Page 1 ASAR Validation Review - ESRIN – 11-12 December 2002 ASAR Validation Review Introduction B. Rosich ESA-ESRIN ASAR C.P. Objectives Challenges in.

Slides:



Advertisements
Similar presentations
Formulation, planning, budget information provided by Department of Planning & Evaluation Analysis and Preparation of Funding Resolution Approval of the.
Advertisements

Page 1 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Ocean geophysical results from ASAR  Geophysical overview  ocean spectra : the isidore case.
Analyze the information brought by the polarization diversity (HH-VV-HV for ASAR, full-polarimetric for airborne radar) for wind and wave studies Validate.
Page 1ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 ASAR Processing Facility Status  Processor releases  Internal calibration updates  Processing.
8th EnviSat Calibration and Validation Progress Meeting ESRIN, 05/12/01 1 RA-2/MWR Level 2 algorithms verification and products validation group status.
Space experiment on the International Space Station with P-band SAR Space experiment on the International Space Station with P-band SAR B.Kutuza, A.Kalinkevitch,
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Folie 1 Performance Investigation on the High-Resolution Wide-Swath SAR System Operating in Stripmap Quad-Pol and Ultra-Wide ScanSAR Mode DLR - Institut.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
The LAS Development in Ghana Chatham House Illegal Logging Update and Stakeholder Consultation, July, 2007 By Chris Beeko.
Page 1ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 ASAR On-board Instrument  Instrument Stability and Status  Instrument Adjustments  Tracking.
Page 1 ENVISAT Validation Workshop - ESRIN – 9-13 December 2002 ENVISAT Validation Workshop, Frascati, 9-13 December 2002 Hannes Raggam Institute of Digital.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
SHELF READY PACKAGING ECR Operating Board Update 27 th June 2006.
Page 1© Crown copyright 2004 The Challenges for an operational wind profiler. Remote and unattended Tim Oakley TECO-05 Bucharest, 4 th -7 th May 2005.
Efficient design of a C-band aperture-coupled stacked microstrip array using Nexxim and Designer Alberto Di Maria German Aerospace Centre (DLR) – Microwaves.
ALOS-2 Mission Status and Basic Observation Scenario (BOS)
ENVISAT Validation Workshop - Frascati - 9–13 December 2002 Opening Session:  Welcome [G. Kohlhammer]  Workshop Objectives and Organisation [H. Laur]
Sentinel-3 Validation Team (S3VT) Meeting ESA/ESRIN, Frascati, Italy, th November 2013 General Presentation Template for S3VT meeting Project name.
DOCUMENT OVERVIEW Title: Fully Polarimetric Airborne SAR and ERS SAR Observations of Snow: Implications For Selection of ENVISAT ASAR Modes Journal: International.
Session 10: Space Data Support to GFOI R&D DLR Contributing Data Stream Report SDCG-7 Sydney, Australia March 4 th – 6 th 2015 Helmut Staudenrausch, DLR.
1 Long Term Monitoring JPSS Algorithm Team Presented by Date.
Calibration and Validation Studies for Aquarius Salinity Retrieval PI: Shannon Brown Co-Is: Shailen Desai and Anthony Scodary Jet Propulsion Laboratory,
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
1 IICWG, October 2007 RCM Capabilities for Ice & Sea-Ice Applications IICWG … G. Séguin, R. Girard, Y.Crevier.
Page 1 ENVISAT Validation Workshop - ESRIN – 9-13-Dec-2002 ENVISAT Spacecraft and Flight Operations Segment Status Andreas Rudolph Mission Operations Department.
Comparison of L and P band radar time series for the monitoring of Sahelian area P.-L. Frison, G. Mercier, E. Mougin, P. Hiernaux.
INSTRUMENT STATUS AND PERFORMANCE Guido Levrini. Page 2 ENVISAT Validation Workshop - ESRIN - 9–13 December 2002 ASAR F Instrument operability issues.
Page 1 ASAR Validation Review - ESRIN – December 2002 IM and WS Mode Level 1 Product quality update F Introduction F IM Mode Optimisation F Updated.
Page 1 ENVISAT Validation Workshop - ESRIN – 9-13 December 2002 ASAR Validation Review AP and GM Level 0 Product Quality Birgit Schättler Remote Sensing.
Page 1ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Antenna Elevation Pattern Estimation from Rain Forest Data M. Zink ENVISAT Programme ESA-ESTEC.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
Page 1 ASAR Validation Review - ESRIN – December 2002 Advanced Technology Centre ASAR APP & APM Image Quality Peter Meadows & Trish Wright  Properties.
N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N NPP DATA ACCESS Mitch Goldberg JPSS Program Scientist June 21, 2012.
WP120 External Calibration of Spaceborne Microwave Remote Sensing System Sensors Objective:Evaluation of external calibration needs for a variety of microwave.
Baseline The baseline at July Previously there was a lack of consistency for: Pathways into specialist clinics; Policies, procedures and guidelines.
Commercial Space-based Synthetic Aperture Radar (SAR) Application to Maritime Domain Awareness John Stastny SPAWAR Systems Center Pacific Phone:
Camp Sentinel II Radar System [4] -Installed outside US Army Camp in Vietnam in Antenna Dimensions: 3.5 m diameter x 1 m tall antenna. -2 kW.
Page 1ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Systematic Product Analysis Christopher Buck ENVISAT Programme ESA/ESTEC.
Deployment timelines LHCb CMS ATLAS 2007 Dec Nov Oct Sep Aug Jul Jun
Jan 2016 Solar Lunar Data.
ASPOC Presentation for the CAA Operations Review-1 Klaus Torkar and Harald Jeszenszky IWF/OAW Graz ESTEC, May 2006.
Alternating Polarization ´Single´ Look Complex Product Status
Objectives Using a time series of data from radar sensors to detect and measure forest changes Combining different types of data, including: Multi polarisations.
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
Project timeline # 3 Step # 3 is about x, y and z # 2
Professional & Scientific Council Update

