20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.

Slides:



Advertisements
Similar presentations
Recent achievements and projects in Large MPGDs Rui de Oliveira 21/01/2009 RD51 WG1 workshop.
Advertisements

QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
4/11/2011Rui de Oliveira1.  Collection of the biggest PCB failures we’ve seen at CERN workshop since 10 years.  The PTH (plated through hole) is the.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
Industrial Production of MPGDs Rui de Oliveira Workshop on neutron detection with MPGD CERN October
Atsuhiko Ochi Kobe University / MAMMA collaboration 24/04/2013 RD51 mini week, WG6.
Introduction to GEM detectors assembly Leszek Ropelewski CERN CompassTotem 33 cm NA61 30 cm 20 cm 66 cm Totem Upgrade 10 cm.
CERN PCB workshop activities
Fabrication techniques and industrialization of MPGDs.
-Stephan AUNE- RD51 Bari 2010 CEA DSM Irfu 08/10/20101 Saclay MPGD workshop.
GEM progress from Chinese collaboration Yuxiang Zhao University of Science and Technology of China Aug 20,
1 July GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
Atsuhiko Ochi Kobe University 25/06/2013 New Small Wheel MicroMegas Mechanics and layout Workshop.
Resistive Strips Preparation - with carbon sputtering -
Situation with industry Rui de Oliveira RD51 CERN October
09/06/2009Rui De Oliveira1 Large MPGD production status.
Quality Control and Quality Assurance for PCB production Fabian Kuger on behalf of the MAMMA Collaboration Julius-Maximilians Universität Würzburg, Germany.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
Situation with industry
CERN Rui de OliveiraTS-DEM Rui de Oliveira TS-DEM Large size detectors CERN TS-DEM-PMT Capabilities.
15/07/2010Rui De Oliveira1 Update on large size GEM manufacturing Rui de Oliveira.
CERN workshop upgrade Aida fund Transfer to industry Rui De Oliveira 4/13/20111Rui De Oliveira.
EST-DEM R. De Oliveira 20 Dec., ‘04 Production of Gaseous Detector Elements  History of Gas Detectors in Workshop  Fabrication of GEM Detectors  Fabrication.
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
Construction and first commissioning of the self-stretched gas electron multiplier (GEM) detector J. Twigger, V. Bhopatkar, J. Wortman, M. Hohlmann 77th.
CERN workshop upgrade Aida WP 9.2 Rui De Oliveira.
Large area detectors Aida WP 9.2 RD51 WG6
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
5 th RD51 meeting (WG1) 25 May 2009 Atsuhiko Ochi ( Kobe University )
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
THGEM-process Rui De Oliveira RD51 22/11/2011 WG6 WG6 22/11/20111Rui De Oliveira.
Low Mass Rui de Oliveira (CERN) July
24/05/2010Rui De Oliveira1 Resistive protections for Bulk Micromegas Rui de oliveira, Joerg Wotschack Venetios Polychronakos.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Resistive protections Rui de Oliveira 09/12/15
Plans for MPGD Radiation hardness tests for full detectors and components Matteo Alfonsi,Gabriele Croci, Elena Rocco, Serge Duarte Pinto, Leszek Ropelewski.
M. Staib, M. Abercrombie, B. Benson, K. Gnanvo, M. Hohlmann Department of Physics and Space Sciences Florida Institute of Technology.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
30/09/2010Rui De Oliveira1.  GEM Single mask process  Micromegas  Bulk  Classical  resistive 30/09/2010Rui De Oliveira2.
GEM Foil Development at ECIL
CERN Rui de OliveiraTS-DEM Rui de Oliveira TS-DEM Large size detectors practical limits based on present knowledge.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
CERN Workshop upgrade status Rui De Oliveira RD51 22/11/2011 WG6 WG6 9/1/20111Rui De Oliveira.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
GEM R&D updates from Chinese groups Yuxiang Zhao University of Science and Technology of China May 24,
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
1 Fulvio TESSAROTTO THGEM discussion, 02/11/2009 THGEM production at ELTOS Production of THGEM at ELTOS S.p.A. Company profile Production procedures Small.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
 Large GEM  CMS RE1-1  Kloe  Ns2 ( No stretch No stress)  Large Micromegas  Atlas MAMA project  Large THGEM  Double phase pure argon project 
Suggestions for a MPGD Workshop in Frascati Rui de Oliveira 1.
GEM, Resistive M-Bulk, ThGEM detector production. Rui De Oliveira, Cosimo Cantini, Antonio Teixeira, Olivier Pizzirusso, Julien Burnens Annecy 26/04/2012.
Large size MPGD production: -GEM update -read out board infos Rui De Oliveira CERN 28/04/2009.
MPGD TECHNOLOGIES AND PRODUCTION GEMMicromegas Resistive MSGC (NEW!) Rui De Oliveira 7/12/20111Rui De Oliveira.
GEM, Micromegas detector production. detector’s dynamic range detector’s dynamic range Rui De Oliveira Catania 24/11/ /11/20111Rui De Oliveira.
Large GEM prototype production NS2 technique. Reminder NS2 technic 10 to 15mm Readout connector O-ring Drift electrode Free to slide External screws to.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
GEM Integrated PCB readout and cooling
Large volume GEM production Rui De Oliveira TE/MPE/EM
(On Behalf of CMS Muon Group)
GEM and MicroMegas R&D Xiaomei Li Science and Technology
Dept. of Physics and Space Sciences, Florida Institute of Technology
Quality Control Chamber Production
On behalf of the GEMs for CMS Collaboration
Development of Gas Electron Multiplier Detectors for Muon Tomography
(On Behalf of CMS Muon Group)
A DLC μRWELL with 2-D Readout
MPGD Experience with Technology Transfer
Presentation transcript:

