DRAFT Earth observations for the mitigation of natural disasters: the role of the Group on Earth Observations Supersites Coordination Workshop 10-11 June,

Slides:



Advertisements
Similar presentations
Role of WMO in Natural Disaster Risk Reduction Ivan Obrusník, Czech Hydrometeorological Institute Role of WMO in Natural Disaster Risk Reduction Ivan Obrusník,
Advertisements

Global Platform for Disaster Risk Reduction, June 2009, Geneva Special event: Accessing space-based information to support disaster risk reduction,
LIVING WITH RISK : AN INTEGRATED APPROACH TO REDUCING SOCIETAL VULNERABILITY TO DROUGHT ISDR AD HOC DISCUSSION GROUP ON DROUGHT ISDR TF April 2003.
DS-01 Disaster Risk Reduction and Early Warning Definition
Slide: 1 Guy Seguin (CSA) CEOS Disaster SBA Team Coordinator Priority Actions GEO Disaster WP
Remote Sensing at the service of Natural Disasters Warning: the Contribution of the Supersites Concept Professor Stuart Marsh Co-Chair GEO Institutions.
The GEO Work Plan * 2010 Update (GEO-VI) * New Online Management System Alexia Massacand (Work Plan Coordinator) Rik Baeyens (IT Manager)
G.W ICT for risk management FP6 Strategic Objective ICT for Environment Information Society & Media DG European Commission, Brussels Guy Weets Deputy.
GEO South – Eastern Europe and Eastern Mediterranean Symposium on Earth Observation Services for Monitoring the Environment and Protecting the General.
Agencies’ response to DRM pilot EO data requirements Ivan Petiteville (ESA, Chair WGDisasters) Stéphane Chalifoux (CSA, Vice-Chair WGDisasters) Andrew.
GEO SB-01 Oceans and Society: Blue Planet An Integrating Oceans Task of GEO GEO-IX Plenary November 2012 Foz do Iguaçu, Brazil on behalf of the Blue.
DRAFT Earth observations for the mitigation of natural disasters: the role of the Group on Earth Observations 13 June, 2013 WMO HQ Francesco Gaetani GEO.
AGENDA ITEM 4: FOLLOW-UP ON THE DECISIONS OF THE WORLD METEOROLOGICAL CONGRESS ON THE INTERGOVERNMENTAL BOARD ON CLIMATE SERVICES AGENDA ITEM 4.1: IMPLEMENTATION.
United Nations Environment Programme. UNEP’s Work to Advance the Preparation and Implementation of National Adaptation Programmes of Action 3 September.
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
The EUGENE project and its contributions to the GEO Ministerial 4th GEO European Projects Workshop 29/30 April 2010.
A Roadmap for the GHCP The GeoHazards Community of Practice (GHCP) Presentation developed during the First GHCP Workshop, Paris, January 18-21, 2010.
Flood monitoring for ungauged rivers - Across the globe Beatriz Revilla Romero 1, Jutta Thielen 1, Peter Salamon 1 and Tom de Groeve 1, Damien Raynaud.
Disaster Reduction & Climate Change Adaptation by Fengmin Kan, UN-ISDR Africa Nairobiwww.unisdr.org.
The Group on Earth Observations (GEO) 2015 Work Plan Symposium Barbara J. Ryan Director, GEO Secretariat Geneva, Switzerland 5 May 2015.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
Capacity Building – GEOSS- AIP5 STATUS & PLANS Prepared by Lucia Lovison-Golob Contribution by Luciano Parodi, Pablo Duenas, Stuart Frye.
© GEO Secretariat GEO WP & 2013 GEO priorities for CEOS Support GEO Secretariat CEOS SIT-28 NASA - Langley March 2013.
Building GEOSS Trying to communicate the vision and a coherent work plan.
CEOS Disaster Risk Management Implementation Phase Status Ivan Petiteville (ESA) on behalf of CEOS DRM Team CEOS SIT-28 Meeting Hampton, Virginia, USA.
GEO Geohazard Supersites Current Status and key challenges EGU 2013 Vienna Supersites Splinter Meeting.
U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior U.S. Geological Survey Natural Hazards Science – Reducing the World’s.
© GEO Secretariat Global Datasets (GEOSS task DA-09-03) 3rd GEO European Project Workshop 8-9 October 2009 Istanbul Douglas Cripe, GEO Secretariat.
GEO Work Plan Symposium 2012 ID-03: Science and Technology in GEOSS ID-03-C1: Engaging the Science and Technology (S&T) Community in GEOSS Implementation.
EPA’s Role in the Global Earth Observation System of Systems (GEOSS)
Synthesis of Strategic Issues (Climate, Disasters, Water) and a draft European strategic framework.
What is GEO? launched in response to calls for action by the 2002 World Summit on Sustainable Development, Earth Observation Summits, and by the G8 (Group.
Draft GEO Framework, Chapter 6 “Architecture” Architecture Subgroup / Group on Earth Observations Presented by Ivan DeLoatch (US) Subgroup Co-Chair Earth.
Flash Flood Forecasting as an Element of Multi-Hazard Warning Systems Wolfgang E. Grabs Chief, Water Resources Division WMO.
WGISS Technology Subgroup Report WGISS-29 Bonn, 2010 Nataliia Kussul WGISS.
Water Country Briefs Project Diagnostic Workshop, at WHO, 9-10th December UNISDR Monitoring of Progress in Reducing Risk to Water Related Disasters.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
® GEOSS AIP 5 Water SBA Update HDWG June 2012 Matt Austin NOAA Stefan Fuest KISTERS Jochen Schmidt NIWA.
11-12 June 2015, Bari-Italy Coordinating an Observation Network of Networks EnCompassing saTellite and IN-situ to fill the Gaps in European Observations.
GEO 2014 Work Plan Symposium Opening Remarks Barbara J. Ryan Director, GEO Secretariat Geneva, Switzerland 28 April 2014.
Process and mechanics of HFA progress monitoring and Review Sujit Mohanty, UNISDR Meeting of the ISDR Asia Partnership 24 – 26 March 2010 Bangkok.
What APEC Task Force for Emergency Preparedness (TFEP) has progressed in the implementation of HFA Presented by Vincent Liu Program Director APEC Secretariat.
© GEO Secretariat Collaboration with Partner Organizations – GEO/GEOSS ICG-WIGOS Geneva, Switzerland 18 March 2013 Barbara J. Ryan Director, GEO Secretariat.
Committee on Earth Observation Satellites Ivan Petiteville, ESA Plenary Agenda Item # th CEOS Plenary Kyoto International Conference Center Kyoto,
Yuki Matsuoka The United Nations International Strategy for Disaster Risk Reduction th CEOS Plenary 5 November 2015.
Guatemala Ecuador Jamaica Dominican Rep. Fiji Tonga Nigeria Namibia Mozambique Malawi Cameroon Cabo Verde Togo Burkina Faso Sudan Myanmar Sri Lanka Bangladesh.
Role of Technical Agencies Responsible for Hazard Assessment, Monitoring, Observations, Data and Analysis Dr. David Green National Oceanic and Atmospheric.
Douglas Cripe, GEO Secretariat 3rd African Water Cycle Coordination Initiative Workshop 4-5 February 2013 El Jadida, Morocco Introduction to GEO.
DRAFT Earth observations for the mitigation of natural disasters: the role of the Group on Earth Observations GEO Secretariat.
GEO Disaster Resilience Breakout Group Summary GEO Work Programme Symposium 2016 Kerry Ann Sawyer CEOS/NOAA 4 May 2016 Geneva, Switzerland.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
GFDRR Work Plan April 27, 2016 Luis Tineo
A Presentation to the 2017 GEO Work Programme Symposium,
Albania Disaster Risk Mitigation and Adaptation Project
AmeriGEOSS Regional Initiative A framework that seeks to promote collaboration and coordination among the GEO Members of the American Continent Angelica.
The Group on Earth Observation The water related activities Vanessa Aellen Technical Expert for Water 16 may 2017, Tuscaloosa.
GEO Strategic Plan : Implementing GEOSS
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
GEO-CRADLE: Fostering regional cooperation and roadmap for GEO and Copernicus implementation in North Africa, Middle East and Balkans Funded under H2020.
GEO-DARMA Ivan Petiteville, ESA GEO-DARMA Workshop Cancun, 25 May 2017
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
RA-II/Doc Implementation of the WMO DRR Roadmap in RA II including major activities on DRR Services Alasdair Hainsworth, Chief Disaster Risk Reduction.
The Biodiversity and Protected Areas Management (BIOPAMA) Programme
Oceans and Society: Blue Planet
SESSION I: Governance and Organisational Issues Related to Early Warning Systems for Integrated Disaster Risk Reduction SYMPOSIUM ON MULTI-HAZARD EARLY.
Building a User Driven GEOSS Masami Onoda, GEO Secretariat Workshop at 34th ISRSE, Sydney, Australia 10 April, 2011.
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
Presentation transcript:

