FANS (Future Air Navigation System) Flight Crew Procedures

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
SIP/2012/ASBU/Nairobi-WP/19
Introduction to Required Communication Performance (RCP) and Required Surveillance Performance (RSP) Read Slide. SOCM/2 Christine Falk 8-10 February.
ATS DATALINK CENTRAL REPORTING AGENCY ACTIVITIES
1 Air-Ground Integration Ed Bailey, Airborne Project Leader & Ian Wilson, PATs Project Leader.
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Michigan Electronic Grants System Plus
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Year 6 mental test 5 second questions
ZMQS ZMQS
ATN99 International ConferencePage September 1999 London ATN99 INTERNATIONAL CONFERENCE September 1999 London Paul Hennig, United Airlines.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
07/30/ ODE, Office for Child Nutrition Completing Commodity Orders.
ABC Technology Project
© DLR, Institute of Flight Guidance ASAS Thematic Network 2 nd Workshop 6-8 October 2003 – Malmö Session 1 – ATSA Application Track Bernhard Czerlitzki.
© S Haughton more than 3?
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Free Flight with Airborne Separation will result in an uncontrolled,
VOORBLAD.
International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012.
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
Squares and Square Root WALK. Solve each problem REVIEW:
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
- 1 - Defense Security Service Background: During the Fall of 2012 Defense Security Service will be integrating ISFD with the Identity Management (IdM)
How Cells Obtain Energy from Food
McGraw-Hill©The McGraw-Hill Companies, Inc., 2001 Chapter 16 Integrated Services Digital Network (ISDN)
TCP/IP Protocol Suite 1 Chapter 18 Upon completion you will be able to: Remote Login: Telnet Understand how TELNET works Understand the role of NVT in.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
CPDLC / ADS Introduction 4/22/ :49 AM
CPDLC / ADS Operations 4/22/2017 2:35 PM
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
CY Segment 1 Phase 1 Tower Services Initial En Route Services Departure Clearances (DCL) Transfer of Communications Initial Check-In.
Page 1 July 28, 2003 Richmond Facility ATN 2003 IEE London Raytheon Integrated Data Link–RIDL
Page 1 Contents Overview of ‘Quick Start Training’ Overview of Dlink+ w/CPDLC Basic Operation of Dlink+ w/CPDLC CPDLC Basics/Operational Scenarios – Connecting.
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
Air Traffic Control Communication
FANS (Future Air Navigation System) Flight Crew Procedures
Presentation transcript:

FANS (Future Air Navigation System) Flight Crew Procedures Brad Cornell Flight Deck / Flight Crew Operations 7 February 2012

What is FANS? Future Air Navigation System GPS - Navigation Inmarsat Comm Space Air Ground Pieces of the system 3/28/2017

ATC versus AOC ATC AOC 20 55 FANS Protocol Defined Messages CLIMB TO AND MAINTAIN [altitude] CROSS [position] AT [speed] 95% within 60s AOC Free text Multiblock Messages 1,000 characters 777, 787, A380 generates many multiblock messages No time requirements 20 55 3/28/2017

FANS Flight Crew Procedures Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures Section 5 of the Global Data Link Document (GOLD) Overview Logon Uplinks Downlinks Automatic Dependant Surveillance Position Reporting 3/28/2017

FANS Flight Crew Procedures Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures Overview Data Link requires different flight procedures between the pilot flying and pilot not flying than are used for voice (very important) Internal training program for FANS and integration with LOFT Requires operational approval from state authorities Operational approval enables regulators to ensure operators have an adequate training program and that the training program follows GOLD procedures. When to use CPDLC and when to use voice communicaitons 3/28/2017

FANS Flight Crew Procedures Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures Logon Unlike ACARS to establish a CPDLC connection the flight crew must “Logon” to an ATC facility to establish a CPDLC connection Procedures cover logging on when on the ground, after departure, and when entering a FANS capable FIR Procedures also cover automatic “handoffs” between FIRs and handoff failures 3/28/2017

