Phoenix Convention Center Phoenix, Arizona Net Zero for the Army Reserve Sustainability Track Getting to Net Zero: Energy, Water and Waste Amy Solana Pacific.

Slides:



Advertisements
Similar presentations
The Committee and Research – Where are we and where might we be going?
Advertisements

Make Commitment Milestone 1 Inventory Emissions Milestone 2 Set Target/Goal Milestone 3 Establish Local Action Plan Milestone 5 Monitor/Evaluate Progress.
What is Microgrid Institute? Microgrid Institute is a collaborative organization that focuses on key factors affecting microgrids and distributed energy.
S T A T E O F C A L I F O R N I A The Department of General Services Grid Neutral Schools Division of the State Architect, Department of General Services,
Program Name or Ancillary Texteere.energy.gov June 16, 2011 Soudeh Motamedi IBM Contractor, DOE Sustainability Performance Office Year-End Sustainability.
Slide 1 Fort Detrick Sustainability Planning Workshop #1 – Out Brief 1 Jul 08.
Fort Bliss Energy, Water, and Solid Waste Sustainability Initiatives Draft Environmental Impact Statement (EIS) Public Meetings June & 13, 2013.
Paul A. Weghorst Executive Director of Water Policy
Renewable Energy Generation Geothermal Energy Systems Photovoltaic Systems Biomass Systems Landfill Gas Microturbines Wind Turbines Solar Water Heaters.
Green School Initiative Institute for Sustainable Energy At Eastern Connecticut State University “ It’s not easy being GREEN ! ” Kermit T. Frog.
SUSTAINABLE SEWAGE Melissa K. Scanlan Associate Dean & Associate Professor Vermont Law School.
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
TRP Chapter Chapter 4.2 Waste minimisation.
Fourth Meeting June 26, 2012 "The Cleaner Greener Lincoln initiative will make the City of Lincoln an active leader in the area of sustainability, building.
Third Meeting May 22, 2012 "The Cleaner Greener Lincoln initiative will make the City of Lincoln an active leader in the area of sustainability, building.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities LEED-ESH-Facility Utilization May 8, 2007.
You can achieve 100% Energy Saving WHEN YOU TURN OFF THE LIGHTS.
1 Ohio School Facilities Commission Green Schools Initiative Presentation #2.
Sixth Northwest Conservation & Electric Power Plan Discussion of Proposed Generating Resource Action Items Jeff King Northwest Power and Conservation Council.
UNCLASSIFIED “It’s All About the Soldier” Net Zero – Energy Initiative Prepared by: Todd A. Dirmeyer Energy Manager 7 August 2012 Thanks to: DASA- I,E&E.
Phoenix Convention Center Phoenix, Arizona HVAC Re-tuning at GSA and Army Reserve Facilities: A Low-Cost Path to Energy Efficiency and Cost Savings Integrated.
2 nd Public Meeting - Options March 30, Agenda  Overview of Water Issues  What is a WIRP?  Purpose of WIRP  Evaluation Process  WIRP Objectives.
Phoenix Convention Center Phoenix, Arizona Getting Results From Your Energy Projects Session 3Greening the Federal Government Jim Bochat Commissioning.
Phoenix Convention Center Phoenix, Arizona Army Reserve Metering Program Integrated EnergyMetering Strategies Marcus De La Rosa Pacific Northwest National.
1 every student. every classroom. every day. Building a Sustainable School District Jody London, President, Board of Education October 28, 2011 Council.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
Phoenix Convention Center Phoenix, Arizona Using Private Financing to Maximize Energy and Cost Savings Track 5: Project Financing Session 7: Economics.
Sustainability and Public-Private Initiatives Sean Patton Director, Energy Solutions LOCKHEED MARTIN CORPORATION JUNE 8, 2012 Sustainability for the Future.
Femp.energy.gov 1 US DOE Perspective on Deep Energy Retrofits Cyrus Nasseri US Department of Energy Annex 61 Technical Day April 13, 2015.
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Phoenix Convention Center Phoenix, Arizona Introduction to Life-Cycle Cost Analysis Agency Energy ManagerLife-Cycle Cost Methodology Mike Mills, CPA, BEP.
Phoenix Convention Center Phoenix, Arizona Evolution of Energy Services Integrated Energy TrackIntegration of the Energy Industry Nicole Bulgarino Ameresco.
