BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Planning Software Сентябрь 2004 Москва David Botha.

Slides:



Advertisements
Similar presentations
Regional Workshop on planning of digital terrestrial broadcasting in relation to RRC-06 for CEE, CIS and Baltic States (Moscow, 21 –24 September 2004)
Advertisements

Information Meeting on RRC-04/05, September 03 1 Approaches to Frequency Planning for RRC-04/05 Nigel Laflin Rapporteur for Chapter 3 of the TG6/8 report.
Linked requirements and their impact on planning Borislav M. Rackov ITU/BR/TSD/TPR Linked requirements and their impact on planning Borislav M. Rackov.
Conversion of Analogue Assignments into Digital Allotments Conversion of Analogue Assignments into Digital Allotments The Channel Potential Method Dr.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, April 2005 RRC technical.
Regional Radiocommunication Conference (RRC-06) 15 May - 16 June 2006, Geneva, Switzerland RRC-06 Planning Interface Miroslav Ćosić, Andrea Manara Radiocommunication.
Wiesbaden 95 rev. Maastrich 02 & Chester 97 ITU-BR Information meeting on RRC-04/05, Geneva, September 2003 Overview of the special agreements concluded.
RADIOCOMMUNICATION BUREAU BROADCASTING-SATELLITE SERVICE PLANS AND LISTS by Mark Griffin BR/SSD/SNP.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the Arab countries Damascus, Syria August 2005 Planning.
RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY.
Requirements and declarations Ken Hunt EBU Technical department.
Regional Radiocommunication Conference Information session Results of the second synthesis of the draft Plan Pham Nhu Hai PXT Team Leader Radiocommunication.
BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD RRC Website Сентябрь 2004 Москва David Botha.
BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Reference Planning Concept Reference Planning Configurations and Reference Networks Сентябрь.
BR/TSD Dakar 2005 BCD Reference Planning Concept Reference Planning Configurations and Reference Networks April 2005 Dakar David Botha Workshop.
Band III issues (Overview of the activities within Task Group 6/8: Use of the band 174 – 230 MHz) Ben Smith Radiocommunications Agency Netherlands BR Information.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the Arab countries Damascus, Syria August 2005 Analysis.
BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Compatibility Analysis Сентябрь 2004 Москва David Botha.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, April 2005 Results.
BR/TSD Accra 2005 BCD Salient issues related to the production of the draft plan 10 – 14 October 2005 Accra David Botha Workshop for the African Countries.
BR/TSD Dakar 2005 BCD Reference situations and salient points for Administrations in the RCC region 25 – 29 April 2005 Dakar Workshop for the African Group.
BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Reference situations and salient points for Administrations in the RCC region Сентябрь 2004.
BR/TSD Accra 2005 BCD Workshop for the African Countries Working assumptions for the production of the draft plan 10 – 14 October 2005 Accra David Botha.
BR/TSD Accra 2005 BCD Workshop for the African Countries Second series of results of the first planning exercise 10 – 14 October 2005 Accra David Botha.
BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Planning Principles and Approaches Сентябрь 2004 Москва David Botha.
The Channel Potential Method Dr. Roland Beutler Germany Practical Considerations.
BR/TSD Dakar 2005 BCD Compatibility Analysis 25 – 29 April 2005 Dakar David Botha Workshop for the African Group of Countries.
BR/TSD دمشق 2005 BCD Salient issues related to the production of the draft plan أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of.
BR/TSD Dakar 2005 BCD Planning Software 25 – 29 April 2005 Dakar David Botha Workshop for the African Group of Countries.
BR/TSD دمشق 2005 BCD Planning Software أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.
Conversion of analogue assignments Protection of existing and planned services Conversion of analogue assignments Protection of existing and planned services.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, April 2005 Working.
