Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June 10-11 th 2010, Argonne. 1.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
Torch electronics test environment MCP readout update.
4-channel ASIC Tests Michael Baumer, Jean-Francois Genat, Sam Meehan, Eric Oberla August 26 th 2009.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Development of a 20 GS/s Sampling Chip in 130nm CMOS Technology Jean-Francois Genat On behalf of Mircea Bogdan 1, Henry J. Frisch 1, Herve Grabas 3, Mary.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Belle-II iTOP readout: production HV board and front board iTOP Electro-opto-mechanical working group Virginia Tech, 7/3/2013 Gerard Visser Indiana.
VELO upgrade Front-end ECS LHCb upgrade electronics meeting 12 April 2012 Martin van Beuzekom on behalf of the VELO upgrade group Some thoughts, nothing.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
New Test Facilities at Argonne LAPPD Collaboration meeting June Matt Wetstein, Bernhard Adams, Matthieu Chollet.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
The new set of MWPCs for CB Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
29-Jun-09H. Henschel DESY (Zeuthen) 1 Frontend Interface Summarize.
Doug, here are some slides. FGT Electrical Integration ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 2 mA ARC module (APV Readout.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
Collaboration Meeting Argonne National Laboratory June 10-11, 2010 Mechanical Design of Glass Tiles and Trays Rich Northrop University of Chicago Second.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
S. AUNE 15/09/08 Micromegas Bulk for CLAS12 tracker.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
Pads Assembly- Zamiatin Si Detector – ELMA/Dubna/MSU Interface Board – dubna/baskagiv Carrier Board -dubna/baskagiv Pre-Amp –sleniov(analog) Basilev-dubna.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
Update on Physical Parameters that influence Timing Jean-Francois Genat LPNHE Paris LAPPD Electronics & Integration Review July 9th 2012, Chicago.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
1 LAPPD Team meeting 6/10/2010 Ossy Siegmund, Experimental Astrophysics Group, Space Sciences Laboratory, U. California at Berkeley Integration of Front-End.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Belle-II iTOP HVB Status SLIDE FOR INCLUSION IN GARY’S PRESENTATION Belle II General Meeting Gerard Visser Indiana University CEEM 11/13/2012.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
PandaX 实验中的电子学概述 郭国栋 Outline Introduction Original scheme Improved scheme PMT base design in PandaX I and PandaX II Decoupler design in.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
Trigger & Tracking detector for CMS
Efficiency, Dark noise, and Baseline fluctuations with Burle-Photonis MCP-PMT's Jean-Francois Genat and Edward May Dec 2009 –Jan 2010.
GEM Integrated PCB readout and cooling
Profiler Mechanics Update
1Jean-Francois Genat on behalf of the LAPPD collaboration (
Calorimeter Mu2e Development electronics Front-end Review
T1 Electronic status Conclusions Electronics Cards:
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
Strawman module design
EC board for JEM-EUSO Design investigations
HPS Motherboard Electronic Design
George Hadley Kelli Hacker Sean Ma Jacob Champion
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Overview of T1 detector T1 is composed by 2 arms
Jean-Francois Genat, Sam Meehan, Eric Oberla August 26th 2009
Jean-Francois Genat, Herve Grabas, Eric Oberla August 2d 2010
NPS mechanical design 01/31/2019 Jlab meeting
Presentation transcript:

Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June th 2010, Argonne. 1

Outline - Tile and Tray - On-Tray electronics - Tray assembly - Plans LAPD Collaboration Meeting, June th 2010, Argonne. 2

Tiles and Tray 3 6-Tiles Trays From Rich Northrop LAPD Collaboration Meeting, June th 2010, Argonne.

Tile structure LAPD Collaboration Meeting, June th 2010, Argonne. 4 Inside out: grounded anode strips on top of glass HV divider uses spacers as passive components. Single HV connection on top From Rich Northrop (vertical dimensions not final) From Joe Gregar

Tray structure 5 2-Tile tray LAPD Collaboration Meeting, June th 2010, Argonne.

6 Tray overall layout LAPD Collaboration Meeting, June th 2010, Argonne.

On Tray Electronics - Analog board - Front-end Chips - Jitter cleaner(s) - LV decouplings caps - Interface connector to digital board - Digital board - FPGA - Optical interfaces to DAQ - LV decouplings caps - Interface connector to analog board - High Voltages - One single HV access to tile on top - One SHV single access/tray - Teflon insulated HV wires running on-tray - Single RC decoupling for each tile LAPD Collaboration Meeting, June th 2010, Argonne. 7

8 See Eric Oberla and Herve Grabas talks Electronics layout

Tray assembly 9 Tile to PCB: Double sticky tape PCB to Honeycomb: Double sticky tape Anode plane to anode plane: Copper foil soldered LAPD Collaboration Meeting, June th 2010, Argonne.

10 Ballpark for costs Estimation for 15 x 6-tile trays (MCP not included) of 16 “ x 24 “ (equivalent to a 22” diameter PMT) Sampling ASIC: 10 $/ch 64-channel/row (16 chips) ASICs 1,300 $ Glass = 3,000 $ (Rich Northrop) Honeycomb+ PCB = 600 $ (Rich Northrop) Total = 5,000 $ x 4 (Henry’s factor) <= 20 k$

11 LAPD Collaboration Meeting, June th 2010, Argonne. First tests with a small (30mm diameter) commercial MCP in vacuum, read with the 8” x 8” inside-out transmission lines scheme Tests with a laser with or without a photo-cathode Check the signals at two ends -First: SMAs + oscilloscope, - Actual cards with sampling ASICs and FPGA Need : - The MCP - A fully functional tray (vacuum, HV access on top, anodes). - The ALD processed spacers for HV distribution. Plans towards a tray

Extra slides 12

LAPD Collaboration Meeting, June th 2010, Argonne. 13

Tile assembly LAPD Collaboration Meeting, June th 2010, Argonne. 14 Inside out structure

First Glass Box (May 18 th J. Gregar) LAPD Collaboration Meeting, June th 2010, Argonne. 15