Best Practices in Overall Sustainable Design Cal State University, Long Beach - Liberal Arts 2, 3 and 4 Renovation Presented By:Mark Zakhour,, CASp, LEED.
Phoenix Convention Center Phoenix, Arizona Overview of the ESTCP Energy & Water Program Technology Track Overview of Federal Technology Demonstration Programs.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Integrated Energy TrackIntegration of the Energy Industry.
Phoenix Convention Center Phoenix, Arizona FEMP Training Supports FBPTA and FMI.gov Institutional Change Federal Buildings Personnel Training Act: Resources.
Phoenix Convention Center Phoenix, Arizona Federal Water Efficiency Sustainability TrackWater Efficient Operations Kate McMordie Stoughton Pacific Northwest.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
Phoenix Convention Center Phoenix, Arizona GSA’s Actions under the PPCC GSA’s Pipeline Session 1, Track 5Meeting the PPCC Sharon Conger Public Building.
Phoenix Convention Center Phoenix, Arizona Metering Guidance & Best Practice Integrated EnergyMetering Strategies Saralyn Bunch Federal Energy Management.
Phoenix Convention Center Phoenix, Arizona Business as Usual: Cost-Saving Activities that Green the Federal Government Solution ShowcaseGreening the Federal.
Phoenix Convention Center Phoenix, Arizona Army’s Net Zero Initiative Sustainability Getting to Net Zero: Energy, Water and Waste Alicen Kandt National.
Advancing Renewable Energy and Energy Efficiency in the Commonwealth An Innovative Partnership: The Massachusetts Department of Environmental Protection.
Phoenix Convention Center Phoenix, Arizona Life-Cycle Cost Analysis for large projects Agency Energy ManagerLife-Cycle Cost Methodology Jeanette Fiess,
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
Sustainable Port of San Diego Michelle White Green Port Program Manager.
Slide 1 Fort Detrick Sustainability Planning Workshop #1 – Out Brief 1 Jul 08.
ALACHUA COUNTY COMMISSION QUARTERLY RETREAT ENERGY RECOMMENDATIONS FOR IMMEDIATE INVESTIGATION AND IMPLEMENTATION BY THE ALACHUA COUNTY BOARD OF COUNTY.
Phoenix Convention Center Phoenix, Arizona. Energy Exchange : Federal Sustainability for the Next Decade Energy Efficiency, then Renewable Energy (EERE)
Sustainability Elements of the ARRA, and Getting the Most out of Stimulus Funding Jeannie Renne-Malone, LEED AP National Director – Climate Change & GHG.
Experience you can trust. Californial Industrial Energy Efficiency Potential CALMAC/MAESTRO Meeting San Francisco, CA July 27, 2006 Fred Coito
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
Phoenix Convention Center Phoenix, Arizona Integrated Assessment for Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS)
11 Regional Renewable Energy Study Review of Findings and Forecasts Presented to: Climate, Energy and Environment and Policy Committee Metropolitan Washington.
H2O WORLD SOLUTIONS Technology for the future - making Water Renewable.
Water Audits and Best Management Practice Life Cycle Cost Analyses for Army Medical and Health Care Facilities Presented By: Lisa Raysby Hardcastle, P.E.
Biodiesel Production from Grease Waste February 3, 2011 IBR & Infrastructure Platform Tony Pack Eastern Municipal Water District.
Presentation Overview EECAP summary Plan development process GHG inventory results Policy recommendations EAP implementation.
Smart Islands What it means for business 1. 2 Smart Islands Context Highest home electricity consumption in the UK; over 6,000 kWh per year Has 21% fuel.
Do you know? By 2015, an estimated 40-48% of new non-residential construction by value will be green, equating to a $ billion.
US Army Corps of Engineers BUILDING STRONG ® Capital Investment Strategy (CIS) to Achieve Total Netzero Energy, Waste, and Water Porscha Porter USACE Engineering.
CalCAP Implementation at UC Berkeley Lisa McNeilly, UC Berkeley UC/CSU/CCC Sustainability Conference July 2008 August 2, 2008.
APTA Sustainability Workshop 2016
Fort Stanwix National Monument Energy Audit Contract
Process Economics Factors that affect profitability
Presentation transcript:

Phoenix Convention Center Phoenix, Arizona Net Zero for the Army Reserve Sustainability Track Getting to Net Zero: Energy, Water and Waste Amy Solana Pacific Northwest National Laboratory August 12, 2015 PNNL-SA

Energy Exchange : Federal Sustainability for the Next Decade Agenda Program Overview Execution Methods Common Recommendations Example Analysis Conclusions 2

Energy Exchange : Federal Sustainability for the Next Decade Net Zero Goals for Army Reserve In 2013, the Army Reserve set a goal to expand the Army’s Net Zero Program to include Reserve Centers Reserve Centers present unique challenges for net zero because they are small and geographically dispersed Goals for Army Reserve pilot net zero program: – Include at least 1 facility type in each of the 4 CONUS regions: Small/medium Reserve Center Large Reserve Center Equipment Concentration Site (ECS) Area Maintenance Shop (AMSA) – Include all 4 properties in the Pacific region – Each site will pursue net zero energy, water, and waste 3

Energy Exchange : Federal Sustainability for the Next Decade Army Reserve Net Zero Objectives Net Zero Energy: Reduce overall energy consumption, and produce as much renewable energy on site as the site uses, over the course of a year. Be able to operate independently of the grid if the local grid is vulnerable to failures. Net Zero Water: Limit the consumption of fresh water, maximize the use of alternative water, and return water back to the regional watershed to help sustain regional water resources. Net Zero Waste: Reduce, reuse, and recover solid waste streams, converting them to valuable resources, with zero landfill over the course of a year. – Biosolids are included, hazardous waste is not. – Waste can be “recovered” in a waste-to-energy facility, but byproducts (including ash) must be recycled. 4

Energy Exchange : Federal Sustainability for the Next Decade Process 1.Choose sites (nominate and rank) 2.Conduct Net Zero-focused Comprehensive Energy and Water Evaluation for sites rated as high and medium priority 3.Analyze net zero pathways 4.Develop recommendations and net zero roadmap 5

Energy Exchange : Federal Sustainability for the Next Decade Nominated Net Zero Pilot Sites 6

Energy Exchange : Federal Sustainability for the Next Decade Net Zero Evaluation Scope Existing and planned buildings Current operations and education opportunities Engineering & economic analyses – Energy efficiency, conservation, and controls – Renewable energy – Microgrid for energy security – Water efficiency and conservation – Alternative water supply and wastewater treatment – Waste reduction, diversion, and waste-to-energy 7

Energy Exchange : Federal Sustainability for the Next Decade Analysis Process 8

Energy Exchange : Federal Sustainability for the Next Decade Three Net Zero Implementation Scenarios 1.Cost-effective – SIR > 1.0 on individual measure basis – Waste only: includes projects that are easy to implement (cost savings and cost-effectiveness are often uncertain) 2.Required to meet net zero – Meets future estimated loads and net zero definitions 3.Recommended – Cost-effective – Practical – Similar projects already being implemented on site – Meets security needs 9

Energy Exchange : Federal Sustainability for the Next Decade Net Zero Recommendations 10

Energy Exchange : Federal Sustainability for the Next Decade 11 Example Site Net Zero Site Boundary

