BC Electric Market Overview Central Asia Delegation 30 January 2013 Doug Robinson Canadian Entity Secretary BC Hydro - Generation.

Slides:



Advertisements
Similar presentations
The Power Grid ELEC 403 The Citadel Mark McKinney.
Advertisements

Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Overview of the U.S. Electrical System & the Bonneville Power Administration (BPA)
1 Managing Uncertainty in Generation, Inventory and Revenue January 23, 2011 AMS Meeting AMS SHORT COURSE: HYDROLOGIC PREDICTION AND VERIFICATION TECHNIQUES.
Current Northwest Energy Issues A BPA Customer Perspective Dan James PNWA Summer Meeting June 23, 2014.
Understanding Ontario’s Electricity System
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
Energy Year 2013 Electricity Finnish Energy Industries.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
INTRODUCTION  British Columbia has committed to become energy self-sufficient by 2016 and generate 3,000 MWh additional (insurance) energy.  Currently.
Our Country’s Neighbor.  Continent stretches from Canada to Panama  3 rd largest continent in area  4 th largest continent in population.
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
Regions of North America: Canada
Federal Columbia River Power System Operations Planning.
Ms. Rivard Social Studies
Thailand, May 2009 Mekong Energy and Ecology Network The First Mekong Energy and Ecology Training.
Natural Gas Markets and Reliability of the Electric Power Industry William Trapmann, Energy Information Administration Natural.
Today’s Bell Have a seat Get out a pencil and a blank sheet of paper
Population about 34 milion Area about 10 milion km 2 Capital city Ottawa Currency canadian dolar (CAD) Language english, french Government federal parliamentary.
©2003 PJM Factors Contributing to Wholesale Electricity Prices Howard J. Haas Market Monitoring Unit November 30, 2006.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
CANADA.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Official Name: Canada Capital: Ottawa Government: Federal constitutional monarchy Religion: Catholics, Anglicans, United Church of Canada's Official Language:
1 BC Generation Overview Central Asia Delegation 30 January 2013 Doug Robinson Canadian Entity Secretary BC Hydro - Generation.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
1 The Future of SAPP, WAPP, CAPP, and EAPP – With Inga IEEE GM 2005 San Francisco June 15, 2005 PURDUE UNIVERSITY F. T. Sparrow Brian H. Bowen Zuwei Yu.
Wind Generation in New Zealand Kieran Devine, Doug Goodwin System Operations Transpower New Zealand Limited.
WCOAEE Meeting: Natural Gas & Electric Update April 16, 2015.
Earthquake Response and Recovery Planning at a Major Canadian Electric Utility Presented by Doug McLeod Disaster Preparedness Coordinator BC Hydro British.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Diagram from the publication
Regions of Canada.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
California Short-Circuits Itself What happened to deregulated electricity? Robert J. Michaels Professor of Economics California State University, Fullerton.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
The following slides provide information about integrating wind energy into the electricity grid. Photo by Dennis Schroeder, NREL 25907NREL
Understanding the Impacts of Incremental Gas Supply on the Flow Dynamics Across the North American Grid Canadian Institute Vancouver, BC November 20, 2006.
Canada. Terms Tundra- an area where the tree growth is restricted by low temperatures and short growing seasons.
CANADA Our Neighbor to the North. Location Canada is bordered by the Atlantic Ocean to the east and the Pacific Ocean and Alaska to the west. It is bordered.
The Commonwealth of Virginia 2016 State Contracts Meeting – Compass Energy Placeholder.
RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission.
June 17, 2015 (Regina) June 18, 2015 (Saskatoon) SaskEnergy 2015 Rate Application.
Ahmed Kaloko, Ph.D. Director Bureau of Conservation, Economics & Energy Planning Harrisburg PA COMPARISON OF PJM-ISO WITH CALIFORNIA-ISO Pennsylvania.
CANADA. Yukon Territory British Columbia SASKATCHEWAN.
Canada. Canada is bordered by the Atlantic Ocean to the east and the Pacific Ocean and Alaska to the west. It is bordered by the Arctic Ocean to the north.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Argentine Power Market Fuel Oil Use & Opportunities for the Future Central Puerto S.A. Fuel Oil / Energy Buyer’s Conference Miami, September 2000.
Regions of North America: Canada
November 3, 2014 Adaptation or Modification? Canada Notes Test Review.
Karla Murillo Villanueva Cesar Castillo Lara November 8th 2010
CANADA from A to Z!.
MIT tour of the California ISO Control Center March 31, 2015
United States and Canada
Energy Fact Sleuths.
New England Electricity Restructuring Roundtable September 18, 2009
Our Country’s Neighbor
CANADA.
Solar Energy Commercialization
Presentation transcript:

BC Electric Market Overview Central Asia Delegation 30 January 2013 Doug Robinson Canadian Entity Secretary BC Hydro - Generation

Doug Robinson, Canadian Entity Secretary

Canada Facts Population: ~ 34.3 million 10 Provinces, 3 Territories. Confederation: 1 July 1867 Government: Parliamentary Democracy, Constitutional Monarchy Languages: English, French [Primarily Quebec] Area: ~10 million km 2 [2nd largest after Russia; 6 time zones; borders 3 oceans] Capital: Ottawa, Ontario [coldest capital in world] Border with US is longest undefended border. Gross Domestic Product ~ $1.4 Trillion Electrical Capacity ~ 131,000 MW