OVERVIEW OF INTERSESSIONAL ACTIVITES Eng. Taha A. Usi Ag. Zonal Manager TCRA, Zanzibar
BR/TSD Dakar 2005 Workshop for the African Group of Countries BCD Planning Principles and Approaches 25 – 29 April 2005 Dakar David Botha.
Problems and solutions For any given solution, a frequency planner can find a problem.
1 ASMG- GE06 Plan overview and coordination meetings status.
SYSTEM PROGRAMMING & SYSTEM ADMINISTRATION
Program Flow Charting How to tackle the beginning stage a program design.
Systems Analysis and Design in a Changing World, 6th Edition
TECHNICAL ASPECTS IN CHANNEL PLANNING FOR DIGITAL TERRESTRIAL TELEVISION BROADCASTING IN NIGERIA GBENGA-ILORI, A.O. DEPARTMENT OF ELECTRICAL AND ELECTRONIC.
Software Testing Verification and validation planning Software inspections Software Inspection vs. Testing Automated static analysis Cleanroom software.
© 2012 IBM Corporation Rational Insight | Back to Basis Series Chao Zhang Unit Testing.
CIS Computer Programming Logic
Computer Programming Basics Assistant Professor Jeon, Seokhee Assistant Professor Department of Computer Engineering, Kyung Hee University, Korea.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
Chapter 1 Introduction to Computers and C++ Programming Goals: To introduce the fundamental hardware and software components of a computer system To introduce.
How is Technical & Regulatory Examination carried out in the BR - a detailed view.
Drexel University CS 451 Software Engineering Winter Yuanfang Cai Room 104, University Crossings
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 22 Slide 1 Software Verification, Validation and Testing.
Regional Workshop on planning of digital terrestrial broadcasting in relation to RRC-06 for CEE, CIS and Baltic States (Moscow, 21 –24 September 2004)
Digital Cable Tuner[Model :TDMK-G5XXD] User’s Manual (TUA TDA10021H) May 2004 Evaluation kit TDMK-G5XXD.
Module Overview. Aims apply your programming skills to an applied study of Digital Image Processing, Digital Signal Processing and Neural Networks investigate.
Regional Workshop on planning of digital terrestrial broadcasting in relation to RRC-06 for CEE, CIS and Baltic States (Moscow, 21 –24 September 2004)
Software Engineering1  Verification: The software should conform to its specification  Validation: The software should do what the user really requires.
New Random Test Strategies for Automated Discovery of Faults & Fault Domains Mian Asbat Ahmad
Present document contains informations proprietary to France Telecom. Accepting this document means for its recipient he or she recognizes the confidential.
1 CS 151: Digital Design Chapter 3: Combinational Logic Design 3-1Design Procedure CS 151: Digital Design.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, April 2005 Salient.
Regional Workshop on planning of digital terrestrial broadcasting in relation to RRC-06 for CEE, CIS and Baltic States (Moscow, 21 –24 September 2004)
C++ for Engineers and Scientists, Second Edition 1 Problem Solution and Software Development Software development procedure: method for solving problems.
LIGO-G9900XX-00-M DMT Monitor Verification with Simulated Data John Zweizig LIGO/Caltech.
PROGRAMMING FUNDAMENTALS INTRODUCTION TO PROGRAMMING. Computer Programming Concepts. Flowchart. Structured Programming Design. Implementation Documentation.
Application architectures Advisor : Dr. Moneer Al_Mekhlafi By : Ahmed AbdAllah Al_Homaidi.
Introduction to Computer Programming Concepts M. Uyguroğlu R. Uyguroğlu.
Software Engineering Algorithms, Compilers, & Lifecycle.
Lecture 1 Gunjeet kaur Dronacharya group of institutions.
OFFICE OF FINANCIAL MANAGEMENT 0 Office of Financial Management Office of Financial Management TALS Draft Conceptual Solution February 24, 2004.
Radiocommunication Bureau International Telecommunication Union
eNotices Electronic notifications
Chapter 1 Introduction(1.1)
Presentation transcript:

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Planning Software Сентябрь 2004 Москва David Botha

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Procedure for the production of a plan Compatibility analysis and synthesis process Analysis Synthesis Admin/BR BR/PXT Admin/BR Admin.

