CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT 09.02.2009.

Slides:



Advertisements
Similar presentations
MCS LWC MAGNUM ORIGINAL CONCEPTS  Designed to Control Loop Systems  Build to be generic and handle many configurations of Loop Controllers  Type of.
Advertisements

CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
Inputs: Digital and 4 configurable for Digital or 10 bit Analog Outputs:4 - 8 amp Relays or 700ma Transistors (1 PWM) 4 Line by 18 Character fully.
Functional Analysis and Control System for the Thermosiphon Chiller Lukasz Zwalinski PH/DT/PO - Cooling.
Introduction To Programmable Logic Controllers
UNICOS Objects (CPC) 11/02/14 UNICOS, CERN1 CERN, EN/ICE, UNICOS Team.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
IBL CO 2 UNICOS CPC6 based control system Lukasz Zwalinski – PH/DT/PO.
Pump Application Interface. 30 October 2006 Overview Increases the functionality of the soft starter for pumping applications - four additional trip inputs.
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
20/10/ PHOS Cooling status (1-20 Oct) Brief 28 Sep start cool down. Steps was: +5, -3, -10, -15, -20, -25, -30°C (by liquid).
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
MARCO UNICOS based control system CERN Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
IBL cooling thermal chock incident 15 October The IBL cooling team.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Unicos Object Library Programming Templates IOError / IOSimu for I/O object  IOError --> Hardware Electrical failure (i.e mA open loop). Detected.
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
AIDA Traci commissioning LHCb – CO 2 cooling meeting 18 March 2015 Kamil Wojdyla, Lukasz Banasik, Nicola Spadavecchia, Tomasz Kucharski, Piotr Dziurdzia,
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
IBL cooling operation at bake-out IBL CO2 meeting 10 April 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez 1.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
Magnum Chiller Plant Manager
«BE-RF-PM» CLIC prototype two-beam modules Thermal test planning Fabrizio Rossi.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
TRACI Status Meeting Overview of the TRACI 100-W CO 2 cooling machine Bart Verlaat 22 September
60kW Thermosiphon control system
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Report on testing Snake2 u-channel. P. Jalocha & J. Buytaert. 8 June 2015.
1 ESS Cryogenic regulation loops proposal  Thermal shield  Power Couplers double-wall  CM cool down  Stand by and nominal operation  CM warm up Bertrand.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
Thermo-siphon Control Design Lukasz Zwalinski – PH/DT Alexandre Moraux – PH/DT
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
Chiller + Brine + Water control system UNICOS CPC Lukasz Zwalinski – PH/DT.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Equipment Familiarization Hanse Environmental Inc. VTC Series.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
UNICOS-CPC course - CERN EN/ICE Industrial Controls Engineering Department Deployment of the CPC6 control application Marc Quilichini
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
UNICOS Application Builder Architecture
Experience in Design and Implementation of CO2 Cooling Control Systems
IBBelle: Status & Plans
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 3: PLC architecture UCPC 6 UNICOS-Continuous Process.
Gaseous N2 -196⁰C Vacuum Liquid N2 -196⁰C Radiation shields Outer wall
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Control Logic for ATLAS Thermosiphon chiller brine and water circuit
Forum on Tracking Detector Mechanics - Bonn, May 2016
“Update on Software Development for the Thermal Tests”
MAUVE CO2 cooling review
ATLAS Thermosiphon Electrical Distribution and Run Modes
Chiller Plant Manager (CPM)
Heating Unit Controller at NSRC SOLARIS
© HiTec Zang GmbH - HRE - 25/07/ GMix41.pps
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
TS2 PSS Software Requirements and Software Design
CO2 progress and issues on the control systems
Presentation transcript:

CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT

Requirements for test stand: 32 Analog Inputs 4 Analog Outputs 32 Digital Inputs 32 Digital Outputs SCADA system with long term logging Requirements for CO2 test stand L.Zwalinski – PH/DT CO2 test stand control system

There will be one PCO with 3 option modes driven by allowance table Plant operation L.Zwalinski – PH/DT CO2 test stand control system StopStand-ByRun Stopx10 Stand-By1x1 Run11x Switch between modes is executed manually by the operator request. Start interlock: all requests are blocked when ON SI1 – NO Option Mode Selected Temporary Stop interlock: sends OFF request to the object when ON TS1 – NO 24V PS01 Status OK; [10s delay] Full Stop interlock: sends OFF request to the object & waits acknowledge when ON FS1 – NO Process Stop Button OK OR NO Process Stop OK; [2s delay] FS2 – HPC Pressure Switch Low =1 OR Pressure Switch High =1 [5s delay] FS3 – Pump Thermal Switch TSL1101 [5s delay] Configuration logic: FeedBackON = True IF CO2 PCO (Run Order & One of the option modes selected) FeedBackOFF = False IF NO CO2 PCO (Run Order & One of the option modes selected) CO 2 PCO

