BANKABILITY OF RENEWABLE & CLEANER ENERGY IN AFRICA

Slides:



Advertisements
Similar presentations
Chapter 13 Learning Objectives
Advertisements

INVESTMENTS IN POWER SECTOR
Dokumentname > Folie 1 > Vortrag > Autor Potentials for Renewables in Europe Wolfram Krewitt DLR Institute of Technical Thermodynamics Systems.
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Santa Fe, N.M. July 25,
Rebirth Capital LLC EQUITY INVESTMENTS IN COMMUNITY WIND PROJECTS SCOTTSDALE, AZ 5/9/2008.
Financing Essentials for Public-Private Partnerships United Nations SU/SSC Training Course September 19, 2006.
Financial Management –Spring 2013 Chapter 2: Financial Markets And Institutions 1.The Importance of Financial Institutions 2.The Flow of Savings to Corporations.
Commercial Bank Operations
Swaps Definitions In a swap, two counterparties agree to a contractual arrangement where in they agree to exchange cash flows at periodic intervals.
Chapter Outline Hedging and Price Volatility Managing Financial Risk
Financing Renewable Energy: an introduction to FITs and RHI Andrej Miller Renewable Financial Incentives Office of Renewable Energy Deployment
Renewable Energies in Hungary - Legislative Framework, Regulation, Support- Tamás Tóth Hungarian Energy Office.
Symposium on Private Financing for African Power Infrastructure US Treasury Department Washington, DC October 13, 2008.
Local Renewables Freiburg 2007 June 14, 2007 Tobias Kelm Centre for Solar Energy and Hydrogen Research Renewable Energy Law: Stimulating Investment in.
UNFCCC Workshop on Innovative Options for Financing the Development and Transfer of Technologies September 2004 Private Sector Perspectives on Risk.
BC Hydro’s Green Energy Initiatives
Sub-sovereign Credit Markets
EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
UK and Rwanda Trade & Investment Forum 22 nd October 2014 Confidential Changing the Game for Africa.
Chapter 15 1 Understanding Money, Financial Institutions, and the Securities Markets Understanding Money, Financial Institutions, and the Securities Markets.
Copyright © 2009 The McGraw-Hill Companies, Inc., All Rights Reserved. McGraw-Hill/Irwin.
Efficient and Sustainable Use of Biomass for Energy
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
CHAPTER 8 A framework for interpretation
Sustainable Energy at the World Bank: Policies and Experiences Anil Cabraal Lead Energy Specialist Energy and Water Department The World Bank Norway-World.
1 Role of the African Development Bank in Developing Clean Investments Mrs. Hela Cheikhrouhou – Manager Infrastructure Finance, Private Sector Operations,
 Fifth Third Bank | All Rights Reserved Vessel Financing Choices for Ferry Operators.
1 Hela Cheikhrouhou Manager, Private Sector Infrastructure Finance Africa Carbon Forum, Nairobi, March 2010 African projects and programs: Developing enhanced.
Financing Urban Public Infrastructure
Possible Modalities of Government Support for Private Clean Energy Investments/Financing Government support could be in different forms depending on types.
Investment Basics Clench Fraud Trust Investment Workshop October 24, 2011 Jeff Frketich, CFA.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Steven P Janes Sherrards Solicitors London UK CASE STUDIES:
The International Financial System
Prototype Carbon Fund Training Workshop: Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30- October 2, 2002 Eduardo Dopazo.
LEVERAGED BUYOUTS (LBOs) Prepared by: BRENDA E.PALAD Reference: Investment Banking by Joshua Rosenbaum (WILEY-FINANCE)
National Inter-Ministerial Dialogue on Climate Change Bay Gardens Hotel Castries, saint Lucia Date, 2009 Energy Sector By Bishnu Tulsie and Judith Ephraim.
How can CDM help project finance? Jan-Willem Martens, Bangkok, 5 April, 2005.
FINANCING WIND POWER PROJECTS. Project Financing is the financing of long term projects based upon a complex financial structure where project debt and.
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
1 ASIA BIOMASS WORKSHOP 2007 BANK PEMBANGUNAN MALAYSIA BERHAD FINANCING FOR BIOMASS AND RENEWABLE ENERGY ROJECTS.
1 Renewable Energy Purpose of the Power Purchase Agreement (PPA) Nebojsa Arsenijevic, BREP Manager.
Seite 1 REETA Planning Workshop, Georgetown 11./12. February 2014 Developing Public-Private Partnerships for Sustainable Energy.
Doing Business With OPIC. OPIC’s Mission Statement “To mobilize and facilitate the participation of the United States capital and skills in the economic.
RDL Utility Based Financial Incentives for Renewable Energy & Energy Efficiency in New Zealand EGNRET Workshop Honolulu, Hawaii, USA 30 March – 1 April,
Carbon Finance Strategy the World Bank Carbon Finance Strategy the World Bank CHARLES CORMIER Sept 2005.
Public Private Partnerships (PPPs) and The World Bank
Service delivery in the energy sector: Increasing private sector investment in generation & access PPPs in energy sector in Africa: Best practices and.
The Netherlands - Bulgaria Economic Relations and Co-operation.
Oesterreichische Entwicklungsbank AG - OeEB Austrian Business Circle Belgrade – Sabine Gaber / Head of Investment Finance Department OeEB.
Financial Markets & Institutions
ElectriFI An innovative funding initiative stimulating private sector investments aiming at increased access to electricity.
Presentation to Select Committee on Economic Development
Legal, Regulatory and Financial Incentive Framework to Support Landfill Gas Power Generation Project Development Presented by Leiping Wang Senior Energy.
Renewable Energy and Energy Efficiency: What’s it good for? 4 th Poverty Reduction Strategy Forum.
Access to Sustainable Energy for LAC: Solutions to Regional Challenges Structured and Corporate Finance Department Rachel Robboy Pr. Investment Officer.
European Bank for Reconstruction and Development Financing Renewable Energy Projects in Bulgaria Anton Kobakov Senior Banker RO Sofia, Bulgaria.
1. What would you do with $5,000? Be specific. 2. What percentage of taxes should the government take? 3. Where is the safest place to keep your money?
Supporting Scaled Up Private Investments in Clean Energy Infrastructure. Washington, D.C., October 6&7, 2014.
West and Central Africa Tropical Forest Investment Forum - August 2007 © EnviroMarket Ltd Forest-Backed Securities: alternative finance for tropical natural.
Clean Energy Finance Raising and Placing Capital in Energy SMEs World Bank Energy Week March 2006 Christine Eibs Singer
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Solar Market Pathways Leadership Academy
Developing Public-Private Partnerships for Sustainable Energy
16th Renewable Energy Summit
Financing of Solar power plants
Investment Alternatives
Investment Alternatives
Renewable Energy Project Investments
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

