CEOS WG Disasters Report Ivan Petiteville, ESA SIT Workshop Agenda Item # 7 e CEOS Action / Work Plan Reference CEOS SIT Technical Workshop EUMETSAT, Darmstadt,

Slides:



Advertisements
Similar presentations
Global Platform for Disaster Risk Reduction, June 2009, Geneva Special event: Accessing space-based information to support disaster risk reduction,
Advertisements

© GEO Secretariatslide 1 Space-based information for reducing loss from disasters Veronica Grasso GEO Secretariat
DS-01 Disaster Risk Reduction and Early Warning Definition
Slide: 1 Guy Seguin (CSA) CEOS Disaster SBA Team Coordinator Priority Actions GEO Disaster WP
NEEDS AND REQUIREMENTS FOR METEOROLOGICAL AND CLIMATE INFORMATION IN SUPPORT TO HUMANITARIAN AGENCIES – SUMMARY OF INITIAL EVALUATION CBS (DPFS/PWS) Task.
Agencies’ response to DRM pilot EO data requirements Ivan Petiteville (ESA, Chair WGDisasters) Stéphane Chalifoux (CSA, Vice-Chair WGDisasters) Andrew.
Summary of Supersites discussion at FRINGE 2011 meeting Frascati 21 Sept splinter meeting Chair: Falk Amelung (GEO task leader) Craig Dobson, represented.
USEReST Workshop - Naples, Italy, November 11-14, 2008 The SiGRiS pilot project: producing value-added, EO-based information for the management of the.
World Meteorological Organization Working together in weather, climate and water Panel session on use of satellites in disaster response and mitigation.
Slide: 1 27th CEOS Plenary |Montréal | November 2013 Agenda Item: 30 Stephen Briggs, Stephen Ward Ake Rosenqvist, Eugene Fosnight, Frank Martin Seifert.
Stefano Salvi Chair of the Supersites Advisory Committee Third UN World Conference on Disaster Risk Reduction, Sendai, March 2015.
The role of the GEO Geohazards Community of Practice for the Supersites Initiative The role of the GEO Geohazards Community of Practice for the Supersites.
23 rd September 2008 HFA Progress Report Disaster Risk Reduction in South Asia P.G.Dhar Chakrabarti Director SAARC Disaster Management Centre New Delhi.
Climate change and Environmental Degradation Risk and Adaptation assessment Step 2 Collect scientific information.
Serving society Stimulating innovation Supporting legislation The Global Flood Partnership bridging the gaps from science to operations.
CEOS Response to the GEO Disasters Task Guy Seguin CSA CEOS SIT-28 Meeting Hampton, Virginia, USA Date.
# 1 CEOS Agencies’ Support to Disaster Risk Management (DRM) Stephen Briggs, ESA Earth Observation Programmes.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Klaus Schmidt, Dr. Jörn Hoffmann, DLR CEOS Support to the Geohazard Supersites The CEOS Supersite.
1 Long-term sustainability and business issues for volcanoes, landslides, subsidence, and forest fires. Hints from the downstream projects DORIS, EVOSS,
NOAA’s Role in Weather Forecasting and Community Preparedness Decision Support NOAA remains focused on supporting high impact events where weather is a.
IGOS Geohazards: Status and perspectives 3rd International Geohazards Workshop Frascati, ESRIN, 6th November 2007 Hormoz Modaressi Director IGOS Geohazards.
WG Disasters, VCs and Hydromet Hazards SUMMARY Ivan Petiteville, ESA Juliette Lambin, CNES VC / WG Day EUMETSAT, Darmstadt, Germany 16 th September 2015.
Asia Flood Network A Flood Mitigation and Preparedness Program in Asia A. Sezin Tokar, Ph.D. U.S. Agency for International Development Office of U.S. Foreign.
DI Promote the cooperation of national and international agencies towards a multi-hazard approach to address more effectively and systematically.
Geohazard Supersites and Natural Laboratories Jörn Hoffmann, Klaus Schmidt German Aerospace Center (DLR) CEOS SIT-29 Meeting CNES, Toulouse, France 9 th.
CEOS Disaster Risk Management Implementation Phase Status Ivan Petiteville (ESA) on behalf of CEOS DRM Team CEOS SIT-28 Meeting Hampton, Virginia, USA.