Plant operation L.Zwalinski – PH/DT CO2 test stand control system Start up 1 CO 2 PCO T1 Cool down loop Safety position 3 0 Cool down accumulator T2 T0 Start up request Cool down request Cool down accumulator request In option mode Stand-By we can distinguish stepper with 4 steps associated Safety positionIt is preparation step before plant start up. All objects are switched off. Start upAccumulator is heated up to 27C. When TRUE loop should be filled with liquid and then pump might be switched on. Cool down loopOnce liquid circulation is achieved chiller might be switched on. Accumulator is still kept at high pressure and the condenser will sub-cool the liquid. This is important to assure that CO2 is out of the 2-phase region flowing sub-cooled liquid in to the pump. Cool down accumulatorstarting the accumulator cooling spiral Transition conditions: T0 = Not Run Order OR Not Option Mode Stand-by T1 = Run Order & Option Mode Stand-by & liquid circulation is achieved  Pump ON & FT1901 > xx T2 = Run Order & Option Mode Stand-by & TT1110 – 30C < TTsat(calculated from PT1104)

Accumulator Control PT1103 Acc. T sp PID MV SP EH1104 Out High limit Out Low limit Low limit High limit 0% Dynamically calculated f(R th ) 0 ÷ 100 % PID Out Low limit Out High limit MV SP P sat (Tsp) CV1104 Low limit High limit Dynamically calculated f(sub-cool) 0 ÷ -100 % 0% OutO IF > 0 Then EH ON ELSE OFF IF < 0 Then CV ON ELSE OFF Analog Digital Object Analog Object PWM 0 ÷100% PWM 0 ÷100% L.Zwalinski – PH/DT CO2 test stand control system

Accumulator Control calculated every 5s Thermal resistance: CO2_B158_PC1104minRth50 mK/W CO2_B158_PC1104maxRth75 mK/W CO2_B158_ PC1104OutHmin25 % CO2_B158_ PC1104OutHmax100 % subcool = T sat (PT1103) – TT1110 Sub cooling: CO2_B158_PC1401scH5 K CO2_B158_PC1401scL3 K CO2_B158_ PC1401OutLmin-10 % CO2_B158_ PC1401OutLmax-100 % L.Zwalinski – PH/DT CO2 test stand control system

Interlocks Pump_ST1IF TT1101 > ? o C Then Pump OFF Pump_ST2IF CB_Pump_OK = FALSE Then Pump OFF HPC_ST1IF TT1110 < -55 o C Then HPC OFF HPC_ST2IF (PSL OR PSH) = TRUE Then HPC OFF HPC_ST3IF CB_HPC_OK = FALSE Then HPC OFF EHHPC_ST1IF CB_EHHPC_OK = FALSE Then EHHPC OFF EHHPC_ST2IF HPC.OffST = TRUE Then EHHPC OFF ???? EH1101_ST1IF CB_EH_OK = FALSE Then Heater OFF EH1101_ST2IF TT1101 > threshold Then Heater OFF EH1102_ST1IF CB_EH_OK = FALSE Then Heater OFF EH1102_ST2IF TT1102 > threshold Then Heater OFF EH1102_ST3IF TS = 1 Then Heater OFF EH1903_ST1IF CB_EH_OK = FALSE Then Heater OFF EH1903_ST2IF TT11## > threshold Then Heater OFF L.Zwalinski – PH/DT CO2 test stand control system

logic L.Zwalinski – PH/DT CO2 test stand control system STOP Safty position Start-upCool down loop Cool down accumulator Run EH1101 Pump oil bathOFF Reg TT1101 SP= EH1102 DumperOFF Reg TT1102 SP = EH1104 AccumulatorOFF Reg PT1103 SP=27C OFF EH1301 ChillerOFF ON EH1903 after supply/return HXOFF IF TT C ≤ Tsat(PT1105) AND Manual On Request = True THEN EH1903 = ON EH1903.AuPosR (Positon request = power) (hrequested - h3) * Øm CV1104OFF Reg PT1103 SP= PumpOFF IF TT1110 – 3C < TTsat(calculated from PT1104) THEN ON ChillerOFF IF TT1110 ≥ -55C Then Chiller = ON Else Chiller = OFF

Enthalpy control Øm = Qexperimet / (h5 - h4) Enthalpy (kJ/kg) Qheater = (hrequested - h3) * Øm It is not possible directly control the enthalpy in a PID loop. The enthalpy must be derived from measured pressure and temperature and always be present in the liquid phase which means that measured temperature should be at least 2C lower than calculated Tsat. IF TT C ≤ Tsat(PT1105) THEN enthalpy calculation ON The enthalpy of point 3 can also be in the 2-phase area The PLC is calculating enthalpy of a point 2 from measured temperature (TT1103) and pressure (PT1105). Tsat = B / [ln(P)-A]-C A = B = C = L.Zwalinski – PH/DT CO2 test stand control system

UNICOS user interface L.Zwalinski – PH/DT CO2 test stand control system

Software preparation SCADA server Logic Generator Instance Generator Specyfication SIEMENS PLC UNICOS project creation: 1 – Exel specyfication preparation 2 – PLC hardware configuration 3 – PLC & PVSS instance generation 4 – Process logic programation 5 – Code compilation 6 – Loading to PLC 7 – Commisionig & operation All generated files will be kept in Subversion Version Control (SVN) service. L.Zwalinski – PH/DT CO2 test stand control system