BANKABILITY OF RENEWABLE & CLEANER ENERGY IN AFRICA Prepared by Marc J.M. Buiting (m.buiting@fmo.nl)

Renewable Energy Low impact hydro, run of river or with small storage, seldom > 20MW Geothermal, wind, solar Agricultural and forestry wastes, energy crops Waste derived – landfill gas, sewage gas, mass-burn municipal solid waste Sometimes cogeneration is included

Renewable Energy 5.5 TW in 2020 Energy Demand 1995 - 2020 1997 2020 Capacity Capacity Increase Energy Demand 1995 - 2020 in GW in GW in GW in % 6,000 2,436 3,103 5,515 Hydro 703 1,036 333 47 5,000 Capacity Growth 1995 - 2020 4,000 Capacity Additions 1995 - 2020 Wind 8 63 55 688 3,079 Capacity in GW 3,000 Repla- 2020 Capacity requirement cement Biomass 667 31 54 23 74 2,000 1995 Capacity 1,000 Geothermal 8 17 9 113 1995 Year 2020 Solar/Other 1 8 8 700 $3,103 billion market of which renewables are likely to represent some 20% (being a market for new-build of some $500 billion). Total RES As share of World 751 1,178 23% 21% Total World 3,221 5,515 Source: EIA base case expectations; World Economic Outlook 2000/01.

Future holds stronger Role Developing Countries Source: EIA base case expectations; World Economic Outlook 2000/01.

Renewables still less Economic in Cost/kWh 3/28/2017 Renewables still less Economic in Cost/kWh Initieel zijn windparken met name gefinancierd op projectbasis. Windparken werden beoordeeld als IPP’s door banken en als zodanig behandeld: bepaald eigen vermogen percentage (30%) en afnamegaranties. Midden jaren 90 zijn er een aantal subsidieregelingen gelanceerd. Het gebrek aan belastingcapaciteit van elektriciteitsbedrijven heeft het gebruik van sale & lease back structuren (gebruik van fiscale capaciteit banken) in de hand gewerkt. Veelal onder garanties. Het kunnen gebruiken van de eigen belastingcapaciteit vanaf 2001 maakt project financieringen weer aantrekkelijker: delen van risico met banken. Source: PB Power.

Renewables and Direct Government Support EU HIGH Tendering NON-BANKABLE PROJECT Obligation DK Fiscal ES IR At NL T B Feed-in Tariffs Pt L It Sw G Perceived Risk UK Fr Gr BANKABLE PROJECT LOW LOW Bankability HIGH

Governmental Policy Matters 3/28/2017 Governmental Policy Matters Initieel zijn windparken met name gefinancierd op projectbasis. Windparken werden beoordeeld als IPP’s door banken en als zodanig behandeld: bepaald eigen vermogen percentage (30%) en afnamegaranties. Midden jaren 90 zijn er een aantal subsidieregelingen gelanceerd. Het gebrek aan belastingcapaciteit van elektriciteitsbedrijven heeft het gebruik van sale & lease back structuren (gebruik van fiscale capaciteit banken) in de hand gewerkt. Veelal onder garanties. Het kunnen gebruiken van de eigen belastingcapaciteit vanaf 2001 maakt project financieringen weer aantrekkelijker: delen van risico met banken. Source: World Bank.

