EXAMPLE – Quality Control Plan For Consultants

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

Substitute Online Staff Training Advanced. Substitute Online – Advanced Top Navigation Options.
Developed By: Performance Based Studies Research Group Performance Information Procurement System.
Five Steps in 5 Minutes Close deals faster, more easily, more often! 1.Start a Quote: Input deal amounts and review the available lease options 2.Create.
RFP vs. IFB A BASIC APPROACH TO THE BID PROCESS – WHEN RFPs or IFBs ARE USED 2010 AASBO Spring Pre-Conference Workshop Rosa Saenz, PGPC, Inc. Bill Munch,
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
November 19, 2013 Preparing a Successful RFP to get Desired Results.
Discover ACP It's Easier than Ever to Hire Temp Labor.
Weekly Risk Report & Performance Metrics
Top-Down Network Design Chapter Fourteen Documenting Your Network Design Copyright 2010 Cisco Press & Priscilla Oppenheimer.
Chapter 3 Project Initiation
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
Procurement Card Training Strategic Account Management (SAM)
Chapter 3: The Project Management Process Groups
The Camp Audit “Keep your friends close and your auditor closer”
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Development and Quality Plans
Development plan and quality plan for your Project
Sole Source Training.
Openings, Closings, and Mergers Tutorial I 2013 Schools and Libraries Fall Applicant Trainings 1 Openings, Closings, and Mergers Tutorial Fall 2013 Applicant.
The BIM Project Execution Planning Procedure
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Insert the Username and Password given to you from the administrator.
Performance Based Studies Research Group Pre Award Phase.
Federal Acquisition Service U.S. General Services Administration Ralph Lentz GSA, FAS, Management Services Center April 16, 2009 Contract Administration.
SLA of an Outsource Process - 1 Service Level Agreements (SLAs) of an Outsource Process Michael Day MBA 731 October 29, 2007.
Runaway. Placements.. The following graphics are designed to help you to navigate through this Computer Based Training. The navigational guides require.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Chapter 14 Information System Development
Team Members David Haas Yun Tang Robert Njoroge Tom Kerwin Clients Facilities Management Don Anderson Rick Klein.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Tips on Routing and Contracts: An Intro for the Campus Research Coordinator Michelle Artmeier Director of Award Services Ron.
Presented by: Masoud Shams Ahmadi February 2007 Enterprise Resource Planning (ERP) Selection Presented by: Masoud Shams Ahmadi
Click here to advance to the next slide.. Chapter 5 Entrepreneurship Section 5.2 The Business Plan.
OneView Service Center Help
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
IT 499 Bachelor Capstone Week 4. Adgenda Administrative Review UNIT Four UNIT Five Project UNIT Six Preview Project Status Summary.
 Establish a fair and honest fee for the work  Make sure that the Agency has developed a clear and concise program for the work  The DPW PM is the arbitrator.
Stream Agent Training February page 2 Stream > Getting Started (Agency Administrators) Company Profile: Verify all the information is correct. Information.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Vendor Bid System (VBS) Seminar. Agenda Vendor Bid System Overview Step-by-Step Advertisement Posting Editing Active Advertisements Recommended Practices.
Technical Proposals Written in order to expedite job-related processes: Significant operational improvements New business Additional jobs Safer working.
Risk Management Tips for completing risk registers
Contract Invoice Guide
PMC xx/xxxx Project Title & Project Code Presenter:
Performance Based Studies Research Group Pre Award Phase.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
10 W EEK P ROJECT S COPE OF S ERVICES March 13th, 2014.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
2016 Filing a Form 470 For C1 Using ITS as the Secondary Billed Entity Step-by-Step for Creating and Submitting your 470 Application in the EPC Portal.
The Contract Management Process Post Award Activities.
Construction Management At Risk Process
PIPS!!! Performance Information Procurement System.
PERSONAL SERVICE CONTRACTS MEMORANDUMS OF AGREEMENT PROCESS Amy Monroe, Procurement Teri Mason, Budgets Thelma Hawkins, Grants Management Karen Wirth,
ITEC 275 Computer Networks – Switching, Routing, and WANs
Procurement Management
Systems Analysis and Design in a Changing World, 4th Edition
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Business System Development
CPMGT 300 STUDY Lessons in Excellence--cpmgt300study.com.
Project Charter <Project Name>
Project Management Process Groups
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
The Service Portal What is the Self-Service Web Portal?
Contract Award to TMG Utility Advisory Services, Inc
SPOT CHECKS 2016.
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

