Blue Book Roll Out Revised 2004. Expectations Expectations: NOAA Fisheries “ODOT has spent significant effort updating the Guide and making modifications.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

ENVIRONMENTAL AWARENESS
WATER QUALITY ANALYSIS for ANTIDEGRADATION
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
NEW PROGRAMMATIC CATEGORICAL EXCLUSION AGREEMENT A WORK IN PROGRESS… ODOT—Office of Environmental Services Environmental Update Meeting20 November 2014.
Introduction to Compliance Assistance Documents Part I.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Aid Highway Programmatic.
Utah Watershed Coordinating Council Conservation Planning Workshop Navigating the Corps’ Permitting Process July 20, 2011 Jason Gipson Chief, Utah/Nevada.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
May 17 th,  Overview of endangered species regulations  Purpose of Habitat Conservation Plans  Review Balcones Canyonlands Conservation Plan.
MNR’s Role February 6 th, 2014 Presented by Kerry Reed, Species at Risk Biologist 1.
Oregon Jobs and Transportation Act Section 18 CETAS Director’s Meeting Action Items.
Endangered Species Act
BIOLOGICAL RESOURCES Ken Cannon ODOT Aquatic Biology and Fish Passage Program Coordinator.
Fish and Wildlife Coordination Act (FWCA) Protecting and Conserving Fish and Wildlife Resources Ch. 4 Mod. 1 – HO#10.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
West Texas Legislative Summit ENVIRONMENTAL ISSUES Environmental Regulations Affecting Transportation Carlos Swonke Director, Environmental Affairs Division.
The Field Office Technical Guide and Other Technical Resources CNMP Core Curriculum Section 2 — Conservation Planning.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Module 7: Construction Phase
Marine Corps Air Station Miramar
 “ Wildlife conservation is the practice of protecting endangered plant and animal species and their habitats. Among the goals of wildlife conservation.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Taking the Next Step: Implementing the TMDL. What IDEM Provides to Help With Implementation  Compiling all the data in one place  Data-driven recommendations.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
The Balcones Canyonlands Conservation Plan, Balcones Canyonlands Preserve, & Public Service Infrastructure William A. Conrad Secretary BCCP Coordinating.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Roles & Responsibilities Project Biologist.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Highway Aid Programmatic.
Watercourse DPA District of North Vancouver Streamside DPA Development Permit Area for the Protection of the Natural Environment: Streamside Areas Public.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Endangered Species Act Counterpart Regulations for National Fire Plan Projects Bureau of Land Management Forest Service June 9, 2004.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Mission, Brender, and Yaksum Creeks Habitat Conditions Low flows and associated high temperatures affect distribution and abundance of native species.
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
Barb Loida, Carolyn Adamson, Dave Bauer MECA 2014.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
The Endangered Species Act 1973, 1982, 1985, 1988 (ESA) By Anais Teyton Function: Promotes the conservation of the listed endangered and threatened worldwide.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
NOAA RESTORATION CENTER The NOAA RC seeks to make the process of regulatory review and permitting of environmentally beneficial habitat restoration projects.
Proposition 1 Workshop: the Grant Application Process July 2015.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
Draft Generic Environmental Impact Statement for Adoption of Stream Corridor Management Regulations for the Lake George Park.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
National Flood Insurance Program ESA Consultation for Online Information Sessions May 11 th and 12 th 2016 Oregon.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
USING STEWARDSHIP AUTHORITY TO ADVANCE RESTORATION Mae Lee Hafer Regional Stewardship Coordinator Collaborative Restoration.
Leading Your District To Be All That It Can Be David Williams, Deputy Director Div. of Soil & Water Conservation 2016 Spring Area Meetings.
Environmental Issues Update - Endangered Species 1.
Hampden Township Stormwater Management Program
Environmental Compliance & Bridge Maintenance
Programmatic Agreements
2015 FAHP Annual Meeting For Oregon’s Programmatic Endangered Species Act Consultation on the Federal-Aid Highway Program March 15, 2016.
FWC Updates for 2018 (so far…)
Construction Management & Inspection
Endangered Species Act (1973, 1982, 1985, 1988)
Section 4(f) Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
INDOT Storm Water Management
CEOS Organizational Matters
2013 Preconstruction Managers Meeting
Presentation transcript:

Blue Book Roll Out Revised 2004

Expectations

Expectations: NOAA Fisheries “ODOT has spent significant effort updating the Guide and making modifications to improve protections for fish or to better reflect the implementation of RRM practices… NOAA Fisheries approves the 2004 Guide ‘continuing approval depends on ODOT careful adherence to the program”

Expectations: State Maintenance Engineer ODOT maintenance employees have demonstrated over and over that they value the environment. The update of the ‘Blue Book’ isn’t intended to suggest that ODOT staff isn’t valuing and protecting the environment; rather it is to formalize practices that have been agreed to by regulatory agencies because they have been demonstrated to best minimize impacts to the environment from our work. The importance of the guidance is in promoting consistent, recognized procedures that will assist ODOT maintenance in continuing to do what we can do to protect the environment while accomplishing our work”. Doug Tindall State Maintenance Engineer July 2004

New Blue Book Overview of 4(d) and the 4(d) Rule Discuss Roles and Responsibilities Define Professional Judgement What is and is not included in 4(d) Use and Lay out of the document New Activities, Expanded BMPs Overview of major differences