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Current status Delivery of software On 1 September 2004 the EBU delivered: 1.Analysis software for: Analogue television assignments Digital sound broadcasting assignments and allotments Digital television assignments and allotments Code in FORTRAN 2.Synthesis software for: Digital sound and television in band III Digital television in band IV/V Code in FORTRAN 3.Some analysis software for primary services other than broadcasting delivered (UHF). Some parts outstanding.

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Current status Verification and testing BR specify and perform tests on: 1.Basic software functionality: Compile different routines Execute routines based on general data examples Reporting errors and implement updates 2.Calculation verification: Verification of basic propagation functionality Interference calculations for simple cases Compatibility findings Synthesis results based on artificial problems

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Current status Verification and testing BR and PXT specify and perform tests on: 3.Planning test scenarios: Software performance vs. system requirements Results from analyses and syntheses Variation of scenario parameters 4.Planning exercise scenarios: Results from analyses and syntheses Implementing different approaches to planning Findings as input to IPG meeting 5.Testing and verification to be concluded by end Oct. 2004

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Current status Planning software components Software consists of different command line executable modules: 1.Analysis software Data conversion software Analysis modules (D to A, A to D, D to D, O to D, D to O) Compatibility identification 2.Synthesis software Data conversion software (preprocessing) Synthesis modules (bands III and IV/V separately)

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Current status Planning software: How does it work? Input data: Reference situations New digital BC requirements Data conversion Analyses: Services areas Interference Compatibility identification: Combination of analyses Syntheses VHF and UHF treated in parallel and independently

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Current status Planning software: How does it work? (continued) Analyses Data preprocessing Syntheses: Different algorithms Combination of results Identification of best solution VHF and UHF treated in parallel and independently Plan

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Analyses Detailed overview General steps: 1.Data preparation of: Extracts of reference situations for broadcasting and other primary services into text; Requirements for digital broadcasting (assignments, allotments for T-DAB and DVB-T) into text; Conversion of text files into proprietary binary files.

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Analyses Detailed overview continued General steps continued: 2.Calculations of: Noise limited coverage areas; Service areas (limited to borders and by acceptable interference); Excessive interference between requirements indicates incompatibilities; Excessive interference between requirements and existing and planned assignments indicates incompatibilities – channels not available for use.

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Analyses Detailed overview continued General steps continued: 3.Post processing of results: Combining of incompatibility results of different cases; Combining of incompatibility results of requirements with existing and planned assignments as restrictions; Preparation of files for bands III and IV/V separately.

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Syntheses Detailed overview General steps: 1.Preprocessing of compatibility results: Conversion of compatibility results into files of incompatibilities; Generation of lists of available channels; Data prepared for each requirement; Separate sets for bands III and IV/V.

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Syntheses Detailed overview continued General steps continued: 2.Synthesizing frequency plans: Search for solutions based on input data and 49 channels in band IV/V and 67 channels (overlapping) in band III; Apply 230 individual fast algorithms; Software can treat requirements in band IV/V and in band III; Require 2 GB of random access memory.

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Syntheses Detailed overview continued General steps continued: 3.Preparation of output data: Generate combined list of all solutions found for each algorithm; Identify the best solution as separate output.

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Further development Items to be considered for improvement/correction General further development: Continued verification and testing; Report errors to EBU; Implement corrections and repeat testing; Suggest improvements; Implement and test improvements.

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Further development Items to be considered for improvement/correction Specific further development: Extracting and publishing analysis results; Method for treating administrative declarations (compatibility and usable/unusable channels); Extracting and publishing synthesis results; Improvement in calculation speed; Additional synthesis routines that improve planning efficiency (longer calculation time); Developing alternative synthesis methods, if the number of requirements exceeds (Band III) and (Band IV/V).

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD

BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Спасибо