EXAMPLE – Quality Control Plan For Consultants To view the Pre-Award Phase presentation*, please go to:   1.  www.pbsrg.com 2.  Click on "PIPS" 3.  Click on "UMN" 4.  Scroll down and click on the "Pre-Award Phase Educational Video“ Username is: umncont Password is: 5768 *This video was originally made for construction but the same principles are applied to consultants. If you have any questions, please contact Your CPPM Project Manager or Project Coordinator – or – PIPS Associate pips@umn.edu

Name of Project Project # Quality Control Plan Name of Project Project # Company Name Date of Pre-Award Meeting Procurement Method: □ sole sourcing □competitive RFP process

Summary of the Project Scope of the project Location of the project Here are a list of items that could be included on this slide: Scope of the project Location of the project Completed project will include. . .

Project Contact List List contact information for consultants, subconsultants, and any U of M personnel that is associated with this project.

Project Financial Summary A summary of changes agreed upon during the pre-award phase and its associated cost for the project: Original Design Fee Value Added Options Any Additional Client Cost Project Total Design Cost Change Order Mark-up% * All risk items are carried into the basic services and should include no additional cost.

Valued Added Options List original value added options with price and impact to schedule. State whether the option was accepted or declined.

Customer Requested – Valued Added Options (if applicable) List original value added options with price and impact to schedule. State whether the option was accepted or declined.

Detailed Work Plan A detailed breakdown of all design activities (including site investigation, programming, organizational concepts, schematic design phase, design development phase, construction documents, bidding, and contract administration). All significant activities that require actions by the design team. All significant activities that require actions by the client.

Project Schedule Summary Proceed Order DATE Pre Design Completion DATE Schematic Design Completion DATE Design Doc. Completion DATE Construction Doc. Completion DATE Original Project Duration XX Days Additional Time for Accepted XX Days Value Added Items Adjusted Project Duration XX Days

Risk Assessment Plan SPECIAL NOTE A complete list of all risks identified in the risk assessment plan and interview (if applicable) along with solutions to the risks. This includes the list of all risks identified by the other vendors with solutions to each risk. It is acceptable to add more detail to your previous solution provided in your RAVA plan. SPECIAL NOTE Do not correct grammar, spelling, or delete any risks from the original list. Please keep the original number associated to the risk when addressing it in the presentation. If there are duplications, you may address a group of risks or in your solution refer back to a previous solution. See example of the following slide.

EXAMPLE - Risk Assessment Plan Risk 1: Working in and around occupied locker room, film rooms and training facilities causing disruption to staff and students. Solution: We will install temporary barriers to separate construction areas from occupied areas. Risk 2: Note 3 on sheet B-01 of 4 states that the owner will provide the benches. Solution: This is not a risk because benches have been delivered and is at the site. Risk 3: Renovation of the lokcer room will disrupts walking pattern. Solution: This has been addressed in the solution for Risk #1. -or group similar risks in categories- Disruption to Space Solution to all of the above: We will install temporary barriers to separate construction areas from occupied areas. Misc. Risks Solution: This is not a risk.

Uncontrolled Risks List (Outside of consultant’s control – use if applicable) A complete list of factors which are outside the control of the vendor (ie. hidden conditions). This should include the following: Identify what the action or risk is Identify what the vendor has done, or will do, to minimize the risk Identify what the result may be if the risk still occurs Identify what actions the client should take to minimize the risk if applicable

Example - Uncontrolled Risks List Example Format Risk #1: Description of risk vendor does not control (or why it is a risk) Solution: Provide your solution. Make sure it is identified at what point you have done everything reasonably possible. Identify the impact if the risk still exists after you have done everything reasonably possible. Step 1: Step 2: Step 3: Expected Impact if Risk Occurs: For example, “If we have done the above X steps and the risk still exists, there will be an impact to the …budget…schedule…of $XX.XX…XX days.”

Action Item Checklist A list of action items (required by client, consultant, subconsultant, etc) listed on separate slides. This must include what the action is, a due date, a person that is responsible for making the decision, a proposed decision or best option, and what the result may be if the action doesn’t occur. For Client For Consultant - Quality Assurance For Subconsultant

Example - Client Action Item List List of all actions/tasks that the vendor requires from the client Each action item must have: Activity Person accountable Due date Impact if not completed