4 basic approaches to determining energy efficiency benefits (savings) 1.Stipulated or deemed savings 2.Individual Building Metering – Measurement and.

Slides:



Advertisements
Similar presentations
ISO New England Demand Resource Measurement & Verification Standards Manual Overview April 11, 2007 NAESB Development of DSM/EE Business Practices Washington,
Advertisements

The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
SSC-NM0053 Determination of Greenhouse Gas Emissions Reductions Based on Whole- Building Simulation of Building Mitigation Efforts Using eQUEST/DOE-2.2.
BASELINE STANDARD UNFCCC secretariat workshop
Using computer simulations to assess energy and carbon reductions in building CDM projects Joe Huang March 14, 2011.
UNFCCC secretariat Karla Solís, Programme Officer Introduction to current decisions: Recurring issues Project and Entity Assessment Unit CDM Registration.
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
Non-Residential Program Impact Evaluation Methods Gary Cullen, Summit Blue Consulting (360)
Software Quality Assurance Plan
New Paradigms for Measuring Savings
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
UNFCCC Secretariat SDM programme Wrap-up Session: Key Issues Identified and Proposals discussed Practitioners’ workshop on Standardized baselines Bonn,
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Energy Performance Analysis with RETScreen
+ Impact Evaluations and Measurement and Verification First we will focus on ‘Gross Savings’ Determination - savings determined irrespective of why 1 Kentucky.
MEASUREMENT & VERIFICATION
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Page 1 July 2014 Capacity Building of Banks/FIs For EE Project Financing Capacity Building of Banks and Financial Institutions for Energy Efficiency Project.
There is Much More to Protocols than Good M&V Steve Kromer Chair, IPMVP Inc. Paolo Bertoldi European Commission DG JRC.
Steps of a sound simulation study
Dairy Milking Machine Vacuum Pump VFD Savings Calculator Follow-up from the last RTF meeting with more field data Regional Technical Forum December 7,
Environmental Impact Assessment (EIA): Overview
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
1 Ex Ante Review of the SBD Program Energy Division Staff and Contractors Energy Efficiency Industrial/Agricultural Programs and Portfolio Forecasting.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Chapter 8: Problem Solving
Practical Experiences in Applying Savings M&V
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Common Carbon Metric for Measuring Energy Use & Reporting Greenhouse Gas Emissions from Building Operations A tool developed by GHG Protocol and UNEP-SBCI.
PACE Technical Standards Eddy Trevino, P.E., Program Manager State Energy Conservation Office August 2015.
Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities Review of approved and proposed.
© 2009 AirAdvice, Inc. Increasing Profitability Through Energy Services A Comprehensive Program To Deliver Energy and Sustainability Services.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Center for Energy and Environment Cost Effectiveness Determination & Benefits and Resources Russ Landry, PE, LEED® AP Center for Energy and Environment.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
WERST – Methodology Group
Comparison of CA Evaluation Protocols, CA Framework, IPMVP and CPUC Policy Manual* A preface to group discussion *In terms of how they define.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Energy Project M&V: Reports that Add Value October 27, 2015.
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
CDM Project Design Document CDM Project Design Document Training Course May 22, 2003 CCIC Conference Room Manila Observatory Ateneo de Manila University.
Metering and Measuring of Multi-Family Pool Pumps, Phase 1 March 10, 2016 Presented by Dan Mort & Sasha Baroiant ADM Associates, Inc.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Click to add title SABS:SANS 50010:2011 M&V Standard for 12-L Tax Incentives Section 12-L Energy Efficiency Tax Incentive Workshop Karel Steyn SABS TC.
1 Detailed EM&V Approach for each of BGE’s Proposed Conservation Programs January 10, 2008.
EIA approval process, Management plan and Monitoring
Tracking Progress for Building Efficiency Accelerator
(Additional materials)
Small-Scale Projects Under JI
MECH 3550 : Simulation & Visualization
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
EM&V Planning and EM&V Issues
Presentation transcript:

4 basic approaches to determining energy efficiency benefits (savings) 1.Stipulated or deemed savings 2.Individual Building Metering – Measurement and Verification (all buildings or sample) 3.Individual Building Calibrated Simulation (all buildings or sample) 4.Large Scale Data Analysis 1

Issues for Small Scale Building EE Methodologies Background Approved building related Small Scale methodologies (AMS-II.E, AMS-III.AE) oved oved Proposed new methodology under consideration NM gies/pnm/byref/SSC-NM053 gies/pnm/byref/SSC-NM053 See Handout 2

Issues for Simulation Methodology Overall question: What is the applicability and reliability of using computer simulation for determining energy savings in buildings (for both retrofit of existing buildings and new construction activities), in the context of CDM? 1. Is this approach reliable and conservative? If not, what changes may be possible, in terms of:(a) Identifying the baseline building(s), particularly for projects involving new construction; (b) Collection of model input data; (c) Conditions, procedures and requirements for model calibration; (d) Procedures and data collection for post-retrofit buildings;(E) The type of buildings for which simulation is applicable and different requirements for each - for example, new construction versus retrofit and residential versus commercial and multi-family buildings 2. What could the requirements and procedures to:(a) Ensure integrity and validity of model inputs and model default values, e.g. mitigate possible effects of the subjectivity of the modeller, avoid hidden default values in the model? (b) Account for possible change of use patterns (e.g., change of occupancy, change in appliance lifetime or in the life time of the building itself. (c) Monitor data for simulation, calibration, or cross checking, etc. (d) credibly validate/verify by a 3rd party entity, as required by CDM, the model simulation (inputs, calculation, and calibration) - What are the procedures that a doe should follow when reviewing a computer simulation based pdd 3. Are there any specific methods to safeguard/crosscheck and enforce the reliability of computer simulation approach? 4. How does the reliability and applicability of computer simulation compare with the alternative approach of metering with or without a control group?5. Should a methodology specify qualification requirements for computer simulation modelers and if so, what are those requirements? 3

Narrow Down to 3 Questions for Today 1. What are advantages and disadvantages of modeling versus metering approach (MP is developing a metering based/control group methodology) for buildings 2. How to define baseline/reference/benchmark buildings? 3. How to ensure reliability and conservativeness of the calibration process? 4

Deemed Savings Approach Deemed savings are used to define savings values for projects with well-known and documented savings values. – Deemed Measures values: For simple efficiency measures whose performance characteristics and use conditions are well known and consistent, a deemed savings approach may be appropriate – Deemed Calculated Measures. A slightly more complex approach to estimating savings is to use simplified, pre- defined calculations that employ a combination of deemed or default input assumptions with some site-specific inputs. The use of deemed values in a savings calculation is an agreement to accept a pre- determined value, irrespective of what actually happens. Deemed values and deemed calculation approaches are often documented in a Technical Reference Manual 5

+ IPMVP : Retrofit Isolation and Whole Facility The Whole Facility Options: 6 The Retrofit Isolation Options: Whole Facility Measurement Boundary Motors + VSDs Retrofit Isolation Boundary

Large-Scale Data Analysis Equations Time Series Savings = Q pre-installation – Q post-installation Comparison Group Savings = Q non-participants – Q participants Comparison Group – Time Series Savings = (Q pre-installation – Q post-installation ) participants – (Q pre-installation – Q post-installation ) non-participants 7 preferred

Calibrated Simulation Typical Applications: Multifaceted energy management program affecting many systems in a facility but where no meter existed in the baseline period - new construction Energy use measurements are used to calibrate a simulation. Baseline energy use, determined using the calibrated simulation, is compared to either: – a simulation of reporting period energy use, or – actual meter data. Copyright 2011 Schiller Consulting, Inc. 8