GEO ADC meeting, Sep 22-23, 2008 Slide # 1 AG AG Forest Mapping and Change Monitoring LoycheWilkie,Mette (FAO) Adam Gerrand (FAO) Ivan Petiteville,
Partnering to Measure Forest Carbon March, Harnessing the Technical Capacities of the United States U.S. Agency for International Development U.S.
1 Global Wildland Fire Early Warning. 2 Fire Danger maps Typical data flow 1. Collect noon weather observations from WMO centres 2. Transfer data 3. Extract.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
WG Disasters, VCs and Hydromet Hazards Ivan Petiteville, ESA Juliette Lambin, CNES VC / WG Day EUMETSAT, Darmstadt, Germany 16 th September 2015 Committee.
Ivan Petiteville, ESA SIT Workshop Agenda Item # 8 CEOS SIT Technical Workshop CNES, Montpellier, France 17 th -18 th September 2014 WG Issues and Topics.
EPA’s Role in the Global Earth Observation System of Systems (GEOSS)
WGISS Technology Subgroup Report WGISS-29 Bonn, 2010 Nataliia Kussul WGISS.
Economic and Social Commission for Asia and the Pacific ESCAP-ISDR Consultation Meeting on Coastal and Climate Hazards 17–18 September 2009 ESCAP Trust.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
Overview of the GEO Global Agricultural Monitoring (GEOGLAM) Initiative Alyssa Whitcraft GEOGLAM Component 4 Co-Lead GEOGLAM Secretariat & University of.
Committee on Earth Observation Satellites Plenary Agenda Item #3 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November 2015.
Committee on Earth Observation Satellites Ivan Petiteville, ESA Plenary Agenda Item # th CEOS Plenary Kyoto International Conference Center Kyoto,
WA Task Report Prepared by Rick Lawford Presented by Ted Engman February 13, 2008.
3 rd UN World Conference on Disaster Risk Reduction Ivan PETITEVILLE, ESA Chu ISHIDA, JAXA SIT-30 Agenda Item # 6 CEOS Action DIS-7 30 th CEOS SIT Meeting.
Alyssa Whitcraft GEOGLAM Component 4 Co-Lead
Committee on Earth Observation Satellites Chu Ishida, JAXA Plenary Agenda Item th CEOS Plenary Kyoto International Conference Center Kyoto, Japan.
Committee on Earth Observation Satellites Ivan Petiteville, ESA Plenary Agenda Item # th CEOS Plenary Kyoto International Conference Center Kyoto,
WCDRR and CEOS DRM activities Stéphane Chalifoux, WG Disasters Chair SIT-31 Agenda Item # 7 CEOS Strategic Implementation Team ESA/ESRIN, Frascati, Italy.
UN WCDRR Disaster Risk Reduction Organization ESA SIT-31 Agenda Item # 7 CEOS Strategic Implementation Team ESA/ESRIN, Frascati, Italy 19 th -20 th April.
GEO-DARMA Overview, Role of Steering Committee,Cross-cutting Ideas and
CEOS DRM Flood Thematic
CEOS Disaster Risk Management Flood Pilot
Volcano DRM team – 14 May, 2013 – Report to Plenary Session
The Geohazard Supersites initiative improving DRR through better science Stefano Salvi Chair of the GSNL Scientific Advisory Committee.
Satellite EO for Better-Informed Decision Making.
CEOS Working Group on Disasters
CEOS Response to the Sendai Framework
Floods WHY? Most prevalent global disaster – largest number of events and largest number of people affected, greatest economic impact; EO can track.
Charter Executive Secretariat April 8, 2016
Report from the WG Disasters
CEOS Acquisition Requirements and Capacities
Capacity Building Activities at NASA
GEO-DARMA Ivan Petiteville, ESA GEO-DARMA Workshop Cancun, 25 May 2017
Stefano Salvi Chair of the GSNL Scientific Advisory Committee
GEO-DARMA (DIS-15): Status
Capacity Building GFOI SilvaCarbon
Land Cover Land Use Change (LCLUC) training initiatives
Oceans and Society: Blue Planet
Proposed 2019 CEOS chair initiative
WG Disasters Report 2018 SIT TW Simona Zoffoli & WG Disasters Members
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
WG Disasters Observation for Disasters
CEOS strategy for GFOI Phase 2
Presentation transcript:

CEOS WG Disasters Report Ivan Petiteville, ESA SIT Workshop Agenda Item # 7 e CEOS Action / Work Plan Reference CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th – 18 th September 2015 Committee on Earth Observation Satellites

Single Hazard: o Floods, Seismic Hazards & Volcanoes Pilots Multi-Hazard: o Geohazards Supersites o Recovery Observatory Pilot CEOS Activities in Support to DRR

Series of on-going end-to end projects (end in 2017) to demonstrate benefits of satellite EO to ALL DRM phases, with strong user involvement Floods, Seismic Hazards and Volcanoes are progressing very well with several positive feedback from end users. Single Hazard Pilot Projects NASA staff with two Namibian agents (Namibian Department of Water Affairs and Forestry) and one villager Courtesy NASA. Conditions met to start a new pilot focused on landslide following a multi-hazard approach.

4 Several CEOS agencies (NASA, USGS, ESA, CSA, ASI) are or have been involved in various landslide research projects (optical, radar and precipitation based methods). Pooling satellite assets in coordinated framework offers broader range of observations to support research. Take advantage of newly available (e.g. Sentinel-1 and 2, ALOS-2) and planned EO missions (e.g. the NASA-ISRO Synthetic Aperture Radar, NISAR). High priority needs and objectives from user community rather well known Why a Landslide Programme ?

5 Defined through an open review process (the Santorini Conference, 2012): Objective A: o Develop comprehensive EO-based inventories of known landslide hazard areas currently unmapped or insufficiently mapped to better understand the extent of the hazard. Objective B: o Within priority areas, monitor hotspots using regular satellite EO monitoring on a semestrial to monthly basis, using both optical and radar imagery and derived products. Objective C: o Develop outreach programs, capacity building and demonstration projects with national authorities to increase use of EO and promote acceptance of EO as a standard. Objectives of the Landslides community

6 Global Landslide Hazard Distribution, Nadim et al., 2006 Long-term Landslide Priority Areas

7 Priority areas (red): comparison with priority areas of CEOS Pilot on seismic hazards (blue) Large overlap overall. Identical observation requirements (e.g. concerning INSAR). Landslide priorities and Seismic hazards

8 Landslides Pilot users are typically: o Scientists o Civil Protection Authorities o Organisations with a mandate in DRR o Policy Makers & Planners o Citizens o Other end–users Areas identified by preliminary contacts (national users, international organisations e.g. UNITAR, UN ESCAP, etc): o Africa (Uganda, Burundi, Rwanda) o Latin America (Central America/Caribbean) o North America (USA, Canada) o Europe (Italy, Spain, Swizerland, Greece) o South Asia (Nepal, Bhutan) Major landslide near Hiroshima, Japan (72 deaths, 2 missing), August Credit: AFP Landslide Pilot – Who are the Users ?