Where is Wind Power supposed to be Installed in 2020? 85% of 2001 wind capacity is in OECD countries whereas it is foreseen that half of 2020’s capacity will be in non-OECD countries. Source: Wind Force 12, Greenpeace & EWEA.

Who will Finance the Developing World Projects? Different institutions address different risks: HIGH PUBLIC SECTOR: WORLD BANK PRIVATE SECTOR: DFI’s EXPORT CREDIT AGENCIES PE R C E I V D R S K INSURANCE COMPANIES COMMERCIAL BANKS BANKABLE INSTITUTIONAL INVESTORS CAPITAL MARKETS LOW LOW BANKABILITY HIGH Only development banks and specific funds available for projects in developing countries.

FINANCIAL STRUCTURING The General Project (Finance) Feasibility Matrix GOVERNMENT SUPPORT HIGH NON-BANKABLE PROJECT MARKET ECONOMICS PROJECT ECONOMICS FINANCIAL STRUCTURING CONTRACT STRUCTURE Perceived Risk SECURITY PACKAGE Financial market-forms / financial products Bond Investor / Lender requirements Project Sponsor requirements BANKABLE PROJECT SPONSOR SUPPORT LOW LOW Bankability HIGH

Renewable Energy: Main Banking Risks GOVERNMENT SUPPORT Acceptable country risk? Regulatory framework IPP’s bankable? Kyoto signed? (Carbon credits possible?) What scheme to support renewables? MARKET ECONOMICS Electricity shortages? Base load opportunity? Supportive industry? Specific sources (such as hydro) available that make other RES less-bankable? How does specific windpower project compare to other windpower projects? PROJECT ECONOMICS Technology to be used, efficiencies and track record turbines? Costs per MW? Use of carbon credits and subsidies from support scheme? Financing options? CONTRACT STRUCTURE Single borrower? Long term PPA possible with validity exceeding longest debt tenor? Turnkey contractor under fixed price date certain contract? Reputable O&M contractor? (in windparks often equipment vendor) SECURITY PACKAGE Product warranties? (in windparks generally a minimum of 5 years) Comprehensive risk coverage available from equipment vendors? Mortage possible on land or other assets? SPONSOR SUPPORT Reputable and experienced sponsor? Level of equity investment? Level of contingent equity available for completion?

Our Approach is Twofold FMO takes leading positions in wind and biofuel projects in Africa through structuring projects in a ‘template’ manner (portfolio approach); we support or create developers: Conventional technologies: Aldwych International Renewables Wind: Aeolus Africa Development Corporation Renewables Biofuels: Dutch Jatropha Consortium FMO focuses on sustainable renewable CDM projects (private sector only) in (non-exclusive) co-operation with the Dutch Ministry VROM.

FMOs Co-operation with the Dutch Ministry of VROM FMO can make available convertible grants in the feasibility phase of the project (early equity), equity, subordinated loan or senior debt, not necessarily in hard currency. FMO operates as a fully untied institution. Through the facility FMO offers to a Project a choice is given to the project company in a ‘net’ or ‘gross’ amount. The gross amount includes a facility that will be made available by VROM. In return for the carbon credits of a project VROM contemplates to fund upfront the net present value of 25% of 70% of the carbon credits cash flow. The other 75% of the 70% are paid against delivery of the carbon credits in the future. The upfront amount need not to be paid back when the rights accompanying this payment are actually delivered. VROM obtaines a purchase option for the remainder 30% of the future carbon credits. Contractual period is preferably 7 or 14 years. VROM assumes all responsibility for the accreditation process, including the cost involved. In addition, if needed VROM makes capacity development available for the recipient country.

Ministry of VROMs involvement Illustrative bio US$ illustrative 0.3 0.2 VROM provides an AAA-income stream to a project: - 75% of 70% of potential carbon credits contracted (quantity*price) - 30% against future price (option) 0.1 Cash flow for debt service and dividends O&M costs - 2 4 6 8 10 12 -0.5 year Investment - 1 After Tax VROM provides a possibility to lower project cost: 25% of 70% of potential carbon credits contracted (quantity*price)

3/28/2017 Renewables in Africa differ in Reference Point: Load Curve less important vs cost of HFO/Diesel fired Stations At reference prices of HFO/Diesel fired stations quite some renewable projects can be made bankable, the more with use of CDM. Power purchase agreements can be structured with Independent Power Producers at prices of EURct 6 to 9/kWh which still represent a good deal for both parties. Thank you. Average Generation Price in Africa? Initieel zijn windparken met name gefinancierd op projectbasis. Windparken werden beoordeeld als IPP’s door banken en als zodanig behandeld: bepaald eigen vermogen percentage (30%) en afnamegaranties. Midden jaren 90 zijn er een aantal subsidieregelingen gelanceerd. Het gebrek aan belastingcapaciteit van elektriciteitsbedrijven heeft het gebruik van sale & lease back structuren (gebruik van fiscale capaciteit banken) in de hand gewerkt. Veelal onder garanties. Het kunnen gebruiken van de eigen belastingcapaciteit vanaf 2001 maakt project financieringen weer aantrekkelijker: delen van risico met banken.