Yearly Maintenance Process (for existing messages)

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun


Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
(Beam) Commissioning Plan
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2
Pilot of revised survey
Presentation transcript:

Page 1 ASAR Validation Review - ESRIN – December 2002 ASAR Validation Review Introduction B. Rosich ESA-ESRIN ASAR C.P. Objectives Challenges in ASAR Cal/Val Strategy History of the C.P. main activities Organisation of the Review

Page 2 ASAR Validation Review - ESRIN – December 2002 Commissioning Phase Objectives Ensure operational stability and instrument performance in ALL modes Verification of in-flight antenna performance Verification of the internal calibration/instrument gain monitoring External Characterisation of the ASAR Antenna Verify the quality requirements for ALL products and tune the processor / instrument settings if necessary Perform the absolute product calibration: Antenna Pattern determination for all 32 beams and Absolute gain calibration for all beams and modes Demonstrate in-flight ASAR multi-mode interferometry and AP capabilities Validate the new wave mode products Establish the activities to be performed during routine phase

Page 3 ASAR Validation Review - ESRIN – December 2002 Challenges in ASAR Instrument Calibration Stability of active phased array 32 transmit/receive beams 5 different operation modes (IM,AP, WS, GM, WV) for science data plus 2 calibration modes (EC, MS) 7 beams (IS1-IS7) for single swath modes: Image, Wave and Alternating Polarization Mode 5 sub-swaths (SS1, IS3-IS6) ScanSAR: Wide Swath and Global Monitoring Mode Complex internal calibration system

Page 4 ASAR Validation Review - ESRIN – December 2002 IMAPWSGMWV ASA_IM__0PASA_AP__0PASA_WS__0PASA_GM__0PASA_WV__0P L0 ASA_IMP_1PASA_APP_1P PRI ASA_IMM_1PASA_APM_1PASA_WSM_1P MR ASA_IM__BPASA_AP__BPASA_WS__BPASA_GM__BP BR ASA_IMG_1PASA_AGP_1P GEC ASA_GM1_1P LR ASA_WVW_2P L2 ASA_IMS_1PASA_APS_1PASA_WVI/S_1P SLC Challenges in ASAR Product Calibration

Page 5 ASAR Validation Review - ESRIN – December 2002 IMAPWSGMWV ASA_IM__0PASA_AP__0PASA_WS__0PASA_GM__0PASA_WV__0P L0 ASA_IMS_1PASA_APS_1P ASA_WVI/S_1P SLC ASA_IMP_1PASA_APP_1P PRI ASA_IMM_1PASA_APM_1PASA_WSM_1P MR ASA_IM__BPASA_AP__BPASA_WS__BPASA_GM__BP BR ASA_IMG_1PASA_AGP_1P GEC ASA_GM1_1P LR ASA_WVW_2P L2 Specan Range Doppler Processing Algorithms

Page 6 ASAR Validation Review - ESRIN – December 2002 Strategy Establish continuous monitoring of the antenna using special calibration modes. Adjustment of Instrument settings / gains Perform basic processor verification and product calibration. Use of calibration sites at different world locations. Peform systematic monitoring of key instrument and product quality parameters Refine/Optimize the Processor and Product quality First priority on IM, WV and WS in VV polarization. Continuation with HH polarization, AP and GM modes. Set-up an efficient team to cover all the aspects of the ASAR cal/val Brazil Radarsat Tr. Las Vegas ASAR Tr. Kiruna GS Bern/Zurich Vietnam Neustrelitz GS Garmisch Rain Forest

Page 7 ASAR Validation Review - ESRIN – December 2002 IMAPWSGMWV ASA_IM__0PASA_AP__0PASA_WS__0PASA_GM__0PASA_WV__0P L0 ASA_IMS_1PASA_APS_1P ASA_WVI/S_1P SLC ASA_IMP_1PASA_APP_1P PRI ASA_IMM_1PASA_APM_1PASA_WSM_1P MR ASA_IM__BPASA_AP__BPASA_WS__BPASA_GM__BP BR ASA_IMG_1PASA_AGP_1P GEC ASA_GM1_1P LR ASA_WVW_2P L2 ECR EVR Product Calibration schedule

Page 8 ASAR Validation Review - ESRIN – December 2002 L PF_ASAR MAY WS Chirp BW increase Patch Large echo shift (I) VV el. antenna Patterns Patch Large echo shift (II) First ASAR interferogram AUG. HH el. antenna patterns IM/AP Chirp BW increase WV patch WSM timeline change Azimuth patterns EC factors for V&H OCT. WV mode gain adj. 1 st K0 issue PF-ASAR Preliminary miss- pointing results APR.JUNE IM/AP gain adj. Patch small echo shift SEP. PF-ASAR 3.01 First IM/WS interferogram NOV. AP SWST change patch PF-ASAR 3.02 VH and HV el. antenna patterns MAR.. 1 st image Check up of all modes First synthesized patterns ScanSAR beam coef. update EVR ECR JUL. 2 nd K0 issue History of the C.P. Main Activities DEC. GM patch PF-ASAR 3.03 Wave level 2 implemented

Page 9 ASAR Validation Review - ESRIN – December 2002 Organisation of the ASAR Validation Review Instrument Status update Processor Verification update Product Verification and Quality for IM, WS, AP, GM Wave Product Validation After the Commissioning Phase. Summary & Conclusions.