MVS Mainstem Forecast Model Update: NETMISS2 by Joel Asunskis, P.E. Hydraulic Engineer, St. Louis District Water Control U.S. Army Corps Of Engineers October.

Slides:



Advertisements
Similar presentations
Where We Are and How We Got Here TACIR. Two Distinct Issues Unserved areas Areas outstripping their supply TACIR.
Advertisements

UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
Use of a hydrodynamic model to
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
St. Louis District Water Control Operations
US Army Corps of Engineers BUILDING STRONG ® Methods for Determining Maximum Flood Elevations Landward of Failed Levees: An Example from the Great Missouri.
Terrain for the Lower Colorado River Flood Damage Evaluation Project Erin Atkinson, Halff Associates, Inc. Rick Diaz, Lower Colorado River Authority Symposium.
US Army Corps of Engineers BUILDING STRONG ® RIVER RESOURCES ACTION TEAM BOAT TRIP Upper Mississippi River (Pools 24, 25, and Mel Price) St. Louis District.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Dredging Lance Engle Dredging Project Manager St. Louis District WEDA – Midwest 2012.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
HEC-RAS.
BUILDING STRONG ® South Platte CWMS Model Missouri Basin Forecasters Meeting January 29, 2014 South Platte CWMS Model Missouri Basin Forecasters Meeting.
Kansas City Industrial Council Hydrology and Hydraulics
Reservoir and Diversion Data CBRFC Stakeholder Forum July 31, 2012.
1 Real Time Flood Forecasting for the Willamette Basin using HEC-CWMS / ResSim Modeling Real Time Flood Forecasting for the Willamette.
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation 1-Dimensional Modeling CWPPRA Technical Committee and.
The In's and Out's of Locking Through a Dam By RiverBill.
National Weather Service North Central River Forecast Center Mississippi River Forecast Procedure.
One Corps Serving The Army and the Nation Tulsa District The Tulsa District Corps of Engineers and Its Cooperative Partners.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment Two.
River Kelvin Case Study
Hydrologic Modeling with SSARR and HEC-HMS
US Army Corps of Engineers ® Engineer Research and Development Center Coastal and Hydraulics Laboratory Greenup Locks and Dam, Ohio River.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
Feb 2003HEC-RAS Version 3.11 Slides adapted from HEC Unsteady Flow Course Unsteady Flow Course.
Tri-Agency Data Sharing by Joel Asunskis, P.E. Hydraulic Engineer/Data Manager Water Control Management St. Louis District U.S Army Corps of Engineers.
Youghiogheny River Lake Storage ReAllocation for Downstream Water Supply by Werner C. Loehlein, P.E.
Exeter 8/12/00.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
FLASH FLOOD PREDICTION James McDonald 4/29/08. Introduction - Relevance  90% of all national disasters are weather and flood related  Central Texas.
US Army Corps of Engineers BUILDING STRONG ® The Nature Conservancy’s Climate, Risk & Resilience 2013 Learning Exchange Col. Richard Hansen U.S. Army Corps.
Water Supply Reallocation Workshop Determining Yield and Space Requirement.
US Army Corps of Engineers BUILDING STRONG ® Savannah River Basin Drought Workshop October 24-25, 2012.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
Corps Water Management System Hydrologic Engineering Center USACE Hydrologic Engineering Center Davis, CA Davis, CA.
UNCLASSIFIED B UILDING S TRONG 1 LRD Navigation Scenario.
__________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES.
1 Scheduling the TVA Hydro System Using RiverWare’s Optimization Suzanne H. Biddle, P.E. Tennessee Valley Authority.
1 Upper Mississippi River System Flow Frequency Study Rolf Olsen Institute for Water Resources U.S. Army Corps of Engineers Alexandria, Virginia.
Prepared by: Burnham – Floodplain Study October 23, 2009 Presented by: Marty Spongberg, PhD, PE, PG AMEC Geomatrix, Inc.
Water Supply at Beaver Lake, Arkansas Little Rock District US Army Corps of Engineers ® One Corps Serving The Army and the Nation.
1 Overview of Unsteady Flow Modeling With HEC-RAS Gary W. Brunner, P.E.
James VanShaar Riverside Technology, inc
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment SedFlume.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
Floodplain Delineation of Unsteady Flow Using HEC-RAS Final Presentation Presented By: Kevin Donnelly.
Multiple Purpose Dam & Reservoir
US Army Corps of Engineers BUILDING STRONG ® Reservoir Simulation Software “Westfield Sub-basin” Presenter – John Hickey, HEC August 2010.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
U.S. Army Corps of Engineers Wilmington District Real-Time Conservation Pool Storage Accounting for the Falls Lake Project.
Reservoir Operation Simulation D Nagesh Kumar, IISc Water Resources Planning and Management: M7L2 Simulation.
HEC-RAS Version 3.1 Overview
Floodplain Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L5 Water Resources Systems Modeling.
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
From Fread, D.L., Flood routing models and the Manning n.
US Army Corps of Engineers BUILDING STRONG ® Proposed Floodplain Inundation Mapping on the Flathead River Travis Ball Hydraulic Engineer
Models Platform for Danube Forecasting PROJECT DANUBE WATER INTEGRATED MANAGEMENT.
Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 25 July 2012 Lesson 14.
FLO-2D Model Development Below Caballo Dam to Ft. Quitman Prepared by: U.S. Army Corps of Engineers Albuquerque District and Mussetter Engineering, Inc.
BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District November 29 th, 2012.
US Army Corps of Engineers BUILDING STRONG ® Inner Harbor Navigation Canal Lock 2016 Dewatering Marine Industry Day USACE - New Orleans District 20 May.
Mid-West Electric Consumers Association
Environmental Pool Management in the Upper Mississippi River: Managing Water Levels to the Benefit of both Navigation and the Environment Edward Brauer.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
How the Missouri River is Operated - WAPA’s Role - Mid-West Electric Consumer Association Annual Meeting December 11, 2018 | Denver, CO Lori L. Frisk VP,
Presentation transcript:

MVS Mainstem Forecast Model Update: NETMISS2 by Joel Asunskis, P.E. Hydraulic Engineer, St. Louis District Water Control U.S. Army Corps Of Engineers October 30, 2007 MVS Mainstem Forecast Model Update: NETMISS2 by Joel Asunskis, P.E. Hydraulic Engineer, St. Louis District Water Control U.S. Army Corps Of Engineers October 30, 2007

One Corps Serving the Armed Forces and the Nation St. Louis District  10 rivers  5 lock & dam sites  5 Corps lakes  750 miles of levees  92 flood control systems  416 miles of navigable channel  70 pumping plants  162 recreation areas  1 hydropower plant  10 rivers  5 lock & dam sites  5 Corps lakes  750 miles of levees  92 flood control systems  416 miles of navigable channel  70 pumping plants  162 recreation areas  1 hydropower plant

One Corps Serving the Armed Forces and the Nation MVS L&D Operations  MVS is unique in the way its Locks & Dams are operated within MVD Pool Instructions:  L&D 24: “Remain at /- 0.1”  L&D 25: “Lower to /- 0.1 by 1800” Special Conditions:  Rapidly changing flows at Pools 24 and 25 can require pools to go from maximum regulated to minimum regulated pool in less than a 24-hour period ( and ).  MVS is unique in the way its Locks & Dams are operated within MVD Pool Instructions:  L&D 24: “Remain at /- 0.1”  L&D 25: “Lower to /- 0.1 by 1800” Special Conditions:  Rapidly changing flows at Pools 24 and 25 can require pools to go from maximum regulated to minimum regulated pool in less than a 24-hour period ( and ).

One Corps Serving the Armed Forces and the Nation MVS L&D Operations  Mel Price is unique in the way it operates within MVS Last dam before open-river conditions Low Water:  At approximately 5ft. gate restrictions apply  At approximately 2ft. uWith approved deviation, change maximum regulated pool to u24-hr monitoring of upstream locks and Missouri flows. uWater Control issues every gate change as needed 24-hrs/day. uCoordination with RIAC intensifies.  Mel Price is unique in the way it operates within MVS Last dam before open-river conditions Low Water:  At approximately 5ft. gate restrictions apply  At approximately 2ft. uWith approved deviation, change maximum regulated pool to u24-hr monitoring of upstream locks and Missouri flows. uWater Control issues every gate change as needed 24-hrs/day. uCoordination with RIAC intensifies.

