Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.

Slides:



Advertisements
Similar presentations
PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
Advertisements

1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
PIP Update Aug 15 th Agenda Summary Update – Current Activities Dennis Barak / Kiyomi Seiya - High-Power Ferrite Testing Ryan Crawford - Linac and.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Proton Improvement Plan (FY13 PMG Q4). William Pellico, Fermilab PMG, Nov PIP FY13 Q4 Summary Task Highlights Budget and Labor Review Summary.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
Proton Improvement Plan (PIP) William Pellico PIP and MI 700 kW review 21 – 22 January 2015.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
Proton Improvement Plan Bob Zwaska July 7, 2014 All-Experimenters Meeting.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
PIP FY15 PMG W. Pellico PIP PMG March 5 th PIP FY15 Year to Date Outline –FY15 activities PIP quarterly milestones Linac Booster Project Controls.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
PIP FY15 Q4 Report W. Pellico PIP PMG November 5 th 2015.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
Accelerator Status and Plans
Proton Improvement Plan Overview Bob Webber July 13, 2011.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Proton Improvement Plan (FY13 PMG Q3). William Pellico, Fermilab PMG, Aug PIP FY13 Q3 Summary Task Highlights Budget and Labor Review Summary.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
PIP Update Dec 17 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
PIP Update August 12 th Agenda Summary Update Current Activities Update – Ryan Crawford - Booster Anode Power Supplies – Dave Johnson - Laser Notcher.
PAC Meeting, December 12, Prebys 1 The Problem.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update May 28 th Agenda Summary Update – Current Activities/Updates – Ken Domann.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Presentation transcript:

Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting

Bob Zwaska | PIP2 PIP – Approaching Four Years Started officially Oct. 1, 2011 –Upgrade Linac & Booster for NOvA, BNB, & Muon experiments –More than double flux, rep rate, run for the long-term Much has been done, several milestones achieved recently –Booster 15 Hz – 17 refurbished cavities –Beam was on nearly at 15 Hz –Record beam flux achieved Several major tasks to complete – Shutdown now –Cavity refurbishment –Bias Supplies –Klystron Delivery –Linac Modulators –New Cavities –Number of small items

Bob Zwaska | PIP3 Increase the beam repetition rate from the present ~7.5 Hz to 15 Hz –Need at least 9 Hz for NOvA 12-batch slip-stacking –Requires RF cavities refurbishment, RF Systems –Eliminate major reliability vulnerabilities and maintain reliability at present levels (>85%) at the full repetition rate Eliminate major obsolescence issues Increase the proton source throughput, with a goal of reaching >2E17 protons/hour –Presently operating at <1E17 protons/hour Ensure a useful operating life of the proton source through at least 2025 (now extended to 2030 to accommodate PIP-II schedule) Proton Improvement Plan Goals and Scope (Established in 2011)

Bob Zwaska | PIP4 Completed FY15 PIP has 32 Tasks (New Cavity being split) 16 are completed and closed 6 more tasks will be closed in FY15 PIP – Task Structure and Status Being split into three parts to better align with PIP II Completion of all cavities likely into early FY16

Bob Zwaska | PIP5 15 Hz Achieved! 17 Refurbished cavity allowed true 15 Hz pulsing –Beam on nearly all cycles – record running of > 1.4E17 / hr.

Bob Zwaska | PIP6 15 Hz Results First attempt in May found weak cavitites Second attempt worked well for an extended period Known areas heated up –Only a few areas to be fixed RF #17 Bias Bus Bar ~ 96 c Being fixed over shutdown

Bob Zwaska | PIP7

Bob Zwaska | PIP8 200 MHz RF Power Systems Linac High Level Prototype 200 MHz Klystron –Well into assembly of klystron Bake of system expected this month Plan testing at vendor –Able to do full power & pulse length –Will not require Fermi to build test stand Complete late this year ActionDate Preliminary Design Review4/2/2014 Critical Design Review7/11/2014 Seal in Drawings Complete10/6/2014 Final Assembly Drawings Complete 12/17/2014 Seal in Assembly Complete6/17/2015 Final Dress Complete7/15/2015 Testing Complete8/26/2015 Customer Source Inspection8/27/2015 Package and Ship9/8/2015 Gun outer weld cylinder inner cathode support Courtesy of CPI

Bob Zwaska | PIP9 Replace present system Was original to Linac Power-hungry and failure-prone 28 cell design for lower voltage testing Can run test station and Station 1 Learning/ feed-forward control system design Achieved stable operation with feed-forward and learning simultaneously Need to make future tests with changes in learning and feed forward algorithm to reset to default conditions, and then run beam study tests Numerous beam studies to validate circuits Proceeding with 54 cell design Most parts ordered for building 54 cell design, some have already arrived Will start assembly of the extra cells after testing of the 28 cell modulator, then will order the cell enclosure and support structure Full system can proceed when all protypes tested Expected later this year 200 MHz RF Power Systems Linac Modulator

Bob Zwaska | PIP10 PIP Accelerator Physics Linac Laser Notcher Linac Notch Creation Substantially reduce losses (~30%) in Booster by neutralizing beam in Linac Complex laser system nearing completion (with numerous interlocks/controls) Upgrade cavity this summer (prototype running since last shutdown) –Proof of principle neutralization last winter Plan to commission in fall Mirror Laser Input Port RFQ 200 MHz Bunched Beam

Bob Zwaska | PIP11 Booster Anode Supplies Anodes supplies for the Booster RF –A lot of effort to finish this system in time Issues finding vendors that can meet the specifications (today’s standards) Issues with enclosure –Full system test of the first anode is in process –Second supply built mostly in serial Installation to occur this shutdown –Complicated installations –Anode supplies are large/heavy Rigging/cranes needs to be coordinated –Substantial electrical work High-voltage / high-current cables –Shakedown before beam returns

Bob Zwaska | PIP12 Cap Bank & Bleeders Anodes & Transformer for testing Water Cooled Resistors

Bob Zwaska | PIP13 New Cavities Main RF Cavities Additional Cavities 21 & 22 –Additional voltage headroom –Improve RF manipulations –Ensure reliability –Develop expertise with cavities New Cavities –Long term operations –Avoid known weak points of existing cavities –Higher current operations Compatible with PIP-II+ requirements Harmonic Cavity –Perpendicular biasing –Improve injection Design simulations –Exploration of direct liquid cooling –Different garnet geometries –Exploring “radial field”, an alternate to a solenoidal field Work on testing garnets –Better measurements of losses in AL400 –Testing of AL800 to begin soon

Bob Zwaska | PIP14 Summary Much has been accomplished within PIP – 15 Hz Still a busy shutdown –Continue refurbishment (17/20 stations refurbished) Embark on additional / new cavities –Replace Booster Anode & Bias supplies –Install Linac Laser Notcher –Numerous other jobs (water, vacuum, instrumentation, dampers) Commission rapidly out of the shutdown –At least 19 cavities – higher beam fluxes –Should be able to support 700 kW beam fully + BNB Ops Long-term, complete RF replacement towards PIP-II

Proton Improvement Plan Bob Zwaska July 6, 2015 All-Experimenters Meeting