FANS Flight Crew Procedures Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures Uplinks Once a CPDLC connection has been established CPDLC messages can be exchanged between the aircraft and ATC Each ATC data link (CPDLC) uplink message is annunciated to the flight crew using an aural and visual indication Unlike voice communication CPDLC requires BOTH flight crew to read the uplink silently to maintain situational awareness If reports are requested by ATC they should be responded to using CPDLC preformatted report messages not FREE TEXT Crew training material should highlight and develop special procedures for use of Conditional Clearances Note: The Boeing 787 has a built in conditional clearance monitor function and the Boeing 777 has a crew reminder function that can be used to remind crew of conditional clearances 3/28/2017

FANS Flight Crew Procedures Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures Uplinks - continued Free Text has been and continues to be a problem with flight crews. Each operator’s training program should highlight and remind flight crew’s on the use of free text. Preformatted messages should be used AT ALL TIMES in stead of typing out the same message using Free Text 3/28/2017

FANS Flight Crew Procedures Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures Downlinks Once a CPDLC connection is established the flight crew can create and send a “downlink” ATC message by using the pre-formatted message pages. Preformatted messages should be used AT ALL TIMES in stead of typing out the same message using Free Text To avoid potential ambiguity, the flight crew should avoid sending multiple clearance requests in a single downlink message 3/28/2017

FANS Flight Crew Procedures Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures Uplinks Once a CPDLC connection has been established CPDLC messages can be exchanged between the aircraft and ATC Each ATC data link (CPDLC) uplink message is annunciated to the flight crew using an aural and visual indication Unlike voice communication CPDLC requires BOTH flight crew to read the uplink silently to maintain situational awareness Crew training material should highlight and develop special procedures for use of Conditional Clearances Note: The Boeing 787 has a built in conditional clearance monitor function and the Boeing 777 has a crew reminder function that can be used to remind crew of conditional clearances 3/28/2017

FANS Flight Crew Procedures Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview...............................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon.....................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures Logon Unlike ACARS to establish a CPDLC connection the flight crew must “Logon” to an ATC facility to establish a CPDLC connection Procedures cover logging on when on the ground, after departure, and when entering a FANS capable FIR Procedures also cover automatic “handoffs” between FIRs and handoff failures 3/28/2017

747-400 FANS Interface 737NG, 757, and 767 are Similar FMC Forward CDU Functions FMC Company datalink (ACARS) ATC datalink SATCOM CMC AOC AFT CDU Functions Point out Navigation display and alert section. ACMS Company datalink (ACARS) CMC SATCOM

747-400 Implementation ATC Data Link Uplink Annunciation Loadable Clearances Armed Reports Position Reporting ATC Message Log Let’s talk specifically about the implementation of data link in the 747-400 Uplinks annunciated on forward EICAS display and have a chime. Many of the clearances can be directly loaded into Flight Management system thereby reducing entry errors. ATC requested reports (REPORT PASSING) can be armed by the flight crew and the system will automatically send them down when required. There is a log available to the flight crew so they can see what things have been sent up and see a history of their responses.

ATC Data Link Airplane Requests Clearance Review Send to ATC This is a clearance page. Can ask for altitude, new speed, an offset (to avoid weather), or a whole new route. They can enter what they want, review it, and send it to the controller.

AOC Data Link Accessible via MCDU key Route Uplinks Wind Uplinks Position Reports Route Data Reports AOC data link is the communication between the airplane and the airline flight planning system. Receive route uplinks and new wind models. Route uplinks will generally be sent to the ATC controller as a route clearance request. They can also send position reports directly back to the airline.

777 FANS Interface Centralized alerting Accept / Reject / Cancel Switches Automatic ATC uplink display Large format displays Common interface for both Company and ATC Common user interface with other function - ECL Read chart Crew Reminder Function can be used for conditional clearances

787 FANS Interface Centralized alerting Accept / Reject / Cancel Switches Automatic ATC uplink display Large format displays Common interface for both Company and ATC (FANS and ATN) Common user interface with other function - ECL Read chart Conditional Clearance monitor

777 FANS 1 Implementation MFD display Cursor Control Selection Functionally similar to 747-400

777 FANS 1 Implementation Full Display of uplink Color coded display Action selection via CCD

777 FANS 1 Implementation Route Request via MFD Form Most pilot selections via form

Questions? 3/28/2017