9 Several agencies interested to cooperate on landslides, induced by geohazards and hydromet hazards: o NASA, ASI, ESA, CNES, CSA and CAS o TBC for USGS, NOAA, DLR and NRCAN Dahlia Kirschbaum (NASA) and Fausto Guzzetti (Director of Italian Research Institute for Geo-Hydrological Protection – CNR) volunteer to co-lead the Landslide Pilot team Project Proposal will be refined and presented to CEOS Plenary for endorsement Landslides Pilot Team

Data delivered to all Supersites incl. last ones endorsed by CEOS : Multi Hazard Pilot Projects – Supersites RADARSAT-2 interferograms ( © NRCAN) Coseismic displacement field (25 Apr. 2015,) M 7.8 Gorkha, Nepal Earthquake, Sentinel-1 images (Apr. 17 and Apr. 29, 2015). Same product with ALOS2 images, (Feb. 21 and May 2, 2015)

RO TEAM: Space agencies: CNES, ASI, DLR, ESA, JAXA, NASA DRM Stakeholders: UNDP, UNOSAT, World Bank/GFDRR. Copernicus EMS Risk and Recovery interested to join. Other partners: CURBE (Univ. of Cambridge), COPE (Univ. of Copenhagen) STATUS: Recovery Observatory ready for triggering since early Collaboration attempted on Cyclone Pam (Vanuatu –Lessons Learned Report with recommendations). Possible further collaboration (Post Disaster Needs Assessments (PDNA) before RO?) late 2015 to establish operational linkages. Updated RO Triggering procedure issued. Significant progress made in past few months on End user product definition, Infrastructure and Licensing issue. Multi Hazard Pilot Projects – Recovery Observatory

FLOODS VOLCANOES SEISMIC HAZARDS Both global and regional activities. Some Pilots’ Success Stories

13 Volcanoes: Calbuco, Chile After 43 years of quiescence, Calbuco, Chile, began erupting on 22 April 2015, with very little warning. Large amount of ash (more than 0.1 km3) with significant impact on air traffic on Chile and Argentina. Several thousand people were evacuated from villages closest to Calbuco. Ash was tracked using data from the pilot and was communicated to VAAC in Buenos Aires. SAR data from the pilot project were used to characterize co-eruption surface deformation, which helps to constrain the location of the magma body that fed the eruption. Other interferograms constrain the deformation to have started no later than 1.5 days before the eruption, and to have lasted no more than 1 day. Partner agencies: SERNAGEOMIN (Chile); Buenos Aires Volcano Ash Advisory Center (Argentina); University of Bristol (UK); Cornell University (USA); NOAA (USA)

14 Volcanoes: Calbuco, Chile Perspective view of deformation at Calbuco as determined from a Sentinel-1a interferogram Coeruptive ascending Sentinel-1 interferograms show deflation with a maximum line of sight change of 12 cm located on the west flank of the volcano.

15 Volcanoes: Calbuco, Chile Observed (left), modeled (center), and residual (right) deformation at Calbuco from a Sentinel-1a interferogram spanning April 14–26, Deformation can be approximated by a source at ~9 km depth beneath the volcano’s west flank. Observatorio Volcanológico de Los Andes del Sur (OVDAS) used this source model to validate their tilt meter records

16 SERNAGEOMIN, Observatorio Volcanológico de Los Andes del Sur (OVDAS) Chile; Observatorio San Calixto, Bolivia; Instituto Geofísico del Perú; Instituto Geofísico de la Universidad Nacional de San Agustín, Peru; Instituto Geofísico, Escuela Politécnica Nacional, Ecuador; Servicio Geológico Colombiano, Colombia Buenos Aires Volcanic Ash Advisory Center, Argentina Instituto nacional de sismología, vulcanologia, meteorología e hidrologia, (NSIVUMEH), Guatemala Instituto Nicaraguense de Estudios Territoriales (INETER), Nicaragua Volcano Pilot: User Communities in Latin America

17 Geographic AreaProductValue Added Partner HaitiFlood extent maps, flood risk maps, landslide maps, flash flood guidance / threat maps, integrated risk assessment platform SERTIT, CIMA, INGV, Altamira, CIMH, RASOR FP7, NOAA/HRC Other Caribbean islands, Central America Flood damage maps, change detection products, co-registered map overlays CATHALAC, CIMH, NASA/GSFC NamibiaFlood extent maps, flood warning products, co-registered map overlays Namibia Hydrology Dept, Namibian Water Authority, NASA Zambezi basinFlood extent maps, flood forecast models, flood hazard maps, flood depth forecasts Lippmann Institute (PAPARAZZI, HAZARD, WATCHFUL), DELTARES, NASA/JPL MekongFlood extent maps, flood risk maps, flash flood guidance / threat maps Mekong River Commission, NASA, NOAA/HRC, USGS, University of South Carolina, Texas A&M Java (Bandung, Jakarta, Cilacap) Flood risk maps, subsidence maps tied to flood risk, tsunami risk maps (Cilacap only), flood extent maps SERTIT, Deltares, CIMA, Altamira, INGV, RASOR FP7 Products used by: national end users, civil protection agencies, World Bank, Red Cross, World Food Program, River Commissions (Kavango, Zambezi, Mekong) Floods Pilot: How Data Are Being Exploited

18 GFMS cited by UN World Food Program: "The Global Flood Monitoring System (GFMS) provides one key step further by indicating how an excess rainfall event will impact river flow, and also whether there is a potential for flooding downstream away from the heavy rain event," said E.Niebuhr, World Food Program. "We check the GFMS nearly every single day to monitor current flood concerns, and also to assist in discovering new flood events that may not have been reported yet or are developing”. Nepal Department of Hydrology and Meteorology and ICIMOD used GFMS data after the Nepal earthquake Floods Pilot: Obj. A Global Component : GFMS

19 LIST flood hazard maps determine flood severity by comparing flood extent in a SAR image with computed extent / return period from simulated historic floods The UN World Food Programme has shown interest Floods Pilot: Obj. B - Southern Africa

20 ALOS ascending ( ) CSK ascending ( ) Difference (CSK- ALOS) (red = increased rate of subsidence) Floods Pilot: Obj. B - South-East Asia

Projected total subsidence by 2021 of up to 2.2 m along main drainage areas. © INGV 21 Other Activities: Consultations on new pilot products with UN, World Bank, and ICRC Asian Disaster Preparedness Center (ADPC, Bangkok Thailand) to setup instance of flood modeling and monitoring processing and distribution software installed under cooperation with SERVIR and USAID Oct-Nov 2015 Floods Pilot: Obj. B - Subsidence Projection

22 Data provided: EO-1, ASTER, COSMO-SkyMed, Sentinel-1, and LANDSAT, plus high-resolution GFMS forecasts Users: FEMA, US Forest Service, EPA, Texas Water Development Board and Texas Commission on Water Quality, plus briefings by UT-Austin personnel to Texas Emergency Operations Center and Governor’s Emergency Management Council Feedback from Theresa Howard and Gordon Wells (UT-Austin): “The imagery offered a detailed view of inundation impacting agriculture in rural areas, which is information that can be difficult to obtain from other sources. The imagery also helps to fill in the coverage gaps between stream gages that are monitored for current and forecast conditions.” Floods Pilot: Obj. B - Texas

23 Floods Pilot: Obj. B - Texas EO-1, 1045 CDT 27 May 2015 Imaged processed by Texas partners COSMO-SkyMed, 2 June 2015 as processed and analyzed by LIST

24 Disaster Component # 5 of the CEOS Work Plan deals with the CEOS Pilots Activities are progressing quite well with all Objectives reached and Deliverables produced as originally planned Current GEO Disasters components will be rearranged in GEO Transitional 2016 WP. GEO-DARMA proposed by CEOS as new GEO initiative for Issues preventing progress: None as of today CEOS Activities in Support to DRR

25 Required steps and/or decisions at next CEOS Plenary: 1.Endorse the updated RO triggering procedure 2.Endorse the creation of a new Pilot on Landslides (in a multi-hazard approach) 3.Endorse the CEOS support to three new supersites (still TBC as proposals still being consolidated): -San Andreas fault (USA), Gulf of Corinth fault zone (Greece), and Straits of Messina (Italy) CEOS Plenary