AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.

Slides:



Advertisements
Similar presentations
HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.
Advertisements

AHCAL Mechanics and test beam setups status report Karsten Gadow AHCAL Main Meeting DESY,
Optical Fiber Calibration System and Adaptive Power Supply Jiri Kvasnicka, Ivo Polak, Jaroslav Cvach Prague, Institute of Physics Gerald Eigen,
ATLAS MDT Electronics Status ● ASD Chip Design (with Harvard) and Production – Full Rad-Hard test campaign completed – Production order for 67,400 parts.
LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
Laura Gonella ATLAS-CMS Power Working Group, 08/02/2011
2013 MAR 21Ivo Polák FZU Prague1 Tasks for AIDA SiPM Adaptive HV PSU AIDA subgroup Prague 2013 meeting Characterization of temperature influence to SiPM.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
Front End DAQ for TREND. 2 Introduction: analog part 2015, feb 10 th.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne,
FE-I4 Test Setup Hardware Needs: Boards & Interfaces March 1 st 2010, Marlon Barbero.
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL electronics. Status Module Production an Power Pulsing Mathias Reinecke AHCAL main meeting DESY, Dec. 10th, 2013.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
Visit to CALICE ECAL testbeam (by Shinshu) at DESY, 16 th – 19 th October 2012 Samir Arfaoui & Erik van der Kraaij 30 th October 2012.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
12/17/01 Ron Sidwell 1 Run2b Datapath 17 Dec Update Bill Reay, Ron Sidwell, Noel Stanton, Russell Taylor, Kansas State University.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 with HBU2 test Ivo Polák, on behalf of Prague’s group
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Mathias Reinecke EUDET Annual Meeting 2008 – NIKHEF AHCAL Power Aspects P. Göttlicher, M. Reinecke, H.-J. Wentzlaff for the AHCAL developers.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
HCAL Modules -First Ideas Mathias ReineckeHCAL – MPI meetingJan Motivation 2.Mechanical Constraints 3.HCAL Base Unit (HBU) 4.Light Calibration.
Bart Hommels for the DIF WG Electronics/DAQ for EUDET, DESY DIF status AHCAL, DHCAL, ECAL DIF prototypes Ongoing developments & plans.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
AHCAL LDA CALICE electronics and DAQ Meeting DESY Hamburg, Dec. 10, 2012 André Welker Bruno Bauss, Volker Büscher, Reinhold Degele, Sascha Krause, Yong.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Development of T3Maps adapter boards
LED notched fibre system short HBU0 party with QMB6
Wing-LDA Timing & performance Beam Interface (BIF)
AHCAL Beam Interface (BIF)
Status of HBU, EBU and SM_HBU
AHCAL Detector Interface electronics
CALICE meeting 2007 – Prague
HCAL task status report
Testbeam Timing Issues.
LED notched fibre system at AHCAL Calibration system for SiPM
HCAL Modules -First Ideas
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
Presentation transcript:

AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 2 Outline Detector Layers at CERN Testbeam 2014 > CERN testbeam 2014  Setup  Old Problems > New DAQ Interface modules > HBU3 (DESY) and SM_HBU3 (Mainz-DESY)

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 3 CERN testbeam Setup > 11 single-HBU layers, including 3 ScECAL and 1 SM_HBU layers. > 4 big 2x2-HBU layers. > More than 3800 detector channels. > Very stable operation (DAQ talks).

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 4 Old Problems > Arbitrary operating conditions: Stuck TDC, spontaneous noisy channels, > SPIROC re-programming/reset does not help, only re-powering helped. > Big 2x2 layers concerned more often. > Corrected switch-on procedure did not help as in the past.

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 5 One Approach to find the Reason > Problem still seems to be related to switch-on => Test of supply voltages: > VDDA and VDDD switch-on time different – but no spikes. > Cable diameter between MPOD and modules must not be too small!! Currently too high voltage drop. VDDA VDDD regulator- input (+6V) Single HBU 2x2 HBUs, worst case VDDA VDDD regulator- input (+6V) 400µs2ms

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 6 Old problems – status > Assumption: SPIROCs in undefined state after power-up. Only re-powering changes situation. > Situation could not be reproduced in Hamburg with 1x2 HBU setup. > Situation not stable at CERN: Problems could be solved at first (termination of the open-collector signals on DIF), but then situation got worse continuously for big layers (hints: could be temperature-related). > Needs testing with setup in Hamburg.

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 7 Redesign DAQ Interface modules > (Not only) for 2015 testbeams, new DAQ Interface modules (DIF, CALIB, POWER, CIB) are needed. > Redesigns will address:  Power pulsing (adaptation blocking capacitors, reduce voltage drop on slab).  Better switch-on procedure (to be discussed with Omega).  Software controlled SiPM bias voltage. > Redesigned modules compatible to current HBUs/Flexleads. > DIF needs biggest change: FPGA is outdated => XILINX Zynq from LDA. > Completion (hard- and software) till May 2015 is a risk! > Schedule for SPIROC3? This needs a change of the DAQ modules as well.

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 8 HBU3 and SM_HBU3 > 2 new members in the HBU family: HBU3 and SM_HBU3. > HBU3: improved LED system and special features for power pulsing. > SM_HBU3: Based on HBU3 design, cooperation Uni Mainz / DESY. > SM_HBU3 uses Hamamtsu surface mounted SiPMs on the HBU’s backside: > See details and results in Phi’s talk tomorrow. SM_HBU3 backside with SMD SiPM pad

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 9 Conclusions / Questions > HBU2 and HBU3 work fine, both boards are in operation. > Switch-on behavior needs understanding. > Testbeam Setup will be operated in Hall West for tests. > New productions (inner- and outer detector) ahead. W/O redesign? > Slab-Test in FE-lab needed: Conclusions from last slab test are in HBU3, but could not be tested so far!

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 10 Backup Backup Slides

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 11 DAQ Interface Boards – Redesign Plans > Open-collector termination voltage (1.1V) switchable by software (switch-on procedure). > LVDS inputs ac-coupled with initial state definition. > New FPGA (Zynq? Spartan6?). Cost… > Regulator enable signals (power_group_enable 1,2) from DIF to POWER (switch-on procedure). > Enable signals for LVDS outputs (to SPIROCs) with pulldown. > Use 0603 components, more test points. DIF changes:

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 12 DAQ Interface Boards – Redesign Plans > Blinking LED to be switched off (only software change). > Output (Lemo or jumper) for Trig_Ext (charge-injection tests) > Enable signals for LVDS outputs. > Unused input pins to jumper. CALIB changes: > Software controlled bias voltage adaptation with linear characteristic. > Automatic temperature compensation (Prague)? > Cooling setup for VDDA. > Unused spare input pins to jumper. POWER changes:

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 13 DAQ Interface Boards – Redesign Plans > Landing fields for VDDA/GND as on HBU3. > Regulator enable signals (power_group_enable 1,2) from DIF to POWER. > Enable signals for LVDS outputs. > Room for cooling pipes? > Mini-HDMI connector? > Wire unused traces DIF/POWER/CALIB (spare lines for later functions). CIB changes: