ScECAL Fermilab Beam Test analysis ScECAL Group Meeting Kyungpook National University, Daegu, Republic of Korea, August 6 th, 2010 Adil Khan, Satoru Uozumi,

Slides:



Advertisements
Similar presentations
Beam test of novel ASICs and sensors Marcin Chrząszcz Cracow University of Technology Itamar Levy Tel Aviv University.
Advertisements

CSC Test Beam Data Analysis Alexander Khodinov and Valeri Tcherniatine.
Secondary beam analysis – PS and SPS Started May 22, 2012.
1 Calice UK Analysis Meeting 23/1/07David Ward Cambridge data analysis work David Ward Main focus – data-MC comparisons Using “official” reconstructed.
With Real Detector: The MIP Apollo Go, NCU Taiwan Ped:  ADC cnts MIP: 39.0  12.6 ADC cnts S/N should be better with 3 time samples, better.
2 Introduction   MiniCal test-beam studies started at the beginning of March (till March 6 we only had 17 APD’s, then 33 APD’s)   A few days were.
1 AHCAL answers IDAG Erika Garutti On behalf of AHCAL analysis team.
Adil Khan Kyungpook National university Korea-Japan Joint ScECAL Group Meeting kobe University Japan 3 rd September 2010.
Preshower 15/03/2005 P.Kokkas Preshower September Run Data Analysis P. Kokkas.
Calorimeter1 Understanding the Performance of CMS Calorimeter Seema Sharma,TIFR (On behalf of CMS HCAL)
Status of MAPS Geometry Simulation Yoshinari Mikami University of Birmingham 17th MAY 2006 MAPS Meeting at Rutherford Appleton Laboratory.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
GLAST LAT Project Software vrvs meeting X. Chen 1 GLAST LAT Project Software vrvs meeting X. Chen 1 Analyses of Muon Calibration Data Xin Chen.
Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams st part On behalf of the CALICE Collaboration.
More on Testbeam Analysis FLZ. Stability Checks for TCMT Pedestal stability already shown by Kurt MIP calibration stability Response stability.
The Time-of-Flight system of the PAMELA experiment: in-flight performances. Rita Carbone INFN and University of Napoli RICAP ’07, Rome,
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
Preliminary results with the Alibava Telescope G. Casse, S. Martì, J. Rodriguez, I. Tsurin and the Alibava collaboration 1 G. Casse,20th RD50 Workshop,
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
N. Saoulidou, Fermilab1 Study of the QIE Response (Current Injection Mode) & development of diagnostic tools
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
ScECAL BeamTest Analysis Asian ScECAL Meeting Jan 14 th, 2010 Adil, Satoru Uozumi, DongHee Kim.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
CALICE Digital Hadron Calorimeter: Calibration and Response to Pions and Positrons International Workshop on Future Linear Colliders LCWS 2013 November.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
MPPC Saturation Corection Idea -> how to do. MPPC Gain measurement To apply saturation correction to the beam data, all MPPC are needed to be calibrated.
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
ScECAL Fermilab Beam Test analysis ScECAL Group Meeting Kyungpook National University, Daegu, Republic of Korea, July 22 nd, 2011 Adil Khan.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Run6 CNI Analysis: Concluding Remarks and Summary of Systematic Uncertainties A.Bazilevsky For RHIC CNI group RHIC Spin Collaboration Meeting November.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Reconstructing energy from HERD beam test data Zheng QUAN IHEP 3 rd HERD work shop Xi’an, 20 Jan
Some feedbacks from DRS data analysis (very preliminary) F. Scuri - I.N.F.N Sezione di Pisa RD52 – Collaboration Meeting – Pavia, March 12, 2013 F. Scuri.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Muons at CalDet Introduction Track Finder Package ADC Corrections Drift Points Path Length Attenuation Strip-to-Strip Calibration Scintillator Response.
N. Saoulidou, Fermilab1 Study of the QIE Response & Calibration (Current Injection CalDet & Development of diagnostic tools for NearDet N.Saoulidou,
DREAM Coll. Meeting, Rome 2009F. Bedeschi, INFN-Pisa Template Analysis of DRS Data  Motivations  Preliminary results F. Bedeschi, R. Carosi, M. Incagli,
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
GLD ECAL Beam Test at DESY - Plan and outlook - Satoru Uozumi (Shinshu) Jan Japan-Korea Joint Shinshu Univ.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
Report on the Beam Test Analysis Satoru Uozumi Apr GLDCAL meeting Topics of this talk are: Comparison of various MIP calibration methods Some problems.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
The ATLAS Liquid Argon Calorimeter: Overview and Performance Huaqiao ZHANG (CPPM) On behalf of the ATLAS Liquid Argon Calorimeter Group.
Brief report on May 09 running with ScECAL and AHCAL S. Uozumi (Kobe) Jun CALICE TB meeting.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
DESY BT analysis - updates - S. Uozumi Dec-12 th 2011 ScECAL meeting.
ATLAS Tile Calorimeter Data Quality Assessment and Performance
CEPC ScECAL Optimization for the 3th CEPC Physics Software Meeting
Beam test of Silicon-Tungsten Calorimeter Prototype
EZDC spectra reconstruction and calibration
Online Monitoring : Detector and Performance check
Marcin Chrząszcz Cracow University of Technology Itamar Levy
Some Result of HyCal Resolution
Panagiotis Kokkas Univ. of Ioannina
Detection of muons at 150 GeV/c with a CMS Preshower Prototype
Oleg Gavrishchuk, JINR, Dubna
MDC Data Check Wu Linghui
ScECAL+AHCAL+TCMT Combined Beam FNAL
Results of HyCal Analyses
Status report Minjung Kim
Current status Minjung Kim.
Meeting 02/11/2016 – Andreas Christou
Current status Minjung Kim
Presentation transcript:

ScECAL Fermilab Beam Test analysis ScECAL Group Meeting Kyungpook National University, Daegu, Republic of Korea, August 6 th, 2010 Adil Khan, Satoru Uozumi, DongHee Kim

MIP Calibration MIP Calibration Constant DataEntriesMeanRMS Low Temp Runs High Temp Runs Mip Const

Mip Response MappingMip constant Correlation

Mean value of each Energy Point Run#Energy PointMeanSigma GeV GeV GeV GeV GeV GeV

Energy Vs Correlated Temperature 3Gev6Gev12Gev 16Gev 25Gev 32Gev

Xprofile of Correlated Temp vs Energy 3Gev6Gev 12Gev16Gev 25Gev32Gev P0: P1: P0: P1: P0: P1: P0: P1: P0: P1: P0: P1:

BackUp

Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run list for Moun 32 Gev 2009 data Only the circled one are good runs Bad Runs LowTemp Runs HighTemp Runs

9 Fitting all the channels Using Gaussian Convoluted-Landau Function MuonRun 32GeV, Layer1 Mip Distribution of High Temp Runs Mip Distribution of Low Temp Runs

10 Chi2/NDF Result from Fitting Chi2/ndf of High Temp Runs Chi2/ndf of Low Temp Runs

MIP Selection Muon Event Recorded in Online Monitor Strip =j Layer x !=i Event selection Example: For X-Layer i, Strip j →Check a hit of the strip j on other X-layers excepting i.(total 14 layers)‏ MIP event Hit Definition: ADC >ADC ped + 3σ ped Fitting MIP Distribution Gaussian convoluted landau distribution function