DRAFT Earth observations for the mitigation of natural disasters: the role of the Group on Earth Observations Supersites Coordination Workshop June, 2013 Brussels Francesco Gaetani GEO Secretariat

Created in 2005, to develop a coordinated and sustained Global Earth Observation System of Systems (GEOSS) to enhance decision making in nine Societal Benefit Areas (SBAs) GEO today: 90 Members 67 Participating Organizations

 Improve and Coordinate (existing) Observing Systems  Provide Easier & More Open Data Access  Foster Use (ST Applications)  Build Capacity for the use of EO data GEOSS is being built from the expansion and interlinking of existing observation and information systems and the investments of Members and Participating Organizations in new systems. GEO Objectives

1.Uncertainty over continuity of observations 2.Large spatial and temporal gaps in specific data sets 3.Eroding or little technical infrastructure in many parts of the world 4.Lack of relevant processing systems to transform data into useful information 5.Limited access to data and associated benefits in developing world 6.Inadequate data integration and interoperability 7.Inadequate user involvement GEOSS Targeted Gaps

By 2015, GEO aims to: 9. Enable the global coordination of observing and information systems to support all phases of the risk management cycle associated with hazards (mitigation and preparedness, early warning, response, and recovery). Disasters Strategic Target

GEO Work Plan Main contributions to the Disasters SBA WA-01-C1: Integrated Water-cycle Products and Services WA-01-C2: Information Systems for Hydro- meteorological Extremes (incl. Floods and Droughts) DI-01-C1: Disaster Management Systems DI-01-C2: Geohazards Monitoring, Alert, and Risk Assessment DI-01-C3: Regional End-to-End Systems

Early Warning System Monitoring system Disaster management (Resource management and Planning, emergency logistics, land use regulation) Land use plans, legal framework for DRR, EWS, resilience (infrastructures, community preparedness and awareness building). Models Risk assessment Damage Assessment Socio economic data Real time In situ observations Past events magnitude/frequency NRT products (rapid mapping) Earth Observations (RS and in-situ measurement) input Forecasting Models Yearsdayshours weeks months A (very simplified) logic model for disasters Mitigation and prevention preparedness response recovery phase output outcome

Emergency response Disaster extent Monitoring Damage assessment Recovery Damage assessment (ctd) Logistics and infrastructure analysis Mitigation Hazard assessment Exposure mapping Vulnerability assessment Risk scenarios Emergency plans Preparedness Early Warning System Forecasting/Nowcasting Event scenario hours weeks years Data -> Products -> Services WA-01-C1 Integrated Water Cycle WA-01-C2: hydrological extremes DI-01-C1 DMS DI-01-C2 Geohaz monitoring and RA DI-01-C3 regional end2end First responders Disaster managers Local Authorities National Decision makers Scientists P ER R M

GEO Regional stakeholders: RCMRD INPE Cathalac ICIMOD CMO/ CDEMA CSIR SANSA Sentinel Asia EC-JRC EPOS EGS RADI UNAVC O USGS CSIRO

GEOSS Human capital Experience + expertise Informal + formal Capacity building Deliverables Information for supporting decision-making Institutions Networking Governance Data sharing Infrastructure Space-based + in situ instrumentation Architecture + Data management + Data portals Software + tools GEOSS Implementation requires :

GEO Common Infrastructure (GCI) The GCI includes three major capabilities: Registries of GEOSS components, services, standards, requirements, and best practices, a common search facility, known as the GEOSS DAB, or Data Access Brokering that allow searching across all offered and registered resources, a web portal that provides users a “one stop” access to all GEOSS resources

Broker Strategy & Interoperability Arrangements

GEO Work Plan DI-01-C1 International Charter Space and Major Disasters In response to a request from the Group on Earth Observation (GEO) to improve access to the Charter during emergencies, collaboration has started with primary focus on users from Africa Starting in 2009 the Charter has initiated a formal user consultation to address how to improve Charter access. Furthermore, starting from GEO member states of the Asia Pacific region, the Charter has established a link to Sentinel Asia users. Finally in September 2012, the process for the implementation of Universal Access for the Charter has been adopted by the Board. PERRM

Caribbean Satellite Disasters Pilot (CSDP) Southern African Flood and Health Pilot (SAFHP) Objectives To demonstrate the effectiveness of satellite imagery to strengthen regional, national and community level capacity for mitigation, management and coordinated response to natural hazards To identify specific satellite-based products that can be used for disaster mitigation and response on a regional level To identify capacity building activities that will increase the ability of the region to integrate satellite-based information into disaster management initiatives GEO Work Plan DI-01-C3 PERRM