Overview of 4(d) Endangered Species Act- prohibits ‘take’ of plants and animals that have been listed as ‘threatened’ or ‘endangered’. ‘Take’- Harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect. 4(d) allows exemptions to Endangered Species Act under certain guidelines

4(d) Rule Guidelines for ODOT include: –Implement program as described in Blue Book –Implement best management practices described in Blue Book –Submit annual report –Review Blue Book every 5 years –Coordinate with NOAA Fisheries on changes

Roles and Responsibilities Every maintenance employee has role in success of program Maintenance managers-training and implementation of Blue Book, add to performance work plans, relay info to Office of Maintenance on training, modifications, resolution to problems, etc. Maintenance staff- implement BMPs, relay changes, modifications, problems to Manager/Coordinator

Roles and Responsibilities Region Environmental Coordinator- coordinate involvement of technical experts, provide technical input, coordinate permits, other documents Region Biologist- coordinate fish salvage, provide technical input on BMPs as appropriate

Roles and Responsibilities ODFW- local expert on conditions, technical input on BMPS: salvage, habitat restoration, fish passage laws, etc. Office of Maintenance- oversee implementation of statewide program; develop annual report; coordinate negotiations with NOAA and ODFW; work with Districts on problems and issues.

Professional Judgement Flexibility described in Blue Book: where appropriate, where feasible.. Does not allow for convenience of crew or ease of operation in not implementing BMP Does allow local manager to make determinations based on local conditions such as weather, traffic, land features, FHWA guidelines, etc. These modifications must be reported to OM for reporting.

Communication Loop

What’s Included in Coverage of 4(d) NOAA Fisheries coverage for ROUTINE ROAD MAINTENANCE work being performed by: Maintenance Staff Maintenance Contractors- contracts are being addressed to include the Blue Book 3rd party entities operating on the ROW under Intergovernmental Agreement or Memorandum of Understanding

What’s NOT Included in 4(d) Coverage ANY Activity that requires a Corps permit Activities where federal fish species are ‘endangered’ Any activity that requires coordination with US Fish and Wildlife Agency- plant, bird, critter

What’s NOT Included in 4(d) Coverage Activities that widen or increase road prism- additional environmental documentation may not be required, coordinate with REC

What’s NOT Included in the (4)d Herbicide and fertilizer applications- Maintenance still performs these activities; however, the exemption to ‘take’ does not include them. If there is a problem, NOAA Fisheries will investigate.

What’s NOT Included in the (4)d Cultural/archeological concerns Entities operating on ODOT ROW with ODOT permits (permit language covers laws)

Use of the Document Provide guidance for the routine daily maintenance activities Review prior to seasonal activities Review RAZ/RES maps with the document when planning work Note on maps local considerations discussed in Blue Book Review at meetings when appropriate Hold ‘tailgate’ reviews before starting jobs

Layout of the Document Introduction: includes description of the 4(d) rule, background, overview of programs being implemented by Maintenance Activities descriptions, goals, best management practices- References, supporting documentation

Expanded BMPs Each activity has a goal Most activities have expanded descriptions BMPs are numbered: ease of documentation Separated activities for clarity: 116/117 for example Expanded discussions on activities: culverts, vegetation

Activities Added Stormwater management- Maintenance yards- complements other activities at yards Void filling Tree corridor management Temporary Water Management/Fish Salvage Sign Installation Striping Dust abatement

Significant Differences- just the highlights Stormwater Management Shoulder Rebuilding, Voids, and Ditching Bridge Activities Culverts Drift Vegetation

Stormwater Management Any new impervious added by Districts to be tracked Addresses yards- fuels, oils- complements other maintenance programs Adds general BMPs for good housekeeping

Voids Direction on what to do around water when needing to fill void Use foam or other quickset before using concrete

Shoulder Rebuilding Ditching Provided pictures that define what is allowable for shoulder rebuilding without permit If outside these limits, need permit Revised “When is a waterway permit needed for ditch maintenance” table References erosion control field guide

Okay to bring up material or add new to existing, if not changing backslope, stability Okay to add new material to adjust to road surface Contact the REC Prior to Changing Prism to increase road or shoulder width.

Culverts May need permit- coordinate early Expanded discussion beaver dams Defined debris/beaver dam removal 20’ from culvert as culvert work, outside 20’ is channel or ditch work Fish passage requirements- ORS when activity affects structural integrity of culvert

Vegetation management Program best management practices that are independent of any specific activity Tree corridor plans Coordinating on visual corridor requests Coordinate on removal of riparian trees within 150 feet that stabilize bank or shade river

Drift Removal Priority for removal: – turning and floating; –remove to riparian area out of channel; –remove and place downstream; –cut and turn to float Section 10 waters (tidal influenced) need permit to remove imbedded drift- working to get regional multi- year permit

Bridge Activities Revised ODFW letter Treated timbers- follow guidance from NOAA- May need permits Stop work and coordinate if nesting birds found If using pile drivers, coordinate

Where do we go from here ? Review Blue Book regularly Plan work with RECs If BMP doesn’t work, contact Coordinator Coordinators, if BMP doesn’t work, contact Office of Maintenance Document good things Figure out how to document implementation

Next up…a day in the life of an unfortunate bridge

That’s All Folks