One Corps Serving the Armed Forces and the Nation Hinge Point Operation Play Hinge Point Video

One Corps Serving the Armed Forces and the Nation Goals Of NETMISS 2  Have a model that will allow us to see and analyze the effects of pool instructions on: Hinge Point Levels Tail Water Levels Reach profiles/stages  Take advantage of the new routing technologies and Algorithms (HEC-RAS 4.0 Beta)  To improve upon operational forecasting  Have a model that will allow us to see and analyze the effects of pool instructions on: Hinge Point Levels Tail Water Levels Reach profiles/stages  Take advantage of the new routing technologies and Algorithms (HEC-RAS 4.0 Beta)  To improve upon operational forecasting

One Corps Serving the Armed Forces and the Nation NETMISS2  A Visual Basic 6.0 application Utilizes the Unsteady Flow routing capabilities of HEC-RAS 4.0 Beta Data Storage in HEC-DSS  A Visual Basic 6.0 application Utilizes the Unsteady Flow routing capabilities of HEC-RAS 4.0 Beta Data Storage in HEC-DSS

One Corps Serving the Armed Forces and the Nation NETMISS2

One Corps Serving the Armed Forces and the Nation MVS System Extents Salt River Cuivre River Illinois River Meramec River Chain of Rocks Kaskaskia River Big Muddy River Ohio River Missouri River St. Louis Lock 27 Q

One Corps Serving the Armed Forces and the Nation MVS Model Extents Salt River Cuivre River Illinois River Meramec River Chain of Rocks Kaskaskia River Big Muddy River Ohio River Missouri River St. Louis L&D 24 Pool L&D 25 Pool MP L&D Pool Middle Mississippi/ Lower Model Lock 27 Q

One Corps Serving the Armed Forces and the Nation Boundary Conditions HEC-RAS Model Uniformly Distributed Lateral Inflow U/S BC Flow D/S BC Stage Tributary BC Flow

One Corps Serving the Armed Forces and the Nation Input

One Corps Serving the Armed Forces and the Nation Model Input

One Corps Serving the Armed Forces and the Nation L&D 24 Input

One Corps Serving the Armed Forces and the Nation Model Input

One Corps Serving the Armed Forces and the Nation L&D 24 Pool Estimate

One Corps Serving the Armed Forces and the Nation Open River Rating Curve Shift

One Corps Serving the Armed Forces and the Nation Guide Curve Editor

One Corps Serving the Armed Forces and the Nation Open River Rating Curve Editor

One Corps Serving the Armed Forces and the Nation Analysis Analysis and Model Execution

One Corps Serving the Armed Forces and the Nation HEC-RAS Execution

One Corps Serving the Armed Forces and the Nation Calibration Mode

One Corps Serving the Armed Forces and the Nation N-Factor Managment  In HEC-RAS 4.0 there is a limit in the number of flow/n-factor adjustments Restricted to 30 values Requires a larger flow interval between factors for a wide range of model operation  NETMISS2 has a n-Factor repository for each model that expands allows each model to have up to 256 intervals. Tribs –>600 – 1000 cfs Illinois –>1000 cfs Missouri –>1000 cfs Upper Mississippi –> 5000 cfs Lower Mississippi –> 5000 cfs  In HEC-RAS 4.0 there is a limit in the number of flow/n-factor adjustments Restricted to 30 values Requires a larger flow interval between factors for a wide range of model operation  NETMISS2 has a n-Factor repository for each model that expands allows each model to have up to 256 intervals. Tribs –>600 – 1000 cfs Illinois –>1000 cfs Missouri –>1000 cfs Upper Mississippi –> 5000 cfs Lower Mississippi –> 5000 cfs

One Corps Serving the Armed Forces and the Nation N-Factor Management Checks Flow range RAS Time Window Goes to Netmiss2 N-Factor Repository and Gathers n-factors based on the 30 factor limit Places 30 Factors in model Plan File for Model execution and calibration When n-Factors change in the model the changes are sent to the Netmiss2 n-Factor repository and the repository is updated MODEL EXECUTION

One Corps Serving the Armed Forces and the Nation Hinge Point Check And Forecasting

One Corps Serving the Armed Forces and the Nation Hinge Point Analysis Window

One Corps Serving the Armed Forces and the Nation Open River Balancing 1. Approximate OR Level With Rating Curve – Model Computes L&D 24 Q Q Q 2. Simulate Downstream Model Profile – Compute D/S TW Level TW Swell Head 3. (TW + Drawdown) to find new Target L&D 24 Pool PL 4. Use New Target Pool To Compute new Q Q PL

One Corps Serving the Armed Forces and the Nation O O Open River and TW Balancing

One Corps Serving the Armed Forces and the Nation Forecast Report

One Corps Serving the Armed Forces and the Nation Forecast Report

One Corps Serving the Armed Forces and the Nation Current Status of NETMISS 2  Have a model that will allow us to see and analyze the effects of pool instructions on: Hinge Point Levels Tail Water Levels Reach profiles/stages  On-going evaluation of NETMISS 2 versus current operational forecast model.  Have a model that will allow us to see and analyze the effects of pool instructions on: Hinge Point Levels Tail Water Levels Reach profiles/stages  On-going evaluation of NETMISS 2 versus current operational forecast model.