British Columbia (B.C.) Facts Population: ~ 4.4 million [3 rd ] British Colony: 19 November 1858 Entered Confederation: 20 July 1871 Area: ~0.95 million km 2 [4 x Great Britain] Vancouver Island ~ size of Belgium. B.C. was named after the Columbia River… after the initial proposal, “New Caledonia” was rejected. Capital: Victoria, on Vancouver Island. Vancouver: Named after Captain George Vancouver; Named “World’s most liveable city” Electrical Capacity ~ 12,000 MW

BC Hydro Facts A Provincially-owned Crown Corporation. Serves ~95% of BC’s population [FortisBC serves rest] ~ 1.8 million customers. ~ 5800 employees Domestic Revenues ~ $4 billion /year Generation varies from 42,000 GWh – 52,000 GWh/year Installed Capacity ~ 12,000 MW Rates are ~ 4 th lowest in North America [lower include: Quebec Hydro; Manitoba Hydro; Seattle City Light] Rates: Residential 77 $/MWh; Commercial 69 $/MWh; Large Industrial 45 $/MWh 57,700 km of Distribution lines 18,800 km of Transmission lines

Note that the river basins generally run North / South… more connections with the U.S. than with Alberta. Border with Alberta runs along the Columbia River watershed boundary.

First Nations Territories

51 % BC Generation 34 % 15 % 70% BC Load

BC Hydro’s Domestic Load Domestic load is highest during: -> winter months - due to colder temperatures and shorter days (heating, lighting, and appliance loads) -> weekdays - due to higher industrial and commercial loads -> daytime and evening hours - due to higher industrial and commercial loads as well as residential loads (especially in late afternoon and evening hours) BC Hydro’s peak load typically occurs on a very cold weekday in December or January between the hours of 5 and 6 pm (heating, lighting, electric stoves, etc.) Remember -- At all times, supply (generation + imports) must equal demand (domestic load + exports)

BC Hydro Domestic Load - annual pattern - load and temperature inversely correlated

BC Hydro Domestic Load, Generation, & Market Activity - typical daily pattern

B.C.Hydro & Powerex - description of markets U.S. Pacific Northwest (~ 50% hydropower) –generation patterns dominated by Columbia R runoff patterns and operational restrictions (numerous fisheries issues) … 11 powerplants on U.S. mainstem Columbia river plus many others on tributaries –domestic load patterns very similar to BCH –gas-fired generation sets the market price 75% of time California and other U.S. Southwest –good summer market due to air-conditioning load –in winter, California sells energy to BCH and Northwest Alberta –base load is coal-fired generation –gas-fired generation usually sets market price –winter temperatures more extreme than in BC

Western North America - Transmission connections

B.C.Hydro’s Interconnections - Electrical Coordination Western Electrical Coordination Council (WECC) and Northwest Power Pool (NWPP) formed to provide more stable electrical networks in western North America protects the reliability of the electrical grid while allowing economic trade in electricity all WECC members are required to carry “operating reserve”, i.e. unloaded and reserved generating capacity that is available to help neighbouring utilities during a disturbance WECC operating reserve requirement for hydroelectric projects: 2.5 % of generation spinning % of generation available within 10 minutes

North American Electrical Grid

Electricity is Unique Bulk electricity is the only commodity that can not be directly stored (economically). Electricity production must exactly = aggregate load every instant, all the time!  [No other commodity has this rigid requirement!] Electricity users expect supply on immediate demand, at constant voltage and frequency. Failure to match load leads to system-wide frequency, voltage and stability problems. Critical need to exactly match load results in very high price volatility [the highest]!

BC’s Electric System is Unique B.C. 90% Hydro (many with significant storage) 10% Thermal (Natural Gas) Low cost and flexible! North America 56% Coal 22% Nuclear 10% Hydro (many with limited storage) 9% Natural Gas 3% Oil

Hydro vs Thermal Generation Hydro Project High initial cost Low operating cost Energy limited and variable![~10,000 GWh variation!] Fast starting / stopping / ramping No emissions Hydro is Flexible! Thermal Project Lower initial cost High operating cost Generally not energy limited Slow starting / stopping / ramping Emissions vary with fuel and process Hot machinery is not!

Hourly Prices are Volatile Hourly Power Pools are operating in Alberta and California (now closed):  Generators submit hourly ‘sell’ bids into Pool.  Bids for each hour are stacked from lowest to highest price.  Hourly clearing price is determined where supply = demand.  Clearing price is paid to all successful bidders! Hourly prices established are highly visible and objective, but are very volatile!

Presentation on System Optimization Depressed prices in freshet Actual volatility Forecast uncertainty

Historical $ Volatility: Electricity is Highest Standard Deviation MinMaxRange Electricity (PJM)32%-261%278%539% Henry Hub Natural Gas4.3%31%21%52% Heating Oil3.6%-47%23%70% Coffee2.9%-13%21%34% WTI Crude Oil2.6%-17%10%27% Copper1.3%-5%7%12% Source: