Session 9 Guardrail Attachments to Bridge Ends

Slides:



Advertisements
Similar presentations
Barrier Design Principles. Principle 1: Distance from Roadway Place Guardrail As Far From Traveled Way As Practical.
Advertisements

ODOT Structure Project Manager Seminar Concrete Decks
Grimsby Secondary School
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
USING 2D DESIGN NPBHS WORKSHEETS 4 Motorcycle Fairing Creating tangential arcs & using connected lines.
Session 8 Type IX Crash Cushion CAT-350 Trinity Highway Products.
“You Could Learn a Lot About Guardrail From a Dummy…
Trinity Highway Products Properly Installed SRT Post HBA System-Slotted Rail Terminal
BalloonSat Construction Ideas and Suggestions L. Paul Verhage 9 July 2013.
By: Chou Lor, Safety Coordinator Fall Protection.
BalloonSat Construction Ideas and Suggestions. What is a BalloonSat? Functional Model of a Satellite Carried by Balloon to at Least 60,000 Feet Operates.
Handrail Assembly and Steel Stairs. Handrail Terminology u Guardrail –top most rail on balcony –higher than handrail u Vertical Rail –members between.
1 Westinghouse Non-Proprietary Class 3© 2012 Westinghouse Electric Company LLC. All Rights Reserved. Structural Analysis of a Nuclear Fuel Handling Machine.
Session 8 Type IX Crash Cushion CAT-350 Trinity Highway Products
Structural Principles and Landscapes Over Structure GSD 6242 Ecologies, Techniques, Technologies IV Spring 2015Niall Kirkwood FASLA Alistair McIntosh FASLA.
Maintenance of Traffic (MOT)
Midwest Guardrail System Without Blockouts J.D. Reid, R.K. Faller, R.W. Bielenberg, and K.A. Lechtenberg Midwest Roadside Safety Facility University of.
How to draw in 1 Point Linear An Artist’s Tool for showing Space and Form.
Protection against Lightning Overvoltages Overvoltages due to lightning strokes can be avoided or minimized in practice by (d) shielding the overhead lines.
Creating a section view using floor plans
 Project Delivery  Design Considerations  Lessons Learned.
MICE Meeting at Columbia University June 13, 2003 Implementation of argon gas jacket Edgar L. Black IIT.
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
Drafting Rear Elevations. Start with outer frame when drafting standard flat. Heights are generally in multiples of 2’-0”. Outer Frame.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
1.  Falls are the leading cause of death in construction  Falls from as little as 4 to 6 feet can cause serious lost-time accidents and sometimes death.
Direct Shear Test CEP 701 PG Lab.
TP4-ENERSOL-TD/PV double function
"Secure Wall" High Security Fence System * Patent Pending * Created and Fabricated by: South Lyon Fence Co., Inc.
Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const.
Plate and shell elements All the following elements enable to create FE mesh of a thin-walled body, with the thickness being one of the important input.
Fall Hazards.
Floor Framing Unit 29.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Crashworthiness Simulation of ET2000 Guardrail Extruder Terminal.
Wood Construction CTC-375.
© Penn State Food Safety and Sanitation for Food Manufacturers Course Equipment Sanitary Design.
Session 7 How Critical is it to Properly Install Guardrail End Terminals???
Session 9 Guardrail Connections to Bridge Ends. Common Deficiencies in Bridge Railings Inadequate Dynamic Strength Potential for Snagging Use of “Safety”
Session 3 Grading Requirements for Guardrail End Treatments.
FLARE Constructing the detector First FLARE Workshop November 4-6, 2004 Rafael Silva Fermilab / PPD / MD Fermilab Liquid Argon Experiments.
1 Construction Safety. 2 Construction Site …… A dangerous Workplace.
PPT Presentation of Planned Website Prepared for the Task Force 13 Meeting September 20, 2009 Rehoboth, Delaware.
There are 2 Types of Bridge Inspectors – Class B and Class A.
Chapter 23: Structural Drafting
Composite Construction
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
A View of NCSX Structural System and Load Path for the Base Support Structure.
College of Engineering, EEIC Ethical Dilemmas Ethical dilemmas arise when there are multiple Stakeholders with conflicting interests. Good ethical practice.
GA Tech Safety and Health Consultation Program Fall Protection in Construction Work Tool Box Session.
Design of Gantry Girders
Direct Shear Test.
Concrete Box Culverts (CBC)
There are 2 Types of Bridge Inspectors – Class B and Class A.
TYPES OF CHASSIS FRAMES
Poisson’s Ratio For a slender bar subjected to axial loading:
Differential Op - Amplifier TIM. 1 Introduction 2 Differential Amplifier: 2.1 Input Resistances: 2.2 Differential Gain: 2.3 Common Mode Input: 2.4 Common.
CPA Moment on the left is ~100*150kg/2.
Fall Hazards.
Competency: Draw wall sections and details.
Integrated Disposable
Poisson’s Ratio For a slender bar subjected to axial loading:
Fall Hazards.
FBE04 BUILDING CONSTRUCTION AND MATERIALS
Length of Need LR = dist for vehicle off the roadway to stop.
STEEL PLATES.
Poisson’s Ratio For a slender bar subjected to axial loading:
“Falling for Foreshortening”
“Falling for Foreshortening”
Fall Hazards.
Presentation transcript:

Session 9 Guardrail Attachments to Bridge Ends A very good bridge end connection on an APD Route in beautiful Easter KY

Common Deficiencies in Bridge Railings Inadequate Dynamic Strength Potential for Snagging Use of “Safety” Walk Inadequate Transition What common problems do we see in railings? To much deflection in the approach rail. The open face causes wheel snagging. The safety walk isn’t really “safe” and often causes vaulting. The transition and structural connections are usually inadequate also.

Transitions Guardrail Deflects – Bridge Ends DONOT!! Bridge End Connections are an example of a change in the type of Barrier Deflection Characteristics Must Reduce the Deflection of the Guardrail before you reach the Bridge End from 3’ to Zero Must have adequate Structural Connection When there is a change in the type of barrier deflection characteristics, particularly when going to a stiffer system, a transition is required. The most common example of this situation is a semi-flexible (3’ deflection) approach barrier connected to a solid bridge end (0’ deflection).

Transition Considerations Adequate structural connection to the bridge railing Reduced post spacing and nested rail to increase stiffness gradually Block outs and rub rails used to minimize snagging The transition between the bridge rail and guardrail is critical. These features are key to a good design

How can you REDUCE DEFLECTION of Standard Strong Post W-Beam Guardrail Normal Guardrail Post Spacing is 6’3” Reduce Post Spacing to 3’ 1½” and reduce deflection by 50% Nest the Guardrail (double thickness) and reduce deflection by 50% Add a Guardrail panel to the back of the Post and reduce deflection by 50% Add a Rub Rail and reduce deflection by nearly 50% & reduce snagging potential Combine 2 of the above and reduce deflection by 75% Remember this slide from the Guardrail Section??

How can you REDUCE DEFLECTION of Standard Strong Post W-Beam Guardrail Spacing Nested At Bridge approaches deflection is reduced by reducing Post Spacing to 3’ 1 ½” and reducing again to 1’ 6 ¾”. Nesting (2 Ply) the rail. Also a rub rail is added to reduce deflection and help prevent the right front tire from snagging on the bridge end.

Gradually Increase Stiffness by Increasing the number of Post The key to a successful transition design is to reduce the deflection of the approach guardrail uniformly until it is near zero at the end of the bridge. This is usually done by using more posts spaced closer together, using longer post, nesting rail and adding rub rail. Often, all of these changes are incorporated into a single transition design. It generally takes nearly 30’ of transition to go from 3’ to 0 deflection.

Rub Rail Components - Std Draw RBC-001 002 & 003 “Guardrail Connection to Bridge End Type A and A-1 Components” To keep the vehicle wheels away from the end of a rigid bridge railing, the rail must be positioned away from any likely snag points. Offset Blocks separate the guardrail from the guardrail posts, and with a w-beam, the lower rub rail keeps cars away from the lower face of the concrete parapet. The direction of the overlap where the w-beam is bolted to the terminal connector is also critical to minimize any snagging potential. Rub Rail Components - Std Draw RBC-002 & 003 “Guardrail Connection to Bridge End Type A and A-1 Components” Rub Rail Not Island Curb Rub Rail

Standard Drawing RBC-001 Guardrail Connector to Bridge End Type A and A-1

Inadequate Structural Connection or Stiffening of Approach Rail

Adequate Structural Connection Terminal Sect No 2 Plate A & B Terminal Section NO 2.and Connections completely through the concrete with a back up plate (Plate A)and beveled washers. Use a similar plate for the rub rail connection (Plate B). Rub Rail Components Plates see - Std Draw RBC-002 & 003 “Guardrail Connection to Bridge End Type A and A-1 Components”

Inadequate Reduction in Deflection and Structural Connection Because of inadequate reduction in the deflection of the guardrail before it got to the bridge and because the structural connection to the bridge was inadequate - the combination resulted in a fatality.

Transition of Curb and Rub Rail to Bridge’s Safety Shape Exit End of 2 Lane Bridge

Addition of a Spacer Tube The last item that helps keep an impacting vehicle from coming in contact with the Bridge End is the Spacer Tube.

Combination of all of the Proceeding for a Successful Transition Reduced post spacing Nested – 2 Ply Rail Rub Rail Spacer Tube Plates Island Curb – Transition to Safety Shape

Std Draw RBC-001 Guardrail Connection to Bridge End Type A and A-1 Reduced Post spacing 2@ 3’1 ½” and 6@ 1’6 ¾” 2 - 8’ W8 x 21 steel post 25’ W-Beam Guardrail (Single Face) 2 Ply C6x8.2 Rub Rail 6” ID x 9” Steel Spacer Tube Island Curb Curb Box Inlet Type B Terminal Sect No 2 Std Draw RBR-010 Plate A & Plate B Also Note 5 Island Curb

Curb Inlet Type B Should have Island Curb in Throat of the Inlet Std Draw RBD-280 “Match Adjacent Curb” Std Draw RBC-001 Note 5 “Island Curb” Std Draw RBC-001 Note 5 calls for a “Island Curb” Transition from Island Curb Shape to Shape on Bridge within 7’ 3”. See previous slide for full note if needed. Std Draw RBD-280 ‘ “Match Adjacent Curb”

Curb Inlet Type B Should have Island Curb in Throat of the Inlet Lt Std Draw RBD-280 Curb Box Inlet Type B (Detail Drawing) “Match Adjacent Curb” Rt Std Draw RDB-281 Curb Box Inlet Type B (Steel Drawing) "Island Curb Detail”

Type B Drainage Box As-Builts vs Type B Drainage Box As-Builts vs. Std Draw Construction memo No 5-11 July 6, 2011 Have not been getting Island Curb on Type B Inlet therefore a Const Memo was Issued See Std Draw RBC-001, RBD-280, RBD-281 Previous Slides Corrective Actions: Retrofit by extending the double ply rail from 25 linear feet to 50 linear feet Replace the drain box top with the correct one

Std Draw RDB-280 Curb Box Inlet Type B 2012 Design Changed Detail to Show Island Curb instead of Std Curb Our THANKS to Design for changing this detail to an Island Curb. Changed to Island Curb

Normally getting Standard Curb instead of Island Curb

What makes this a good Guardrail Connection to Bridge End? Q & A Time Reduced post spacing Nested – 2 Ply Rail Rub Rail Spacer Tube Plates Island Curb Transition the Safety Shape on the Bridge - But no Curb Box Inlet Type B