20/04/2012Rui De Oliveira1 20/04/2012

Rui De Oliveira2 30 cm x 30 cm example

 Components  82 x 3 GEMs (1m x 0.45m)  246 GEMs  82 drift boards  82 Read/out boards  Spare parts for NS2  Assembly  Clean room  tooling  Qc  QA 20/04/2012Rui De Oliveira3

20/04/2012Rui De Oliveira4 1m x 45cm active area 1.2m x 0.6m raw material Apical NP 50um Copper 2 x 5um Passivated Raw material on stock

20/04/2012Rui De Oliveira5 Chemical Polyimide etching Second Polyimide etching Copper electro etching Stripping Reality Base material Copper etch

620/04/2012Rui De Oliveira

 Present rate : 10 to12 GEM / month/technician  With new equipment  20 GEM/month/technician 20/04/2012Rui De Oliveira7  around 1 year to produce all the GEMs  1.5 Men/year extra load in TE/MPE workshop

 Subcontracted  Drift board  single sided board (Cope with industry Standards)  R/O  under study, Multilayer board (Cope with industry Standards)  Less than 6 months to produce Boards 20/04/2012Rui De Oliveira8

 NS2 frames  Subcontracted  Simple machining  All parts in less than 3 months  Screws, O-rings, Gas plug etc  Standard  Available  HV divider  Std thick film Hybrid (high laser trimming precision)  Fast production (1000 in 2 months) 20/04/2012Rui De Oliveira9

 Will be done at CERN in TE/MPE workshop  Expected rate : 1 detector per day  0.5 men/year extra load in TE/MPE workshop  Process nearly finalized  Minor adjustments of NS2 technique to simplify the assembly  Accelerated life time tests to verify the stability of the NS2 stretching (100 cycles 10 deg to 40 deg)  Accelerated life time test results under radiation (verify all the material used)  Clean room in Building 102 and future building /04/2012Rui De Oliveira10

 On GEM  Measure physical parameters (holes diameter and uniformity)  Measure leakage current at define voltage in Air  Check sparking voltage (following Pashen curve)  On Drift and R/O boards  Follow IPC A 600 Standards  Measure leakage current at high voltage on the Drift board  On NS2 frames  Measure physical parameters  On assembled detector  Measure gas leaks  Measure HV divider voltages  Measure HV polarization currents  Check Connection integrity and leakage current to GND  Check response uniformity under real operation (X ray scan and current measurement) 20/04/2012Rui De Oliveira11

20/04/2012Rui De Oliveira12

 Delivered with each GEM  Description files  Detailed process  Measurement sheet for each GEM (holes diameter, uniformity)  Production sheet (when, who, yield, base material)  Delivered with Drift and R/O  Description files  Detailed specification  QA report from suppliers  Delivered with NS2 frames  Description files  Measurement sheet (physical parameters: size)  Delivered with each assembled detector  Detailed assembly process  Measurement sheet (leaks, HV values, X ray uniformity)  Production sheet (when, who, yield, parts lot number) 20/04/2012Rui De Oliveira13

20/04/2012Rui De Oliveira14

 We need 2 persons during 2 years to build the 82 detectors.  We need to be informed at least 6 month before the start of the project to train these technicians.  For QC we still need to develop a X-Ray scanning system (in close collaboration with CMS) to do basic checks at the production level (uniformity).  1 room in building 107 can be dedicated to assembly and test. 20/04/2012Rui De Oliveira15