Information Systems for Hydro-meteorological Extremes (incl. Floods and Droughts) Development of a Global Flood Awareness System (GloFAS) a joint effort of JRC and ECMWF, aimed at providing early warnings for large transnational river flooding at the global scale. Development of a Global Drought Information System that will integrate global, continental, and regional scale monitoring and forecast information with high enough accuracy to assist in early warning efforts GEO Work Plan WA-01-C2 PERRM

GEO Work Plan DI-01-C1 SERVIR (The Regional Visualization and Monitoring System ) Central America 9 countries; Africa 18 countries; Himalaya 6 Countries Support in Extreme Events and Capacity Building in the Use of GIS and Remote Sensing for Disaster Management. GDACS Global Disasters Alert and Coordination System is a cooperation framework between the United Nations (UNOSAT, UNOCHA), the European Commission (JRC) and disaster managers worldwide to improve alerts, information exchange and coordination in the first phase after major sudden-onset disasters. PERRM P RM

The CEOS ad hoc Disaster Team created three thematic teams to develop three thematic pilots (one each relating to floods, seismic hazards and volcanoes) and the related components of the CEOS DRM Observation Strategy. The pilots will: Acquire data Gather in situ data if relevant Supply data to Thematic value adders (VA) and/or Users Supply Thematic value-adding products to Users Gather feedback, validation report, exploitation report Assess performance and define service roll out GEO Work Plan DI-01-C3 PERRM

GEO Work Plan WA-01-C1 GEO is developing a Water Cycle Integrator (WCI), which integrates Earth observations, modeling, data and information, management systems and education systems into a virtual “work bench” for scientific collaboration. GEO has established the Asian Water Cycle Initiative (AWCI) African Water Cycle Coordination Initiative (AfWCCI) In Latin America, GEOSS water capacity building programs are now on going through CIEHYC (“Comunidad para la informacion espacial e hidrografia en Latino America y el Caribe”). Through regional, inter-disciplinary, multi-sectoral integration and inter- agency coordination, GEOSS/WCI is now leading to effective actions and public awareness in support of water security and sustainable development. PERRM

GEO Work Plan DI-01-C1 Global Wildland Fire Information System AFIS, a regional fire danger system for southern Africa European Forest Fire Information System (EFFIS) Global Early Warning System for Wildland Fire (Global EWS) Global Fire Information Management System (GFIMS) The South African Risk and Vulnerability Atlas (SARVA). The Atlas is aimed at equipping decision-makers with information on the impact and risk associated with global change in the region. PERRM P RM

PREVIEW Global Risk Data Platform. A multiple agencies (UNEP, UNISDR) effort to share spatial data information on global risk from natural hazards. It was developed as a support to the Global Assessment Report on Disaster Risk Reduction (GAR) GEM Global Earthquake Model GEM is about uniform open standards, datasets and tools for worldwide risk assessment. GEM is constructing a global framework (of data, methods and tools), that will enhance risk assessment on local scales and worldwide collaboration. It is a collaborative effort that leverages the knowledge, networks and data of all those that want to part of it. GEO Work Plan DI-01-C1 PERRM P RM

Geohazard Supersites and Natural Laboratories (GSNL) Pooling Satellite imagery and terrestrial in-situ data for earthquake and volcano studies. There are 3 different level of sites: Permanent Supersite where integration between in-situ and satellite data is promoted by implementing e-infrastructures; Post-Event Scientific Forum Supersite web portal where to collect information, data, modeling results etc.. immediately after a catastrophic event; Natural Laboratories Global Network of regional Natural Laboratories. GEO Work Plan DI-01-C2 PERRM

Challenges and Issues Current focus more on global than regional / local issues. Engaging local disaster managers and responders is a major challenge (What are the real user needs ? How to provide the right and useful information down to the end users ?) Improve disaster management by fostering additional multi- hazard approaches. Data Infrastructures (data repositories, data processing, data distribution) often not accessible for stakeholders and disaster managers of developing countries (technological divide).

Challenges and Issues Current focus more on global than regional / local issues. Engaging local disaster managers and responders is a major challenge (What are the real user needs ? How to provide the right and useful information down to the end users ?) Improve disaster management by fostering additional multi- hazard approaches. Data Infrastructures (data repositories, data processing, data distribution) often not accessible for stakeholders and disaster managers of developing countries (technological divide).

Francesco GAETANI