Energy Exchange : Federal Sustainability for the Next Decade Example Baseline Description Island location In need of envelope upgrades to withstand local climate 2 Reserve Center bldgs + 2 Post Exchange (PX) bldgs, with plans for 2 additional Reserve bldgs and 1 additional PX bldg 15,606 ft 2 total, to be approximately doubled Years built: 1987 and 2002 Energy – Consumption: estimated 114 MWh/yr, including increase from planned buildings and decrease from improved envelopes – Cost: $0.42/kWh, estimated $48k/yr Water – Consumption: 144 kgal/yr for both USARC and PX (average); no increase anticipated because population remains the same – Cost: $8.52/kgal, $1.2k/yr (average) Waste – Generation: unknown; shared dumpsters for USARC and PX – Cost: $5k/yr 12

Energy Exchange : Federal Sustainability for the Next Decade Net Zero Energy: Achievable – 25% energy use reduction from future assumed load – Solar PV and solar water heating – Grid-tied microgrid Net Zero Waste: Partially Achievable – ~60% waste diversion – Community WTE facility (if not built, net zero waste is not achievable) Net Zero Water: Achievable, Not Recommended – 44% water use reduction – Rainwater capture for potable water (not recommended) – Onsite wastewater treatment (not recommended) Funding options: appropriated (utilities modernization, O&M) 13 Example Net Zero Results Summary NZ Category Capital Cost ($) Utility Cost Savings ($/yr) O&M Cost Savings ($/yr) Future Annual Utility Cost ($/yr) Utility Cost Savings (%)SIR Energy$378k$48k-$780$48k100%1.9 Water$7k$0.5k$40$1k44%1.9 Waste$1.4k $820$5k30%15.6 TOTAL$386k$50k$80$54k92%2.0 Summary of Recommended Measures

Energy Exchange : Federal Sustainability for the Next Decade Example Net Zero Energy Results Objective: Reduce energy use by 25% from FY14 levels and supply the remainder, including future energy load, with onsite renewable energy. 14

Energy Exchange : Federal Sustainability for the Next Decade Example Net Zero Water Results Objective: Reduce plumbing potable water consumption, provide remainder from rainwater, and treat wastewater on site. Net zero water is not recommended because rainwater harvesting is very expensive for the location and onsite wastewater treatment is risky due to site flooding. 15

Energy Exchange : Federal Sustainability for the Next Decade Example Net Zero Waste Results Objective: Eliminate solid waste disposed at a landfill by reducing and diverting as much as possible, and treat the remainder at a WTE facility that does not generate landfilled byproducts. Net zero waste is not possible because a WTE facility on the island is unlikely at this time, and if it is built it will likely generate landfilled byproducts. 16

Energy Exchange : Federal Sustainability for the Next Decade Challenges Achieving Net Zero at Reserve Centers External factors affected economics – Utility requirements for battery backups to renewable energy systems – Inadequate level of service requires fixes that don’t generate monetary savings (e.g., electricity, HVAC) Waste generation information is not available for small sites – waste utilities charge by dumpster not by ton – Analysis based on assumptions – Accurate results require detailed waste evaluation Irregular and transient occupancy, few weekday staff, and high weekend occupancy make engagement difficult and require unique considerations – Equipment operation, sizing, and cost-effectiveness 17

Energy Exchange : Federal Sustainability for the Next Decade Lessons Learned from the Army Reserve Net Zero Pilot Program Net zero is often not life-cycle cost-effective – Recommendations that provide near-net zero solutions are useful – Favorable conditions for NZ include: High utility costs (and no natural gas) Security or reliable service concerns Regional/local supply issues Small AR site sizes restrict technology options (e.g., WTE), but also present opportunities (e.g., rainwater harvesting) Behavioral changes and top-down policy changes needed to meet net zero objectives and maintain savings achieved Need fully implemented BAS to effectively monitor and continuously retune net zero Reserve Centers Need facility coordinator to have net zero actions included in official duties Need champion at region HQ to implement projects 18