structure and status (SP/09)
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
International Civil Aviation Organization European and North Atlantic Office 1 ICAO EUR HLSC Preparatory Seminar 9-11 February 2010 Baku, Azerbaijan Theme.
USER COMMUNITY NAVIGATION TRANSITION PLAN 19 TH ANNUAL FAA/JAA INTERNATIONAL CONFERENCE June 3-7, 2002 Phoenix, Arizona Presented by Frank Alexander Northwest.
International Civil Aviation Organization European and North Atlantic Office Outcome of the ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June – 1 July 2010.
APAC PBN Seminar F.LECAT (ICAO)
Presented to: By: Date: Federal Aviation Administration Transition to RNP 4/10 (MNPS to PBN) OSWG Gordy Rother and Kevin Kelley 10/8/2014 North Atlantic.
APAC PBN Seminar, Bangkok, 8-10 June 2015 The Business Aviation Perspective presented by Captain Gabriel Thomas Boyda / MJETS* representing the International.
European Capital Cities Quiz. What is the capital of France? a) Berlin b) Bern c) Madrid d) Paris.
Area Nav: RNP Evolution
Performance Based Navigation
North Atlantic Systems Planning Group (NAT SPG)
Presented by the President of the Air Navigation Commission
Introduction to PBN Seminar ICAO PBN Implementation 1.
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
International Civil Aviation Organization European and North Atlantic Office 1 ICAO EUR HLSC Preparatory Seminar 9-11 February 2010 Baku, Azerbaijan Theme.
Requirements - background
From RNP Divergence to Performance Based Navigation Convergence
International Civil Aviation Organization European and North Atlantic Office SAFETY MANAGEMENT The ICAO perspective Michel Béland ICAO Regional Safety.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO and.
ICAO SAR Regional Framework “AVIATION SAFETY FOR OFF-SHORE OPERATIONS/ SEARCH AND RESCUE” 19 May 2016ICAO EUR/NAT Office1 Mr. Celso FIGUEIREDO Regional.
Transition to RNP 4/10 (MNPS to PBN)
APAC PBN Seminar F.LECAT (ICAO)
PBN development in France
Vertical, lateral separations based on time / distance
Performance Based Navigation The Future
ICAO EUR/NAT PBN Regional Implementation
Overview of Continental En-route Navigation Specifications
Erwin Lassooij PBN Programme Manager 30 January 2014
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
Performance based communication and surveillance
Performance-Based Communication and Surveillance (PBCS)
Performance Based Navigation: Navigation Specifications
Regional RAIM Prediction System – Progress Report
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO.
SEPARATION Module 1, Topic 1.
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
RNAV and RNP Strategy in Japan
Oceanic and International Operations
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Presentation transcript:

ICAO EUR/NAT PBN Regional Implementation Introduction to Performance Based Navigation Seminar Baku, Azerbaijan 15 to 18 April, 2008

NAT Region MNPS implemented 30 October 1980 MNPS Airspace Reduced track spacing from 120 to 60NM MNPS Airspace Between FL285 and FL 420 within the Oceanic Control Areas of Santa Maria, Shanwick, Reykjavik, Gander Oceanic and New York Oceanic, excluding the area west of 600W and south of 38030’N The ICAO EUR/NAT region is one of pioneers of the performance based navigation. If we look back in history , the requirement for a given standard of navigational performance was recognised long time ago. This sprung introduction of MNPS in NAT in 1976 to enable a reduction in lateral separation from 120 to 60 NM. In effect the MNPS was a forerunner of the PBN. It took into account reliability, availability as well as accuracy of navigational information into account by setting out a requirement for the carriage of spesific nav equipment, An aircraft which is approved for operations within NAT MNPS airspace shall have a nav performance capability as listed on the current slide. 18/04/08

NAT Region Minimum Navigation Performance Specifications the standard deviation of lateral track errors shall be less than 6.3 NM (11.7 km); the proportion of total flight time spent by the aircraft 30 NM (55.6 km) or more off the cleared track shall be less than 5.3 x 10-4; and the proportion of total flight time spent by the aircraft between 50 and 70 NM (92.6 and 129.6 km) off the cleared track shall be less than 13 x 10-5. Effectively equivalent to RNP value of 12.6 An aircraft which is approved for operations within NAT MNPS airspace shall have a nav performance capability as listed on the current slide. 18/04/08

NAT Region Integrity maintained by: RNAV 10 (RNP 10) procedures for aircraft approval and operations continuous monitoring RNAV 10 (RNP 10) Planned implementation 5 June 2008 New York Oceanic control area outside the MNPSA Further harmonisation with the ICAO PBN is being considered (RNP 4, future RNP 2) Integrity- continuous monitoring by CMA(function is coupled with RVSM monitoring) Transition to PBN has commenced. SUPPs PFA is in process to ntroduce RNAV10. Further consideration is considered with two options- either RNP4 or RNP2 to meet specific separation minima requirements 18/04/08

