Tar-Pamlico Watershed Assessment. Proposed Water Quality Improvement Projects Improvement project types Model scenarios Targeted projects Stakeholder.

Slides:



Advertisements
Similar presentations
Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Advertisements

Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
Protect and Restore Little Salmon River Project # Nez Perce Tribe Fisheries/Watershed Program By Chad Fealko.
1 Nicole Carlozo NOAA Coastal Management Fellow June 7, 2013 Integrating Water Quality and Coastal Resources into Marine Spatial Planning in the Chesapeake.
Agua Hedionda Watershed Management Plan Copyright © 2005 Kenneth & Gabrielle Adelman. All rights reserved.
Charlotte-Mecklenburg Storm Water Services Welcomes ASU and the Town of Boone To Our Side of the Storm (How to manage the “perfect Storm”)
Total Maximum Daily Load (TMDL) Implementation Plan Development John McLeod VA Dept. of Environmental Quality February 12, 2014 Chuckatuck and Brewers.
Stream Corridors Christine Hall Natural Resources Conservation Service North Jersey RC&D Slides 1-12.
Regional Coordination for Implementation of Source Water Protection Projects October 24 th, 2013 Kelly Anderson Philadelphia Water Department’s Source.
North Carolina Ecosystem Enhancement Program (NCEEP) Project Implementation.
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
Project Ranking Results Presented at the 8 th Stakeholder Meeting Hal Bryson, EEP Western Watershed Planner January 12th, 2010.
1 United Water Delaware “Cut the Crypto” Watershed Control Plan 1 Nancy Trushell, P.E. Director of Engineering United Water Delaware.
December 3, 2012 Laurel Woodworth Center for Watershed Protection.
Stevens-Rugg Brook: Diversion Structure Improvement Alternatives St Albans, Vermont.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
MOBILE, ALABAMA. Dog River Alabama Dog River and its tributaries drain most of Mobile, Alabama. Those tributaries range from relatively pristine streams.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan CAC Meeting 2 - Implementation.
Butte Creek Sources to Chico T. E. Chapman CE 296B Assignment #4.
Presenter: Karen Fligger, EPA. Stormwater Generated by runoff from land and impervious surfaces such as paved streets, parking lots, and building rooftops.
Morgan and Little Creeks Local Watershed Plan Totten Center, NC Botanical Garden 3 November 2004 Chapel Hill, NC
Golf Course Water Resources Best Management Practices TOOLBOX  Project Overview  Your Role in the Project April 2009.
Loudoun Watershed Watch “ Restoring Loudoun Streams” LCSA Water Forum Presented by: Darrell Schwalm Loudoun Watershed Watch Loudoun Wildlife Conservancy.
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
Green Infrastructure Case Examples. Many components can make up a GI strategy Green Infrastructure Strategy Describing Cores, Hubs Protection and Restoration.
Center for Watershed Protection USDA Forest Service, Northeastern Area, State and Private Forestry How to estimate future forest cover in a watershed.
Agua Hedionda Watershed Management Plan Watershed Planning Group Meeting June 5, 2008 Carlsbad, CA.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
CHAPEL HILL HIGH SCHOOL ISLAND PROJECT Water: The Essential Ingredient & Thoughts for Sustainability ©Town of Chapel Hill Stormwater Management Division.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Lessons Learned from BMP evaluation studies in the nontidal streams and river in the Chesapeake Bay Watershed Katie Foreman University of Maryland Center.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
BOOKER CREEK WATERSHED PLAN WATERSHED ASSESSMENT WETLAND ASSESSMENT POLICY FRAMEWORK.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Fort Monroe: Opportunities for Chesapeake Restoration and Citizen Engagement Fort Monroe Federal Area Development Authority July 16, 2009 Christy Everett.
Coos Watershed Association Watershed Restoration Projects.
SAGHA Annual Homeowners Meeting August 28, Agenda  Collect ballots  Treasurer’s Report  Common Area Maintenance Presentation  Election Results.
Opequon Targeted Watershed Partner’s Meeting – BMPs Cully Hession, Jim Lawrence, and Andrea Ludwig October 19, 2007.
Lake Raleigh Wetland Creation Feasibility Study NC State Centennial Campus Melanie Carter, Jennifer Burdette, Amanda Jones.
Lessons Learned from BMP evaluation studies in the nontidal streams and river in the Chesapeake Bay Watershed Katie Foreman University of Maryland Center.
Urban Watershed Restoration: Putting Plans Into Action Tanis Douglas Bowker Creek Initiative Coordinator Capital Regional District, Victoria BC.
State of the Streams Loudoun County: 2005 Loudoun Strategic Watershed Management Planning Conference February 23, 2006 Presented by: Darrell Schwalm Loudoun.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
A Traditional vs. Ecosystem Services Approach to Surface Water Management September 16, 2010 PRESENTED BY Carol Murdock, Clackamas County WES Mark Anderson,
15 Feet : Minimum Width for Zone 1 Zone 1 Functions: Bank Stabilization Shading (water temperature control) Flood Protection Stream Inputs: Structural.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Riparian Land Management Riparian Opportunities in Simpson.
Land Uses & Water Pollution Sources By Joan Schumaker Chadde, Western U.P. Center for Science, Mathematics and Environmental Education. All photos by Chadde,
Land Use. How We Use Land Urbanization of areas is becoming a problem. Thousands of acres of open space just in Pennsylvania have been lost to development.
STORM WATER SOLUTIONS FOR EXISTING URBAN AREAS: IDENTIFYING SITES TO MAXIMIZE RESULTS Jared Bartley, Cuyahoga SWCD September 8, 2011.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | September 28, 2015 Land Use Management Ordinance Update.
Durham County Soil & Water Conservation District January 28, 2016 Michael Dupree.
Stormwater and our Local Watersheds Green Night in Roselle May 7, 2009.
Why Watersheds Matter Tuesday, August 16, 2016
Green Stormwater Infrastructure and Park Improvements
Hinkson Creek Collaborative Adaptive Management (CAM) Process
WENDELL PARK STORMWATER IMPROVEMENTS
Henrico County Stream Assessment / Watershed Management Program
Restoration practices: one size does not fit all
The potential for microbial nutrient cycling processes in urban soils
Economic Study for Watts Branch Stream Restoration N. E
Duke Campus Duke’s campus surface has become more impervious as West Campus continues to be developed One of the five core facilities operations is dedicated.
Kristel Riddervold Environmental Sustainability Manager
Davie County Comprehensive Land Development Plan
Stream Management Implementation Program Schoharie Watershed Advisory Committee Meeting October 24th, 2018.
Presentation transcript:

Tar-Pamlico Watershed Assessment

Proposed Water Quality Improvement Projects Improvement project types Model scenarios Targeted projects Stakeholder input

Improvement Project Types Stream restoration Wetland restoration Riparian buffers (woody & herbaceous) BMPs (stormwater wetland, bioretention, swales)

Crisp Creek Proposed Improvement Projects 24 Riparian Buffer Projects 3 Stream Restoration Projects 11 Wetland Restoration Projects

Hendricks Creek Proposed Improvement Projects 7 Riparian Buffer Projects 8 Stream Restoration Projects 3 Wetland Restoration Projects 7 BMPs

Green Mill Run – Proposed Improvement Projects 8 Riparian Buffer Projects 2 Wetland Restoration/Enhancement Projects 2 Stream Restoration/Channel Improvement Projects 7 BMPs

Cow Swamp Proposed Improvement Projects 21 Riparian Buffer Projects 6 Swale Projects 3 Stream Restoration Projects 5 Wetland Restoration Projects

Project Pollutant Removal GMRPublic≤ 3 ownersAll Projects TSS0%7%14% P7%27%51% N1%22%25% HDKPublic≤ 3 ownersAll Projects TSS2%12%77% P3%8%79% N5%12%37%

Project Pollutant Removal COWPublic≤ 3 ownersAll Projects TSS-23%73% P-23%71% N-19%55% CSPPublic≤ 3 ownersAll Projects TSS-*45% P-*57% N-*40% * Martin County parcel data was not available at time of modeling

Targeted Proposed Improvement Projects

Crisp - Project 17 Buffers & Wetland Restoration Wetland Restoration Buffers Edgecombe Martin County Line Property

Crisp Creek Project 17 Wetland Restoration Stream network is ditched Little existing woody riparian vegetation NCCREWS depicted area as potential wetland restoration Up to 88 acres of wetland restoration proposed 6,450 linear feet of woody buffer proposed Constraints: some area is under drainage district jurisdiction

Crisp Creek Project 5 Wetland Restoration 5. Wetland Restoration Existing Wetland Project 8 Project 6 Project 7

Crisp Creek Project 5 Wetland Restoration Project would expand existing wetland NCCREWS depicts area as wetland restoration potential 40 acres of wetland restoration proposed Constraints: loss of cropland

Hendricks Project 4 Stream Restoration 4. Stream Restoration Project 5. Stream Restoration Project 3. Stormwater Wetland Hilma Country Club Redevelopment Commission of Tarboro Town of Tarboro

Hendricks Creek Project 4 Stream Restoration Eroding banks, invasive and exotic riparian vegetation 3,250 linear feet of stream restoration proposed on Hendricks Creek Constraints: existing sewer line and multiple property owners

Hendricks Project 13 Stream Restoration Stream Restoration Phase I Tarboro High School (Edgecombe County Board of Education) Edgecombe County Board of Education Braswell Center (Town of Tarboro)

Hendricks Creek Project 13 Stream Restoration Eroding banks and thin riparian buffers Stream Restoration -Phase I: 1,340 linear feet Phase II: 1,800 linear feet Constraints: existing sewer line and multiple property owners

Hendricks Project 5 Stream Restoration Hilma Country Club

Hendricks Creek - Project 5 Stream Restoration Stream is slightly incised with severely eroding banks Riparian buffer is narrow with invasive species 2,290 linear feet of stream restoration proposed Project would extend previous NRCS stream restoration project at Western Boulevard Constraints: existing large trees and stormwater inputs

Green Mill Run Project 1 Bank Stability & Stream Restoration City of Greenville Green Springs Park Bank Stability & Stream Restoration 10th St Stormwater Wetlands State of NC Wahl-Coats School

Green Mill Run Project 1 Bank Stability and Stream Restoration Eroding banks, poor habitat Stormwater wetlands proposed 2,640 linear feet of stream channel improvement proposed Constraints: steep banks, artificial hardening, limited space, existing infrastructure

Green Mill Run Project 8 Riparian Buffers Project 7. Greenville Country Club (In progress)

Green Mill Run - Project 8 Riparian Buffers 1,800 linear feet of woody riparian buffers proposed Project would treat runoff from cropland before it enters the Greenville Country Club stream restoration project Constraint: loss of cropland

Green Mill Run Projects 15&16 Riparian Buffers 15. Buffers 16. Buffers

Green Mill Run Projects 15 & 16 Riparian Buffers Urbanizing quickly, needs buffer before there is no space left 6,950 linear feet of woody riparian buffers proposed Constraints: multiple property owners, current residential development activities

Cow Swamp Project 2 Stream Restoration Stream Restoration Swale

Cow Swamp - Project 2 Stream Restoration and Swales 3,010 linear feet of stream restoration proposed; 1,430 linear feet of swales proposed Stream is currently incised with practically no riparian buffer Constraint: loss of cropland

Cow Swamp Project 25 Stream Restoration 25. Stream Restoration Project 14

Cow Swamp Project 25 Stream Restoration Photo shows downstream incision in channel (near confluence with Cross Swamp) 1,850 linear feet of stream restoration proposed Constraints: loss of cropland

Cow Swamp Project 27 Wetland Restoration 26. Wetland Restoration 27. Wetland Restoration & Buffers

Cow Swamp Project 27 Wetland Restoration & Riparian Buffers 7 acres of wetland restoration proposed 4,640 linear feet of woody riparian buffers proposed Constraints: loss of cropland

Questions/Comments?