EUR Region B-RNAV (Basic RNAV) implemented 23 April 1998 mandatory as the primary means of navigation in the majority of the en-route airspace Identical to the RNAV 5 specification in ICAO PBN Manual All new approvals/implementations should be RNAV 5 Now getting closer to the area of this workshop coverage where PBn deployment is rather advanced as well. BRNAV (RNAV5) is mandatory as a primary means of navigation in the majority of the ICAO EUR airspace. It was introduced to enable capacity gains and requires aircraft conformance to a track keeping accuracy of 5NM for at least 95% of flight time. Identical to RNAV5. It should be emphasised that as a first step to harmonisation with PBN provisions, all new approvals/implementations are encouraged to be RNAV5 18/04/08

EUR Region P-RNAV (Precision RNAV) implementation ongoing step towards RNP 1 is being considered applied whenever RNAV terminal area procedures, excluding the final and missed approach segments, are used To be implemented where RNAV operations are required in TMA P=RNAV which is similar but not exactly identical to RNAV-1 is applied whenever RNAV terminal area procedures, excluding the final approach and missed approach segments, is used. P-RNAV is not mandatory and a transition to RNP1 is being considered As a first step to harmonisation we urge that all new approvals and AIP publications should be RNAV 1 Similar, but not equivalent, to the RNAV 1 specification in ICAO PBN Manual For purpose of global harmonisation all new approvals and AIP publications should be RNAV 1 18/04/08

EUR Region Doc 7030 provisions BRNAV(RNAV 5) Applicable in FIRs/UIRs: Amsterdam, Ankara, Athinai, Barcelona, Baku, Berlin, Bodø, Bordeaux, Bratislava, Bremen, Brest, Brindisi, Bruxelles, Bucuresti, Budapest, Canarias (AFI area of applicability), Casablanca, Chisinau, Düsseldorf, France, Frankfurt, Hannover, Istanbul, Kharkiv, København, Kyiv, Lisboa, Ljubljana, London, L’viv, Madrid, Malta, Marseille, Milano, München, Nicosia, Odessa, Oslo, Paris, Praha, Reims, Rhein, Riga, Roma, Rovaniemi, Scottish, Shannon, Simferopol, Skopje, Sofia, Stavanger, Sweden, Switzerland, Tallinn, Tampere, Tbilisi, Tirana, Trondheim, Tunis (FL 245 and above), Varna, Vilnius, Warszawa, Wien, Yerevan, Zagreb Relevant provisions are in Doc7030 since 1998. The latest amendment was inclusion of the Southern Caucasus FIRs. 18/04/08

EUR Region RNP 5 applies to operations conducted under IFR on designated routes within: Amman, Beirut, Cairo, Damascus and Tel Aviv FIRs Transition to RNAV 5 is planned for MID Region Also RNP5 is applicable in the following FIRs which are not part of the ICAO EUR Region but are covered by the SUPPs provisions. Must be noted that RNP5 was sort of historical impasse and transition to PBN compliant system is envisaged in the MID region 18/04/08

EUR Region PBN is planned for implementation in other parts of the ICAO EUR region PBN should be considered by all States in the ICAO EU/NAT for implementation. 18/04/08

ICAO Assembly resolution A36/23 Complete Regional and State PBN Implementation plans by 2009: To achieve RNAV and/or RNP for en-route and terminal operations in line with the implementation plan; and Implement APV (BaroVNAV and/or GNSS) by 2016 30% by 2010 70% by 2014 ICAO to develop a coordinated action plan to assist States on the global and regional level Assembly resolution 36-23 provides the following accelerated timelines for PBN implementation in 2 aspects; PBN enroute&terminal and APV. It also instructs ICAO Regional offices to assist States in developing a coordinated implementation plan, devise a progress monitoring mechanism and inform Council about any deficiencies encountered in the deployment process. 18/04/08

ICAO EUR/NAT Action Plan EANPG to coordinate PBN implementation in the ICAO EUR Region by: addressing APV planning & implementation aspects addressing PBN implementation in the Eastern Part of the ICAO EUR Region Harmonisation of existing implementations with PBN In the NAT Region the programme is managed through existing working arrangements NAT SPG (ATMG, FIG etc) EANPG undertook the following actions in response to A36-23: AWOG takes up an initiative to review the relevant provisions of the EUR ANP/FASID with particular emphasis on APV, The AWOG also undertook a comprehensive initiative to study the current status of APV implementation, analyse existing plans, develop a coordinated implementation plan and establish a monitoring mechanism. Possible working arrangements to address PBN for enroute&terminal in the Eastern part of the EUR are examined. harmonisation of EUR/NAT implementations with PBN provisions duplication has to be avoided 18/04/08

Thank you 18/04/08